1 STATIC pre-CDR Peer Review, May11 2011 STATIC pre-CDR Peer Review 2011 May11 Instrument Lead: James McFadden Electrical: Ken Hatch, Rick Sterling, Dorothy.

Slides:



Advertisements
Similar presentations
The MAD chip: 4 channel preamplifier + discriminator.
Advertisements

555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
M. Steller Space Research Institute, Graz EDI Gun FM2 Performed Tests and Results 1IWF/ÖAW GRAZ.
1 Chapter 5 Sensors and Detectors A detector is typically the first stage of a communication system. Noise in this stage may have significant effects on.
Part A: Controlling Oscillation Frequency with Capacitors and Resistors Part B: Diodes and Light Experiment Timer.
Fiber-Optic Communications
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
1 Lab Equipment. 2 TopicSlides DC Power Supply3-4 Digital Multimeter5-8 Function Generator9-12 Scope – basic controls13-20 Scope – cursors21-24 Scope.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Astable multivibrators I
Introduction to Op Amps
EKT214 - ANALOG ELECTRONIC CIRCUIT II
© 2012 Pearson Education. Upper Saddle River, NJ, All rights reserved. Electronic Devices, 9th edition Thomas L. Floyd Electronic Devices Ninth.
TIMERS.
Slide # 1 Examples of pressure sensor packaging Temperature characteristics of a piezoresistive pressure sensor. Transfer function at three different temperatures.
1 MAVEN PFP SWIA Electrical Pre-CDR Peer Review MAVEN SWIA Electrical Pre-CDR Peer Review May 11, 2011 E. Taylor Space Science Laboratory University of.
EKT314/4 Electronic Instrumentation
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
LPW Preamp/Sensor Overview Greg Delory, LPW Co-I MAVEN PFP Pre-CDR Peer Review May 10, 2011.
MonsonPeer Review – 5 December 2014 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
ELECTRONIC INSTRUMENTATION & PLC DKT Signal Conditioning Circuits.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Suprathermal Tails in Solar Wind Oxygen and Iron Mark Popecki University of New Hampshire STEREO SWG 11/2007.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
Two-stage amplifier status test buffer – to be replaced with IRSX i signal recent / final (hopefully) design uses load resistor and voltage gain stage.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Improving Detection Efficiency of a Space-based Ion Mass Spectrum Analyzer Anne Lamontagne, University of New Hampshire; Mark Popecki, UNH; Lynn Kistler,
1 MAVEN PFP ICDR May 23-25, 2011 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Particles and Fields Science Critical Design Review May ,
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
Modern VLSI Design 3e: Chapter 3 Copyright  1998, 2002 Prentice Hall PTR Topics n Electrical properties of static combinational gates: –transfer characteristics;
TPC electronics Status, Plans, Needs Marcus Larwill April
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
15-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , SWIA (Solar Wind Ion Analyzer) J.S. Halekas.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
15-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, 2012 Section 15 STATIC James McFadden Mars Atmosphere and.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
By. Jadhav Avinash J Roll no - 2K13E11. Reference: Hewlett Packard Agilent Technology Wikipedia GwINSTEK.
PCAR Precision In Practice 1 Precision In Practice Achieving the best results with precision Digital Multimeter measurements Paul Roberts Fluke Precision.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
FUNCTION GENERATOR.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Subject Name: LINEAR INTEGRATED CIRCUITS Subject Code: 10EC46
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Electronic Devices Ninth Edition Floyd Chapter 17.
Calorimeter Mu2e Development electronics Front-end Review
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
SWIA Front End Peer Review
Cross-Calibration Meeting ESTEC, February 2006
BCTW calibration status and future
Image Stabilization System (ISS)
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
AMICSA, June 2018 Leuven, Belgium
Presentation transcript:

1 STATIC pre-CDR Peer Review, May STATIC pre-CDR Peer Review 2011 May11 Instrument Lead: James McFadden Electrical: Ken Hatch, Rick Sterling, Dorothy Gordon, Chris Tiu, Peter Berg, Selda Heavner Mechanical: Greg Dalton, Greg Johnson, Paul Turin Testing: Onno Kortmann, Mario Markwordt

2 STATIC pre-CDR Peer Review, May Overview IntroductionMcFadden Requirements Status at PDR Design Changes Front End ElectronicsHatch Digital ElectronicsSterling FPGAGordon Carbon FoilsKortmann Mechanical Design Dalton Schedule/Wrap UpMcFadden

3 STATIC pre-CDR Peer Review, May Summary of Science Requirements STATIC Science Objectives and Requirements Thermal Ionospheric Ions ( eV) - >1 eV due to RAM velocity (~4 km/s), peak flux at ~4-5 eV - densities of 10 5 /cm 3 require both attenuators - densities of /cm 3 require single attenuator - resolve 3D angle distribution requires ~10-20 deg sensor resolution - resolve parallel temperature down to ~0.1 eV requires ~1 eV Suprathermal Ion Tail – Conics (5-100 eV) - >5 eV ions with escape velocity - expected fluxes similar to Earth’s aurora - as RAM ions drop below ~10 2 /cm 3, switch off attenuators Pick-up Ions (100 – 20,000 eV) - tenuous flux may require long integrations - flux generally maximum perpendicular to solar wind V and B - optimal measurements may require rotation of APP - instrument should not saturate in magnetosheath

4 STATIC pre-CDR Peer Review, May STATIC Characteristics STATIC Geometric Factor –Nominal analyzer cm 2 -sr-eV/eV –With grid and TOF efficiencies : ~0.2 x = 3x10 -3 cm 2 -sr-eV/eV –With electrostatic attenuator only 3x10 -4 cm 2 -sr-eV/eV –With mechanical attenuator only 3x10 -5 cm 2 -sr-eV/eV –With both attenuators 3x10 -6 cm 2 -sr-eV/eV STATIC Dynamic Range –Energy flux range <10 4 to 10 8 eV/cm 2 -s-sr-eV (nominal-isotropic), –Energy flux extended to eV/cm 2 -s-sr-eV w/ attenuators, low energy beam –360 o x 90 o FOV less s/c blockage (<25%) –1 eV to 30 keV –1 amu to 70 amu STATIC Counting Rate and Background –Electronic dead time ~0.5 μs –Attenuators should be activated when rate exceeds 400 kHz –Coincidence rejection reduces background to negligible levels STATIC Resolution –Analyzer intrinsic energy resolution, dE/E~15% –Angle resolution 22.5 o x 6 o –Mass resolution m/dm>4 –Fastest time resolution is 4 seconds, some products averaged for 2 minutes

5 STATIC pre-CDR Peer Review, May STATIC Mounting on APP STATIC is mounted on the 2-axis APP boom to reduce s/c wake effects and to point the sensor FOV to include both the RAM direction (i) and nadir (roughly j).

6 STATIC pre-CDR Peer Review, May STATIC Block Diagram Starting from the top: 1) Ions are energy selected by the analyzer 2) Ions post accelerated by 15 kV 3) Ions penetrate Start foil producing e- 4) Start electrons accelerated and deflected to the MCP producing signal in Start anodes 5) Ions traverse 2 cm and penetrate Stop foils producing e- 6) Stop e-, accelerated by ~10 kV, penetrate thick foil (-4-5 kV), strike MCP producing signal in Stop anodes 7) Protons penetrating Stop foil are captured by thick foil before reflecting 8) Heavy ions may reflect before thick foil, due to energy losses in foils, but have high efficiency for foil e- production 9) Separate delay line anodes for Start and Stop signal allows both position and time coincidence for rejection of noise. 10) Digital interface board decodes and stores event before transfer to PFDPU 11) 4 sec cycle time 64E x 16 Deflections

7 STATIC pre-CDR Peer Review, May STATIC Design Features 1)Selectable noise threshold for setting valid events to be analyzed by TDC 2)Variation of event threshold can be used to measure MCP pulse height distribution and keep MCP voltage optimal 3)Large preamplifier dynamic range to accommodate variations in MCP PHDs 4)Large sweep HVPS dynamic range to accommodate thermal ionosphere and pickup ions – includes relay for in-flight measurement of Opamp offset drifts. 5)Noise rejection based on requiring TOF1=TOF2 and POS1 = POS2 6)Test pulser with variable gain and start-stop delay time. 7)Backup mode to retain mass discrimination should one preamp fail. 8)Two attenuators that provide 3 separate geometric factors allowing gradual changes in sensitivity with region. 9)Attenuators are controlled by PFDPU and will be actuated based on count rate with an algorithm that incorporates hysteresis. Mechanical attenuators will only cycle once per perigee pass. 10)TOF detection efficiency can be easily determined in-flight based on ratios for Starts/(Starts+Stops) and Stops/(Starts+Stops). 11)Absolute detection efficiency can be determined to better than 20% accuracy from simulation of analyzer, grid transmission estimates, and TOF efficiency. 12)In-flight cross calibrations can be made with SWEA, SWIA and LPW(fp) in the magnetosheath, and with LPW(current sweeps) and NGIMS near perigee. 13)Instrument health is monitored by the PFDPU. 14)6 levels of HV safing to prevent HV in inappropriate environments

8 STATIC pre-CDR Peer Review, May STATUS at PDR Subsystems with prototypes at PDR 1) TOF analyzer with carbon foils 2) Delay line Anode w/ MCP mounting 3) Preamplifier Board 4) Time-to-Digital Board (TDC) 5) High Voltage Connector 6) TOF HV supply (14kV) 7) Sweep/Deflector HV supply (+/-4 kV) 8) Digital Interface Board Subsystems without prototypes at PDR (standard designs) 1) Electrostatic analyzer with deflectors (spare ESA used for testing) 2) Aperture opening mechanism with mechanical attenuator 3) MCP HVPS and sensor LVPS 4) GSE interface (Stereo GSE used for testing) Primary concerns during EM development 1) Front end noise/jitter characterization (required fast scopes for sub-ns testing) 2) Reliable carbon foil mounting and verification (development of procedures) 3) Large dynamic range for sweep HV (low noise and offset drift testing) 4)Mechanical mechanism for aperture opening and for mechanical attenuator 5) Critical parts must pass stress/radiation testing

9 STATIC pre-CDR Peer Review, May Overview of EM Development Subsystem development since PDR 1) All prototype boards required new layouts (part changes or obsolete layout software) 2) EM Preamp-Anode testing showed larger dynamic range needed (2 preamp designs) 3) EM TDC testing shows some cross-talk jitter between start/stop (layout mods needed) 4) EM digital board modified for a FPGA daughter card and new test pulser (in Test) 5) EM Acc/MCP HVPS (-15, -14, -6, -5, -3.7kV) modified to use VMI parts (being loaded) 6) EM Sweep/Deflector HVPS (+/-4 kV) modified to reduce noise (in Test) 7) EM LVPS designed and built (waiting for EE to begin testing) 8) Carbon foil mounting and testing procedures developed (vibration and acoustic tests) 9) EM TOF analyzer fabricated (vibration and acoustic tests performed) 10) EM electrostatic analyzer design completed (in fabrication) 11) EM electronics box fabricated (board fit tests completed) 12) EM external harness design completed (parts in fab) 13) GSE testing of digital board in process (test scripts being developed) 14) Assembly procedures for TOF developed 14) Clean room built for sensor assembly 15) New Calibration Chamber in development (completion date July) Primary EM testing milestones over next few months 1) Life test for mechanical attenuator/opening mechanism 2) Vacuum test of EM Acc/MCP HVPS with VMI parts 3)System level test with all subsystems operating in vacuum 4)Interface test to PFDPU

10 STATIC pre-CDR Peer Review, May EM Anode Development Modifications from prototype layout to EM 1) Switched from pogo to Huber-Suhner MMBX and MMBC co-axial connectors 2) New layout in PADS

11 STATIC pre-CDR Peer Review, May EM Anode Tests Tests 1)Tested for relative signal degradation on Start and Stop transmission lines. 2)Tested for relative signal delay on the Start and Stop transmission lines. Stop showed longer delays due to combination of line length and anode vias. Total delay difference less than 2 ns 3)Anode test pulse inputs checked with Fast (sub-ns) test pulser. Modifications to EM during testing to increase input test charge pulse 1)Test input capacitors increased from 1 pF to 5 pF 2)Test input drain resistors increased from 200 Ω to 10kΩ Flight Anode modifications 1) Single via for each stop anode (current design slows signal down) 2) Make line traces on Start and Stop anodes identical in length 3) Remove the heat sink traces on the anode pads

12 STATIC pre-CDR Peer Review, May EM Preamp Development Modifications from prototype to EM to provide more dynamic range 1)New layout in PADS with Huber-Suhner MMBX connectors 2)1 st stage of 3 transistor preamp modified to be more linear 3) Two versions of preamp design being pursued for more dynamic range a) Version 1 is nearly identical to prototype (except for 1 st stage) ~25-30 dB range b) Version 2 has a modified stage 2-3 for more linear gain ~35-40 dB range

13 STATIC pre-CDR Peer Review, May Preamp Dynamic Range Larger preamp dynamic range needed to prevent saturation and timing degradation 1)Different ion species produce different pulse height distributions a) Protons typically produce a single electron from the carbon foils b) Oxygen or other higher mass ions can produce 2-6 foil electrons c) Therefore preamp dynamic range should allow factor of at least 4 in peaks in PHD 2)Preamp threshold should be at least a factor of 2 below proton peak PHD 3)Signal loss by delay lines introduces factor of 2 difference in gain into the preamp 4)Non-ideal MCP gain (due to non-optimal bias voltage and/or non-uniform gain with position) suggest at least another factor of 2 in dynamic range needed. Therefore, to maintain margin on TOF timing accuracy, we’d like to have a factor of >32 in preamp dynamic range (>30 dB) where signals are not saturated above the noise threshold. A minimum dynamic range would be ~20, and would introduce some timing errors for the largest signals. 0 1e7 4e7 Gain Pulse Height Dist. H+O+

14 STATIC pre-CDR Peer Review, May Preamp Dynamic Range Prototype preamp had inadequate dynamic range (~8) to maintain timing accuracy over the range of input pulse amplitudes. It also had an incorrect gain, and was non- linear at small signals due to minimal idle current. 1)Preamp-TDC noise threshold is ~30 mV (tests with digital board indicate ~15 mV) 2)Maximum preamp output pulse voltage w/o saturation is ~3 V Therefore a preamp linear dynamic range of ~100 is possible 3)To keep the preamp power low, the DC transistor CE current should be minimized. 4) However, event signal currents can be much larger than the DC current. 5) Since the transistor’s frequency dependent gain depends strongly on CE current, gain changes with input signal size will change the shape of the output pulse 7) CFD timing accuracy depends on maintaining constant shape for the preamp output A trade was needed between minimizing DC current (power) and preamp linearity Two preamp solutions are being evaluated. The first solution involves only changes to the first transistor stage – to make it more linear and shape the pulse. This provides a factor of ~20 in dynamic range. The second solution involves a more extensive preamp redesign and should provide an additional factor of 2 in dynamic range and less timing drift w/ amplitude.

15 STATIC pre-CDR Peer Review, May EM Preamp Test Data 1

16 STATIC pre-CDR Peer Review, May EM Preamp Test Data 1

17 STATIC pre-CDR Peer Review, May Changes to Preamp Change bias current in 1 st stage to higher value to improve linearity. Add input filter to obtain better input stage response. Improve dynamic range of output stage.

18 STATIC pre-CDR Peer Review, May Original preamp design Limited dynamic range Huge current swing in Q1

New Input Stage Design (for better linearity)

20 STATIC pre-CDR Peer Review, May Alternate preamp design Need temperature compensation, possibly series diodes for V_Tcomp (feeds all 4 stages) Input slowing network Wide dynamic range gain stage (for improved dynamic range)

21 STATIC pre-CDR Peer Review, May EM TDC Development TDC modifications from prototype to EM 1)New Layout in PADS 2)Inter-board coaxial connections with Huber-Suhner MMBX connectors 3)New 21 pin TDC to digital board connectors selected 4)Part changes to accommodate NASA specs.

22 STATIC pre-CDR Peer Review, May EM TDC-CFD Modified Schematic Testing uncovered …. 1)ADC inputs and reset lines floating when not hooked up to digital board 2)Timing comparator in unknown state when latched (made testing difficult) 3)Race condition was marginal for threshold enable of timing comparator latch 4)Start/Stop timing jitter (~1ns) when Stop signal was ~15-17 ns after Start. 5)Inconsistent TDC timing capacitor discharge circuit design Fixes 1)Pull down resistors will be added to flight TDC layout 2)Threshold voltage introduced into timing comparators to assure latched signal is low 3)Timing comparator’s 2 ns delay line chips replaced with 3 ns delay line chips 4)Will move threshold flip-flop closer to threshold comparator, add power line filtering, change the ground plane 5)Determined the proper discharge RC circuit for holding timing capacitor at ground. Other Testing 1)Linearity of TOF timing 2)Preamp-TDC timing drift with input signal amplitude (1-1.5 ns over dB) 3)Delay requirements between pulse and ADC latch as a function of TOF time.

23 STATIC pre-CDR Peer Review, May TIMED schematic

24 STATIC pre-CDR Peer Review, May TDC original design

25 STATIC pre-CDR Peer Review, May EM TDC Test Data 1

26 STATIC pre-CDR Peer Review, May EM TDC Test Data 15 ns delay

27 STATIC pre-CDR Peer Review, May EM TDC Test Data 17 ns delay

28 STATIC pre-CDR Peer Review, May EM TDC Test Data 18 ns delay

29 STATIC pre-CDR Peer Review, May EM TDC Test Data 20 ns delay

30 STATIC pre-CDR Peer Review, May EM TDC Test Data 40 ns delay

31 STATIC pre-CDR Peer Review, May Changes to TDC Board Add pull-ups and pull-downs for easier testing (Establishes high or low for open pin). Copy best reset circuit to all resets. (resets charge on integrating capacitors.) Change CFD delay chips to 3 ns to provide margin on race condition for threshold enable of timing comparator latch Make changes to ‘stop’ timing discriminators to isolate noise. Redo layout to isolate ground and power associated with stop discriminator.

Added resistors R636 through R644 (places board in known state when pin is disconnected)

33 STATIC pre-CDR Peer Review, May Use this circuit for all resets

34 STATIC pre-CDR Peer Review, May TIMED schematic U212 U203-2 U203-1 Replace 2 ns delay chips with 3 ns

35 STATIC pre-CDR Peer Review, May TDC EM Layout (U212 traces cross start section to get to U203)

36 STATIC pre-CDR Peer Review, May Added part Moved connection Changes to “stop” timing discriminato r 3 ns delay chips

37 STATIC pre-CDR Peer Review, May New Layout U203U212 (U203 and U212 are close)

38 STATIC pre-CDR Peer Review, May Isolated ground New Layout

39 STATIC pre-CDR Peer Review, May EM Digital Board Development Modifications from prototype to EM 1) Daughter Card Added for FPGA 2) A few part changes for reduced power consumption or part consistency. 3) Flight mating connectors: MDM21 mating to TDC, HDLP connectors for daughter card., Huber+Suhner test pulse connectors.

40 STATIC pre-CDR Peer Review, May EM Digital Board Tests Completed

41 STATIC pre-CDR Peer Review, May Static Digital Board Testing Anode/PreAmp-TDC-Digital--MISG GSEOS End to end testing on the bench.

42 STATIC pre-CDR Peer Review, May Test Setup End to End Testing with Controllable Test Pulses Pulses generated on command at FPGA in Digital Board Pulses can be controlled in frequency, amplitude and delay Pulses Sensed at Anode and results sent through entire chain

43 STATIC pre-CDR Peer Review, May Test Pulse Design Modifications Modified circuit design to minimize ringing, minimize over/undershoot, yet have fast (1 ns) fall time. Trimming resistors, added diode.

44 STATIC pre-CDR Peer Review, May Issue: Missing Signal Discovered missing signal. Pulse clearly seen at input to Digital Board and via on backside of FPGA. Not being received at FPGA. Jumpered to another pin to move forward. Will replace FPGA and retest. Flight boards use CCGA.

45 STATIC pre-CDR Peer Review, May Sample Test Data 1 Sample screen shot with counts which are checked against Test Pulse settings. Example: Start-Stop Time.

46 STATIC pre-CDR Peer Review, May Sample Test Data: Rates Display of pulse count rates. Easily compared with Test Pulse frequency.

47 STATIC pre-CDR Peer Review, May EM Digital Board Testing TBD EM Digital Board Tests To Be Done: * Voltage Margin Test. Vary voltages +/- 10% at ambient, hot (+65C) and cold (- 35C). * Parts Stress Analysis. Use GSFC spreadsheet/analysis to determine stress on each individual component in design.

48 STATIC pre-CDR Peer Review, May Clean Room for sensor assembly

49 STATIC pre-CDR Peer Review, May Sink for Carbon Foil Mounting

50 STATIC pre-CDR Peer Review, May New Cal Chamber being constructed

51 STATIC pre-CDR Peer Review, May Maintaining old Cal Chamber