© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
T ransmission I mprovement For the Red River Valley & West Central Minnesota.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
North Mankato Load Serving study Xcel Energy Great River Energy.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Midwest Energy, Inc. Transmission Planning and Expansion
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
GDS Associates, Inc. ERCOT Reliability Operations Subcommittee June 10, 2010 Tex-La Electric Cooperative of Texas Load Forecast Methodologies.
Temperature-Sensitive Loads and Class Cost Allocation Presentation to Utah Cost-of-Service Working Group Kevin Higgins, Energy Strategies July 13, 2005.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Charles Hosken, General Manager Imperial Irrigation District
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
Rocky Mountain Power Load Growth and Network Planning April 27, 2007 Mark Adams.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Rocky Mountain Power Five Year Study Kick Off Meeting.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
Overview of Southern Company Transmission
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
AESO Update to PCC March, AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Jeff Billo Manager, Transmission Planning
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
2 KITTYHAWK TRANSMISSION & SUBSTATION PROJECT Collin County, Texas Brazos Electric Power Cooperative Inc. & CoServ Electric Sponsored Project.
JEA’s Initiatives and Capital Improvements Program
2016 RTP Update November, 2016 RPG Meeting.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
35kV Assessment SWEDE 2007 May 10, 2007.
Counties of Utah Washington County.
I-5 Corridor Reinforcement Project
Attachment-K Q3 Public Meeting Coos Bay Area Transmission Planning Study Kickoff Area Planner: Adam Lint Presented by Larry Frick September 13, 2018 Choose.
NERC LTRA Workshop August 16, 2007
TxMAG presentation
Idaho Power Transmission System
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Acadiana Load Pocket Project
Montpelier & Powder River 5-year Studies
Crescent City Study Kickoff
Presentation transcript:

© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday

© 2000 PACIFICORP | PAGE 2 PacifiCorp: –Parowan –Cedar City –Springdale –Twin Cities –Ivins Municipalities/REA: –St. George –Hurricane –Santa Clara –Dixie/Escalante REA SOUTHWEST UTAH STUDY Nathan Wilson/Talmage Daley

© 2000 PACIFICORP | PAGE 3 Southwest Utah Study –Covers ~ 1,800 square miles of area in Iron and Washington Counties. –There are 6 transmission subs in the area – Parowan Valley, Three Peaks, West Cedar, Red Butte, Middleton and St. George. –Several power entities within study area. –There are 44 substations, 4 being transmission customer substations. –Transmission voltages studied include 69 kV and 138 kV.

© 2000 PACIFICORP | PAGE 4 Load Growth –Base System Loads  Summer 2013: 564 MW  Winter : 371 MW –Growth  Summer: 2.7%  Winter: 2.7% –Projected System Loads  Summer 2017: 620 MW  Winter : 411 MW

© 2000 PACIFICORP | PAGE 5 System Improvements –Hurricane West Substation to accommodate new points of delivery. –Designed for future expansion to 345 kV.

© 2000 PACIFICORP | PAGE 6 –Apple Valley kV Substation 2015 –Required by agreement with Hurricane City. –69 kV source from Middleton via Windy Ridge Substation. –Serves existing 34.5 kV load in Apple Valley. –Total Estimated cost: $4,000,000 System Improvements

© 2000 PACIFICORP | PAGE 7 –Coleman Substation Reliability –Circuit breakers on both sources serving 138 kV bus. –Cuts exposure in the Cedar City area by two-thirds. Transmission Reliability Improvements

© 2000 PACIFICORP | PAGE 8 Construction Schedule Summary