INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.

Slides:



Advertisements
Similar presentations
F AST T RACK REMOTE SWITCH WIRING SET UP FOR THE LIGHT BoardPlug Power strips relay Wiring Harness.
Advertisements

Doors and Windows.
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Presentation Overview
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
(2) Rules of Construction. How Thick or thin Size Analysis of Real Construction.
Continuous Insulation for Code- Compliant, High-Performance Walls pima.org.
Select New Project from Project menu to create a new project File.
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Visitability Standards Dan McNabb, Deputy Building Official Planning and Development Review Department.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
Florida Product Approval System Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL
Structural.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Fire.
You’re the Driver. What’s your target? The warning sign.
Construction Drawings for Graphic Communication A building or construction project requires a complete set of specialised drawings. These drawings are.
Building science.
CONTINUOUS INSULATION PRIMER. PART 1 – Continuous Insulation Definition (ASHRAE 90.1)ASHRAE 90.1 Applications: Roof, Wall, and Foundations.
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
Manufacturer’s Recommendations
Continuous Insulation for Code-Compliant & High Performance Walls.
 Real Estate Clerk – performs clerical duties at a real estate office  Real Estate Broker - attempts to find sellers who wish to sell and buyers who.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Types of Housing. Single-Family designed to house one family. Multi-Family designed to house more than one family.
Building Plans.
Chapter 20 Doors and Windows. Chapter 20 Doors and Windows.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
CAS RATEMAKING SEMINAR PROP-31 CURRENT ISSUES IN FLORIDA PROPERTY INSURANCE RATEMAKING By David R. Chernick.
Island Adventures: Insulating Unique and Unusual Structures Juvenile Detention Facility: Part 2 Baton Rouge, LA Presented by Rita A. Smith, AIA Russell.
Computer Aided Manufacturing BIM Curriculum 10. Topics  Definitions  CAM in the AEC Industry  CAM Workflow with BIM  Case Studies.
Cladding attachment.
Engineering Analysis of NFPA 285 Tested Assemblies
Planometric Views (room corner). GC Credit Paper – 2002 – Question 3 An Elevation and Plan of a room layout are shown. Using the given sizes and start.
Chapter 32 Drawing Framing Plans.
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
Residential Floor Plans
AIR BARRIER REQUIREMENTS. Energy Code - Air Barrier Requirements Material air permeability ≤ cfm/ft 2 per ASTM E2178 (IECC 2012 C )IECC.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
The Glenrose assembly Instructions By Laser Dollhouse Designs.
DSA Fire and Life Safety SDFPA, February 2009 Craig Rush DSA Regional Manager.
Metal Work in Masonry Module
Making Picture of construction Application
Do Now #7 What are the dimensions of the footing?
Learning Objectives • Understand the concept of doors.
New MSU Box for Capital Reports
Construction Drawings for Graphic Communication
VIEW SERIES Track Assembly & Installation
A MODEST PROPOSAL TO DISRUPT THE WAY BUILDINGS ARE BUILT
Continuous insulation primer
STEP 1: ASSEMBLE ANGLE PLATES
Millwork A Guide to Doors.
HOW TO FIX QUICKBOOKS RUNTIME ERROR ON WINDOWS 10?
Millwork A Guide to Doors.
LiveText – Student – Field Experience Management Module
Section and Details Vocabulary and Basic Information
The Abriana Assembly Instruction By Laser Dollhouse Designs
יחסים בין אחים כמראה ליחסי ה- Attachment במשפחה
Activity 4.2.8d Satellite Flight Path Construction Guide
The Garage Assembly Instruction By Laser Dollhouse Designs
Popsicle House.
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
Қош келдіңіздер!.
Информатика пән мұғалімі : Аитова Карима.
Now Buy Best External Door Hardware from Doorhardware
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

INSTALLATION DETAILS

Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details for plan approval – TER No TER No – Provides path for code compliance and approval – DXF files also available. Contact Staff.

Window and Siding Installation Details with Thick Foam Detailing of CI wall assemblies with 6"+ of foam DOE’s Building America Program Alaska REMOTE house Passivhaus design Net-zero buildings – TER No (limited to 2” FPIS) TER No

Detailing Tips If no more than 2” of CI on a 2x4 wall – Total wall thickness for window and door frames is no different than 2x6 construction – 3.5” + 2” = 5.5” For thicker applications of CI: – May need to “box out” window and door openings – Corner/trim details required – Furring can provide siding attachment and positive securement