7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.

Slides:



Advertisements
Similar presentations
LINAC 4 Emittance Meter.
Advertisements

WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Safety aspects: electrical and gas safety, Cs handling, radiation & fire protection Matthias Kronberger, Mats Wilhelmsson On Behalf of the Linac4 ion source,
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 19 Nov 2014 F.Roncarolo 19 Nov
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
ESS DTL beam commissioning
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Ion Source and RFQ Douglas Moehs Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006 Thanks to Martin Stockli (SNS), Robert Welton (SNS), Jens.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
TITAN EBIT MCP Detector Assembly Cecilia Leung Undergrad summer student 2007 TRIUMF Summer Student Symposium Tuesday, July
UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Development of an H - plasma generator for SPL Matthias Kronberger, CERN BE/ABP-HSL SPL collaboration meeting, 2010/11/25.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
RF source, volume and caesiated extraction simulations (e-dump)
Developments of the FETS Ion Source Scott Lawrie.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
LINAC3 UPGRADE Strategy for the hardware modification of the GTS-LHC 18/3/2015 Ville Toivanen.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Wim Weterings Remy Noulibos
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Report Technical Director Storage-Ring-Installation Completed
A. Martynov on behalf of accelerator division.
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Pepperpot Emittance Measurements of the FETS Ion Source
How to run ions in the future?
Electron Source Configuration
One quarter of RFQ vessel + vacuum pumps and supports
HIE-ISOLDE contribution packages
commissioning and measurements
ISRC and LEBT Vacuum System Design
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Two-beam Test-stand Design and Construction Status
Presentation transcript:

7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber New LINAC4 Faraday cage LEBT + Diagnostic Support for B357 LINAC4 SPL Plasma generator + 2 Cesium oven Plasma Generator BNL Developments (2011 – 2014): New RF Plasma Generators Design and Production of:

7/06/20112 New LINAC4 Front end Chamber 1/4 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre

Design of new Front end Chamber - Multi-stage Extraction - Differential Pumping - Tilt and Alignment System for Electrode 2 - Ceramic Insulator 7/06/20113 New LINAC4 Front end Chamber 2/4 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre

Plasma Generator Electrode 1 (Fixe) Electrode 2 (Tilt able and Movable) Electrode 3 (Fixe) Einzel Lens Cesium Protection 20 kV Connexion 10 kV Connexion LEBT Pumping Volume 1 Pumping Volume 2 Pumping Volume 3 Insolator 2 PEEK Isolator 1 Ceramic 7/06/20114 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New LINAC4 Front end Chamber 3/4

Raw Material Order 7/06/20115 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New LINAC4 Front end Chamber 4/4 Pre-design Details-design R&D Activity: tight but feasible depending on technical choices Beam Optics

7/06/20116 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New LINAC4 Faraday cage 1/3

Faraday Cage 7/06/20117 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New LINAC4 Faraday cage 2/3 Lifting and manipulation systems 500 Kg

New LINAC4 Faraday cage 3/3 7/06/20118 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Lifting and manipulation systems 500 Kg

LEBT + Diagnostic Support for B357 7/06/20119 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New LEBT Support: Design from LINAC4 Delivery during the summer Installation in Sept For Diagnostic Components see R.Scriven & U.Raich Presentation.

LEBT + Diagnostic Support for B357 7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4Source Test stand Drawing Modifications required for Linac4 Qnty for Linac4 Delivered to contact New drawings required for Source Test Stand (b357)# Source Test standDelivered to contact Main Workshop production - comments SolenoidYes25/1/2012Yes27/1/2012 Feet, alignment arms, vacuum chamber Steeers No27/1/2012Feet Faraday Cup No16/1/2012Yes SEMGrid profile monitor Yes (very small)16/1/2012 Yes - Modifications to polarisation may impact on drawings Diagnostic tank Yes (modify old tank)15/1/2012Yes16/1/2012Yes Pre-ChopperYes15/1/2012Yes17/1/2012Yes Beam Current Transformer No16/1/2012Yes Ion Trapping electrodesYes15/1/2012Yes17/1/2012Yes Emittance Meter Yes (some)14/1/2012Yes - Modification of slit actuators Girder No1 Yes - already launched

LINAC4 SPL Plasma generator + 2 Cesium oven 1/2 Modification of existing SPL Design Plasma Generator + Cesium Injection 7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre

LINAC4 SPL Plasma generator + 2 Cesium oven 2/2 7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre

7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Plasma Generator BNL 1/2 3D models from BNL Drawings Modification for LINAC4 fitting New drawing Production Test

7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Plasma Generator BNL 2/2 Design Validation

Plasma Generator proto 01 Jan- May 2012 Nov 2012 Plasma Generator proto 02 Nov 2012 May 2013 Plasma Generator proto 03May 2013 Nov 2013 Plasma Generator proto 04Nov 2013 May 2014 Design Production Design of new plasma generator + Modification of extraction 7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre New Plasma Generator (2011 – 2014) First Estimation for Design and Manufacturing 30 mA 50 mA

New LINAC4 Front End ChamberApr-11Dec-11Jun-12 New LINAC4 Faraday CageJul-11Sep-11Dec-11 LEBT + Diagnostic Support for B357 Apr-11Sep-11 Diagnostic Components Under Investigation LINAC4 SPL Plasma generator + 2 Cesium ovenJun-11Nov-11 May-12 Plasma Generator BNLJun-11Dec-11Sep-12 Plasma Generator BNL (Spare)Sep-12Nov-12Jun-13 Developments (2011 – 2014): Plasma Generator proto 01Dec-11May-12Nov-12 Plasma Generator proto 02May-12Nov-12May-13 Plasma Generator proto 03Nov-12May-13Nov-13 Plasma Generator proto 04May-13Nov-13May-14 Design Manufacturing 7/06/ Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Summary Design Manufacturing First Estimation: Tight but feasible depending on technical choices 0.8 FTE/Year (CERN Staff) kChF Design Office Support 1.5 FTE/Year (CERN Staff) kChF Manufacturing 500 kChF Design Office Support + Manufacturing Awaiting confirmation