MDI towards technical design Lau Gatignon. Very preliminary ! To trigger discussions.

Slides:



Advertisements
Similar presentations
Lau Gatignon / CERN for MDI team. MDI is very different between ILC and CLIC:  Organization wise (ILC in experiments, CLIC on machine side)  QD0 technology.
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
CLIC MDI Working Group QD0 external reference structure A. Gaddi, H. Gerwig, H. Hervé, N. Siegrist, F. Ramos.
Machine Detector Interface Lau Gatignon / CERN-EN.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
CLIC FF MAGNET AND IR LAYOUT Lau Gatignon / CERN-EN for the CLIC MDI team & related WG SC-FF
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
First calculations of the CLIC Antisolenoid system A. Bartalesi, M. Modena - CERN.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
CLIC MDI STATUS Lau Gatignon / CERN On behalf of the MDI Working Group LCWS13, Tokyo, 12 November 2013.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
CLIC MDI Lau Gatignon / CERN for the MDI team & related WG IWLC10 workshop
MDI Status and Plans Lau Gatignon / EN-MEF On behalf of the MDI working group.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
MDI Action plan Presented by Lau Gatignon 6 October 2009.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
PACMAN : technical objectives Hélène Mainaud Durand.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Machine Detector Interface
on behalf of the CLIC active pre-alignment team
Installation of an Instrument on a CERN machine
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
M.Jonker CTC MPO-WG status
CLIC Study Aim Conceptual design report in 2010
CLIC-ILC BDS & MDI work.
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Extract from today’s talk given to DCB
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

MDI towards technical design Lau Gatignon

Very preliminary ! To trigger discussions

QD0 quadrupoles Support tubes MACHINE DETECTOR INTERFACE Vacuum IP Feedback Beamcal+ Lumical Anti-solenoid +Stabilization + prealignment Plus others ………..

CONTENTS Introduction QD0 Magnet Stabilization QD0 support & pre-isolation Pre-alignment IP-Feedback Anti-solenoid Instrumentation Vacuum Overall integration Safety Backgrounds Other issues

ACE meeting 2 February 2011

MDI MEMBERS R.Appleby, A.Apyan, B.Bartalesi, M.Battaglia, E.Bravin, H.Burkhardt, P.N.Burrows, F.Butin, B.Dalena, K.Elsener, A.Gaddi, M.Gastal, L.Gatignon, H.Gerwig, C.Grefe, E.Gschwendtner, M.Guinchard, A.Hervé, A.Jérémie, Th.Lefèvre, L.Linssen, H.Mainaud-Durand, S.Mallows, M.Modena, J.Osborne, Th.Otto, C.Perry, F.Ramos, J.Resta Lopez, A.Sailer, H.Schmickler, D.Schulte, N.Siegrist, J.Snuverink, E.Solodko, R.Tomas Garcia, D.Tommasini, R.Veness, J.Vollaire, A.Vorozhtsov, V.Ziemann, F.Zimmermann

QD0 Magnet M.Modena, A.Vorozhtsov, A.Bartalesi, E.Solodko et al

QD0 Magnet Construct and test short prototype Gradient, field quality, vibration modes, radiation hardness, impact of external fields Finalize design, construct and test full length models of QD0 and QF1 Gradient, field quality, stability Design and build field measurement device for long and small apertures with required precision Tests some prototype in beam line (ATF2, CERN-NA or other) In collaboration with stabilization team

SS QD0 Stabilisation A.Jeremie et al (LAPP/Annecy)

Stabilization Finalize choice of sensors (relative and absolute) and actuators Analyze vibrational modes of final QD0 magnet and optimize stabilization strategy accordingly Design and validate design of stabilization foot Finalize integration in support tube Simulation and test in realistic environment of stabilization performance Cooperation with other luminosity stabilization systems including data communication with other systems Stabilisation for L* = 6 m solution

QD0 Support and Pre-isolator A.Gaddi, H.Gerwig, F.Ramos et al

QD0 support and pre-isolation Finalize analysis and tests with pre-isolator prototype Based on these results, finalize design of full-scale pre- isolator Finalize design of QD0 support tubes, taking into account constraints from integration Construct and test one pre-isolator + support tube assembly and validate performance Combined test with stabilized QD0

P Pre-alignment (including QD0) H.Mainaud-Durand et al

Pre-alignment Execute agreed work packages with NIKHEF Complete/update CDR chapter accordingly Test and validate rigidity of CAM mover system and demonstrate compatibility with stabilization requirements As a result make full simulation of RASNIK system with realistic light transport channels through detector Validate stretched wire approach for 500 m length Full design of stretched wire system, compatible with integration and push-pull constraints.

IP-Feedback Ph.Burrows, J.Resta Lopez et al

IP Feedback Continue tests and design to optimize latency Optimize feedback algorithms One or two sides, sensitivity to background (using detector MC) Continue full simulations, including other feedback and feed- forward systems and isolation + stabilization Studies of radiation hardness and B-field tolerance Final engineering, taking into account integration constraints Solution for L*= 6 m implementation of QD0

Anti-solenoid B.Dalena, A.Bartalesi, A.Sailer, A.Gaddi, H.Gerwig et al

Anti-solenoid Complete a realistic design Confirm choice of super-conducting technology Good main solenoid compensation Take into account effect of permendur on field configuration Minimize deformation of main solenoid field Integration with detector layout and QD0 support Validate that luminosity performance is adequate Coupling of anti-solenoid and main solenoid Protection of QD0 (permendur, permanent magnets)

Instrumentation In collaboration with other working groups, arrive at final design and integration of beam instrumentation relevant for the IP This includes the instrumentation for the IP feedback, but also luminosity monitoring in the post-collision line Follow-up of discussions related to polarization

Vacuum in IR region R.Veness et al

Vacuum Final design of all vacuum systems involved, including specification of all vacuum tubes/tanks, valves and pumps Calculation of static and dynamic vacuum pressures in BDS, IR and post-collision lines Validate that the impact on beam dynamics and luminosity is acceptable

Integration H.Gerwig and many others

Integration Work out in more detail the L*=6 m backup solution and compare with L*=3.5 m (luminosity, acceptance, stabilisation, etc) Follow-up evolution of detector designs For both detectors or eventual new detector designs In particular impact of changes close to beam Together with BDS teams, finalize choice of L* Can one agree on a single L*, which one? If needed, is it possible to have two different L* ? Work out solution with QD0 in the tunnel, first conceptually (1 year?), at a later stage also technically. Compare with L* = 3.5 m. Design and construction of push-pull platforms Optimize time for push-pull operation Detailed integration with civil engineering and services

Safety Agree with safety and civil engineering on all general safety aspects in the surface and underground areas Fire safety, smoke extraction, ventilation, RP, escape routes, etcetera Finalize RP simulations with final BDS and detector layouts Are detectors self-shielding enough? Shielding cavern-garage,... RP implications (if any) of muon backgrounds from BDS Evaluation of all accident scenarios. Requirements for MPS Design shielding accordingly Evaluate whether big shielding doors are necessary. Thickness? Cryogenic safety issues

Backgrounds Collaborate with BDS, Post-collision line and LCD to evaluate and minimize backgrounds from machine, dumps and IP Evaluate, together with BDS, the impact of muons and their cleaning on the IR in terms of RP safety and backgrounds Confirm that Beamcal ad Lumical are sufficient to serve as masks against neutrons from the various dumps Finalize integration of post-collision line in IR

And everything else …….

Other issues Continue to coordinate between different working groups Magnets, stabilization, post-collision line + dumps, BDS, LCD, CES Establish link between detectors and CES group for specification of all services and their integration Work towards full and more precise cost estimate Provide relevant chapters in Project Preparation Plan Prepare first version of Safety File

Spare slides

TopicMain contributors QD0 magnetM.Modena, A.Bartalesi, E.Solodko, A.Vorozhtsov, QD0 stabilizationA.Jérémie, G.Balik, B.Bolzon, L.Brunetti B.Caron,G.Deleglise, L.Pacquet QD0 support, pre-isolationA.Gaddi, H.Gerwig, F.Ramos Pre-alignmentH.Mainaud-Durand IP FeedbackP.N.Burrows, J.Resta Lopez, C.Perry Anti-solenoidB.Dalena, A.Bartalesi, M.Modena, H,Gerwig, A.Gaddi InstrumentationTh.Lefèvre, E.Bravin VacuumR.Veness Spent beam mattersE.Gschwendtner, A.Apyan Overall integrationH.Gerwig, A.Hervé, A.Gaddi, K.Elsener, N.Siegrist ShieldingF,Butin, H.Gerwig SafetyJ.Vollaire, S.Mallows CE and Services interfaceM.Gastal, J.Osborne BackgroundsA.Sailer, B.Dalena, H.Burkhardt Other topicsK.Elsener, L.Linssen, M.Battaglia, D.Schulte, J.Snuverink, R.Tomas Garcia, D.Tommasini, V.Ziemann, F.Zimmermann

Stabilization (2) In particular (Annecy groups): Collaboration model Continue characterization of vibration environment (correlations) Continued sensor studies, in particular capacitive gauges and chemical sensors Continued actuator studies and control loop optimization Calculations on vibration modes of QD0 and support structures and combine those with pre- isolator and feedback loops in overall simulations Contribute to integration with other IR equipment, supports, controls, etc (CERN responsibility) Tolerance studies with respect to external magnetic fields and radiation Construction of full prototype with test in real life (ATF2 or lab?) Liaison with MDI and stabilization working groups. Documentation