Q11: Describe how the effects of power supply failures on integrated luminosity will be mitigated. TESLA Response : –Mainly consider two types of magnet.
Advertisements

Forced Outages in Genesys Examining the overall and individual outages for thermal generating resources.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC.
ATF2 Power Supply Availability Comparison February 5, ATF2 Power Supply Availability C0mparison Paul Bellomo and Briant lam.
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
1 Logistics Systems Engineering Availability NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Reliability Modeling of an ADS Accelerator SNS-ORNL/Myrrha Linac (MAX project) EuCARD 2, GENEVA (20-21 March 2014 ) CERN.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 Validation & Verification Chapter VALIDATION & VERIFICATION Very Difficult Very Important Conceptually distinct, but performed simultaneously.
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
GDE meeting September 29, Availability Task Force Progress Report Tom Himel for the Availability Task Force Putting the Linac in a single tunnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Thermal-aware Issues in Computers IMPACT Lab. Part A Overview of Thermal-related Technologies.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
Reliability and availability considerations for CLIC modulators Daniel Siemaszko OUTLINE : Give a specification on the availability of the powering.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Implementation Workgroup Meeting December 6, 2006 Attribution of Haze Workgroup’s Monitoring Metrics Document Status: 1)2018 Visibility Projections – Alternative.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Block Diagram e- source e- DR e- RTML e- ML e+ source e- BDS e+ BDS e+ ML e+ RTML e+ DR Factor availability of single-tunnel housing out of overall availability.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 9 1.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
PAC Meeting, December 12, Prebys 1 The Problem.
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
LC availability Simulation done for the LC comparison task force Tom Himel SLAC.
Availability studies for SB2009 Focus: relative availability performance of proposed single tunnel schemes (with respect to RDR) – Klystron Cluster – Distributed.
AS Webex meeting – January 27, 2010
2016 Maintenance Innovation Challenge
Engineering in High Availability
Oct 22 Group Leaders Planning meeting
MPE-PE Section Meeting
Availability Task Force Progress Report
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Availsim runs and questions
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
Operations Department
Availability and Reliability Issues for the XFEL Tom Himel SLAC/DESY
Thoughts on Energy Reach
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Linac LLP Outline LINAC Long Lead Procurements
Operation of Target Safety System (TSS)
Presentation transcript:

John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2

Subgroup #2 (Marc Ross, Ewan Paterson, John Carwardine) Identify the drivers which dominate overall availability of each model (KCS, DRFS, RDR) Consider practical (what) and strategic approaches (who and how) on realizing the needed availability Examine different operations / maintenance models Develop a set of studies to be done using Availsim Ultimately, answer the question: “What does it take in order for the two linac configurations to be credible from an Availability stand-point?”

First things first... Set up two Availsim models –Two linac models – one for each HLRF configuration –Everything else should be identical in both models –Single tunnel is defined for both SB2009 options Direct comparisons of 1 vs 2 tunnels are not needed For each HLRF configuration, we need –Parts models for RF building block [do we have them?] –Estimates of repair times –Estimates of mean time between failures...

Initially focus on three topic areas (1) (2) (3)

Downtime analysis Analyze downtime events by Area System and Technical System Are there dominant effects from...? –End effects from repairs, eg tunnel access times, time to recover luminosity –Repair times for particular components –Numbers of failures of particular components Will provide valuable guidance for future simulations

De-emphasize ‘Engineering QA’ issues To assess viability, we want to assess the technology drivers to availability Some components might be considered as ‘QA drivers’ to availability. These should be de-emphasized in the model What’s on that list...?

Consider three categories of equipment... ‘Standard’ components –Vacuum pumps, flow switches, circuit breakers,... –COTS parts Technical systems with large operating base –Magnets, power supplies, controls,... –Good statistics for reliability estimates Technical systems with little / no operating base –Newly developed parts, challenging specs –Insufficient data for estimating MTBF

‘Best available’ MTBF data.... Availsim is using MTBF numbers largely based on SLC operating experience Better reliability has been achieved at other labs on some of the relevant subsystems –Take the best numbers we can find, update Availsim –Who can get that information? It is in our best interest to use the most optimistic numbers that we can defend!

APS Reliability Summary for FY08

Reasonable MTBFs for unproven technologies? Difficult! Could be extrapolated based on failures over a number of test hours...but only to a limited extent –Eg 10,000hrs without a failure might be enough to claim an MTBF of 30,000+hrs (but not 300,000hrs) Can be estimated using data from similar equipment Calculate using one of several methods (maybe) Use Availsim to help assess what’s needed How is the HLRF Group addressing this issue?

Preemptive maintenance Applies to: hoses, cables, capacitors, mechanical pumps, circuit breakers, cooling fans, etc, etc The clock is effectively reset on the expected time to failure. Also applies to fixing systemic problems based on prior failures PM for all units may take one shutdown or many shutdowns In Availsim, this will be modeled by assigning long MTBFs

Maintenance models Basic parameters –Operate nine months per year (integrated luminosity) –Three months for shutdowns, maintenance, accelerator studies,... –RDR assumed one 3-month shutdown per year Impact of allowing opportunistic maintenance...? How to apportion the 3 months of ‘downtime’

Wrap-up (to do list) Set up and run Availsim models for the two SB2009 configurations Analyze downtime data to understand relative contributions from end-effects, repair times,... Collect ‘best available’ reliability data from other labs and incorporate into Availsim Set up Availsim to allow study of different operations / maintenance models Generate a studies list!