Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.

Slides:



Advertisements
Similar presentations
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
TQS Overview and recent progress
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
ERMC/RMM activities May 2017
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
MBHSP02 test STATUS and first results
MQXF coil cross-section status
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Cross-section of the 150 mm aperture case
Electrical integrity of magnets and coils
Presentation transcript:

Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet

Outline 12/16/20102H. Felice - HQ Test Results Review HQ Magnet overview Coil Design and Fabrication HQ01a / HQ01b / HQ01c main features

HQ Overview 12/16/20103H. Felice - HQ Test Results Review 4.4 K1.9 K Short sample current I ss (kA) Gradient at I ss (T/m) Peak field at I ss (T) Stored energy at I ss (MJ) Fx / Fy at I ss per octant (MN/m)2.7/ /-4.7

Coil Design 12/16/20104H. Felice - HQ Test Results Review Bare cable width: mm Bare cable mid-thickness: 1.44 mm Keyston angle: 0.75 Insulation thickness: 100 microns Coil 6 Coil 6 LE RE End design

Coil fabrication status Coil # Cable number Strand type Reaction Potting Status 1992R54/61LBLHQ01a/HQ01b/HQ01c 3rd 2992R54/61BNLHQ01a 3991R108/127LBLHQ01a/HQ01c / at FNAL 41000R108/127BNLHQ01a/HQ01b 51000R108/127BNLHQ01b/HQ01c 3rd 61000R108/127BNLHQ01b 71000R108/127LBLHQ01c 3 rd assembly 8996R54/61BNLHQ01c 3 rd assembly 9996R54/61BNLImpregnated 10996R54/61LBLReacted – broken strands RCDP 108/127 (Ti)BNLPrep for impregnation /61 (Ta) with SS coreLBLPrep for reaction /61 (Ta) 1 passBNLShipped to BNL (1turn less) or /61 (Ta) 1 pass or (Ta) 1 passLBLStart in May 11 15??BNLStart in June 11 16??LBLStart in July 11 12/16/20105H. Felice - HQ Test Results Review

Coil fabrication process Winding and curing layer 1 Winding and curing layer 2 12/16/20106H. Felice - HQ Test Results Review Reaction

Impregnation and Instrumentation Hipoted Trace placed on top of reacted coil - Layer 1 and Layer 2 -Protection heaters - Voltage taps Layer 1 Layer 2 - Voltage taps wiring - Strain gauges mounting and wiring 12/16/20107H. Felice - HQ Test Results Review

HQ Assembly Coil pack assembly Collar / Pad bolting 12/16/20108H. Felice - HQ Test Results Review Bladder operation Axial loading

HQ01a Azimuthal stress distribution 12/16/20109H. Felice - HQ Test Results Review After cool-down:    (MPa) At 14 kA   Agreement with SG measurements

Protection Heaters – General scheme 12/16/201010H. Felice - HQ Test Results Review Rstrip = 6 ohm VHFU IHFU = 4 X Iheater A Layer 2 Layer 1 Lead A01A02 B02 B01 A01 A02 B01 B02 4 circuits of PH powered by capacitor banks (Heater Firing Units HFU) MIITS kept below 11 during the tests => hot spot T around 150 K

Instrumentation 10 vtaps per layer Layer 1 Layer 2 12/16/201011H. Felice - HQ Test Results Review Mid-plane vtap missing in some coils => impact quench location conclusion

Splice Design Splice monitoring in all HQ tests 2 NbTi leads Nb 3 Sn coil lead 2 NbTi leads Nb 3 Sn coil lead Splice monitoring in next coils Unreliable splice signals 12/16/201012H. Felice - HQ Test Results Review

Splices in HQ magnets 7581 Layer 1 L L1 L2 Impact on current distribution? Will be fixed in next magnet 12/16/201013H. Felice - HQ Test Results Review Dual NbTi leads stacked on the VCL flags

HQ01a (+) Coil 2 54/61 BNL Coil 4 108/127 BNL Coil 3 108/127 LBL Coil 1 (-) 54/61 LBL 12/16/201014H. Felice - HQ Test Results Review Limiting coil: coil #3 Visual inspection: coil 3: no damage observed coil 2: trace damage Led to: structure inspection modification of the ground insulation thickness to improve the matching between coil OD and collar ID impulse test performed after test => failure of coil #2 Replacement of coils #2 and #3 in HQ01b

Coil distribution per magnet HQ01aHQ01b (+) Coil 2 54/61 BNL No pole gap Coil 4 108/127 BNL Gap - pinned Coil 3 108/127 LBL Coil 1 (-) 54/61 LBL (+) Coil 6 108/127 BNL Coil 4 108/127 BNL Coil 5 108/127 BNL Coil 1 (-) 54/61 LBL 12/16/2010H. Felice - HQ Test Results Review15

HQ01b – Observations and Csqs Observation and questions Strong noise recorded during test => arcing Test ended due to coil #6 failure Visual inspection: coil 6 damaged => hole seen at RE insulation failure Consequence on the coil layout Thicker interlayer insulation Interlayer of the shoe were softened - layer 1 OD - layer 2 ID => Only starting with coil 10 12/16/201016H. Felice - HQ Test Results Review Coil voltages Derivative mode

Impulse test Implemented in HQ001c - Requirements for all coils to pass the impulse test at 1000 V 12/16/201017H. Felice - HQ Test Results Review Coil 7 Example of a failure (coil 4)  s Failing coils coils 2 after HQ01a disassembly coil 4 after HQ01b disassembly coil 3 passed after HQ01a assembly but failed after subsequent assembly/disassembly

HQ01c - Hipot results 12/16/201018H. Felice - HQ Test Results Review HQ01aHQ01bHQ01c Hipot procedure: -Coil to end-shoe 500 V - Layer 1 end-shoe to Layer 2 end-shoe500 V implemented in HQ01c - Coil to PH 1000 V - Coil to coil 500 V - Coil to structure 1000 V Coil to all PHs Coil to LE shoes LE shoe to PH L2 RE L1/L2 shoe Coil 1 Coil to PH LE shoe to PH L2 Coil 1 Coil to PH Coil 4 Coil 5 Coil 6 OK Coil to L1 PHs RE L1/L2 shoe Coil 8 LE L1/L2 shoe RE L1/L2 shoe Coil 5 Coil 7 OK Coil to LE L2 shoe LE shoe to PH L2 Coil 1 Coil to LE L2 shoe Coil 2 Coil to LE L2 shoe Coil 4 Coil 3 OK

Coil distribution per magnet HQ01aHQ01bHQ01c (+) Coil 2 54/61 BNL Coil 4 108/127 BNL Coil 3 108/127 LBL Coil 1 (-) 54/61 LBL (+) Coil 6 108/127 BNL Coil 4 108/127 BNL Coil 5 108/127 BNL Coil 1 (-) 54/61 LBL (+) Coil 7 108/127 LBL Coil 8 54/61 BNL Coil 5 108/127 BNL Coil 1 (-) 54/61 LBL 12/16/201019H. Felice - HQ Test Results Review

Coil 10 after reaction 12/16/201020H. Felice - HQ Test Results Review Layer 1 RE Layer 1 and 2 RE Coil 6 Inspection of limiting /failing coils in HQ tests - Coil 6: failing coil in HQ01b After etching of the copper => no sign of fractured strand - Coils 3 and 1 under investigation - Variable reaction condition investigated

Summary 12/16/201021H. Felice - HQ Test Results Review 3 tests: HQ01a, b and c with common features Coil fabrication procedures Instrumentation Assembly and mechanical coil preload Clear insulation integrity failure exhibited in HQ01b modification of the interlayer insulation scheme Electrical QA improvement: Impulse test High rate of impulse test failure in the first coils (post-tests/loading): 2, 3 and 4 Some coil weaknesses/defect caused by the fabrication process (coil 10) being investigated with “test coils” => future coil review