Lavs Issues Lav 12. Tube 26-28. Planning future activities. Conclusions.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Compressor status AWAKE Technical Board meeting 19 May 2015.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Start Counter Construction Update Eric Pooser 08/21/2014.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Compressor status AWAKE Technical Board meeting 19 August 2015.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
First Wall Panel - Overview
DT-LHCb coordination meeting 18 April 2016
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Plans for the construction of the new membrane cryostat in bldg 182
BSS Prep work at CERN and Acceptance of Parts
Ongoing and to do work M.Lenti.
Transfer lines status 10/11/2016 O.Crespo-Lopez.
Far Detector Activities Late 2017 – Early 2018
Preparations for test of
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
LARP Phase II Secondary Collimator RC-0 and RC-1
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Lavs Issues Lav 12. Tube Planning future activities. Conclusions.

Lav 12. Details drawings are ready. Panel light tight has been defined (inner radius 280mm material aluminum 0.4mm). Orders for top part and lower carriage has been placed and the company received both of them. Next step is to interact with production company to finalized drawings for construction. The delivery time is two month after the approval of final drawing for construction. The company is preparing a detail fabrication steps planning.

DETAIL FROM G.DRAWING: - LAV 12 SCHEME Survey holes Verification of the access to the survey holes to be able adjusting the Lav 12 During an external survey we can traslate it outside.

Panel light tight Aluminum 0.4mm Inner Cylinder radius 280mm Aluminum sheet panels

LAV 12 GENERAL DRAWING WITH MAIN REFERENCES EDMS: v.1 Survey holes R=3200

Details drawings of Lav 12

Tube status A final versing of drawings has been made and approved. We verify fabrication drawings and final dimensions and tolerances. Final drawing has been summited to FERDI and Olivier for further comments. The deliver schedule has been update. The deliver of tube at CERN is envisaged in the end of April 2014 ( 22/04/2014). A late of delivered of the special stainless steel AISI 304LN has caused a week of delay in the pervious schedule. All material for construction now it is at the company and reparation is taking place for welding.

Tube 26 drawing

Tube 28 drawing

Planning of future activities Mounting and test the Lav 12 structures at the company to verifying the mechanic. The transportation of LAV 12 implies a new insulation case and a new isolation system. Tooling for mounting and handling LAV 12 Mechanic and crystal must be designed and made. Verification of construction of Tube 26 and 28 and tests. Installation of the tube 26 and 28 and the rest of LAVs in the experimental area.

Conclusions We can consider to receive the lav 12 in Frascati at the end of April 2014 and transport it at CERN during the summer time. Integration and organization of the transportation of LAV12 can take place in the following three months. The Tube can be delivered at CERN end of April. After the end of March we can installed the rest of LAVS.