OPF FOCUS GROUP The Provision of Co-location Facilities and Process Greg Mook 1 September 1999 OPF Co-location Focus Group.

Slides:



Advertisements
Similar presentations
Experimental Internet Resource Allocations Philip Smith, Geoff Huston September 2002.
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Team 1: Aaron, Austin, Dan, Don, Glenn, Mike, Patrick.
Slide 1 Access to Bandwidth: Proposals for Action Ilsa Godlovitch Regulatory Policy Directorate
CP Networking1 WAN and Internet Access. CP Networking2 Introduction What is Wide Area Networking? What is Wide Area Networking? How Internet.
Fred Howett - Nortel Networks OFTEL INTERNET FORUM - 1st Sept Progress in NICC xDSL Task Group Fred Howett - Nortel Networks.
Scottish Transport Appraisal Guidance - STAG Hugh Gillies Transport Scotland.
Cross-Border Infrastructure: A Toolkit Competition Basics Session on Regulation & Accountability Max Bradford Castalia The views expressed here are those.
Towards Regional Independent Operators – a main driver for successful market integration.
Inter-Operator TMN & OSS Workshop Prague, March Technical Development and Support for European ATM Service Introduction John Boyles, PL.
1 Access Network Services for Service ProvidersP1042 EURESCOM P1042 Access Network Services for Service Providers A brief overview of the results.
TIPHON IP Telephony Implementation Association TIPIA Overview Ayse Dilber, Michael Blaschitz TIPIA Vice-Chair, TIPIA Chair
NICC Review ~ 2003 Bill Hawkins NICC Operational Plan Continued “austerity” regime, focus on –Commercial imperatives –Regulatory critical issues.
ETSI Home Networking activities Rainer Münch ETSI TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-GTSC6-20r1 FOR:Presentation SOURCE:Rainer Münch,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Regulation of Quality of Service IADS The Gambia - March, 2014 Gita Sorensen.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Health Insurance Portability and Accountability Act of 1996 (HIPAA) Proposed Rule: Security and Electronic Signature Standards.
1 ND Topical Call Series: NDTAC Resources to Meet Technical Assistance Needs (Call 3) 22 September 2015 – Katie Deal.
Property of TERA Consultants CONSULTANTS T E R A IDATE– Workshop Lessons from Tunis (22 November 2005) TERA Consultants 32 rue des Jeûneurs PARIS.
Technical Policy and Standards Andy Gorton – Senior Architect: Institutional Networks.
Strategic Alliances How to Structure, Negotiate, and Implement Successful Alliances February 11, 2003 Debra J. Dorfman Copyright © 2003 by Hale and Dorr.
Therese E. Ritter, MCT New Horizons Computer Learning Centers— Great Lakes A Look at Conflict and Consensus in Decision Making.
Implementing Oftel’s Broadband Strategy John Russell 12 July 2002.
Local Loop Unbundling PRESENTATION TO THE PORTFOLIO COMMITTEE 6 th JUNE 2007.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
Rules for NGN? ITU March 2006 Challenges of NGN regulation for developing countries: a perspective from South Africa Alison Gillwald LINK Centre Graduate.
1 1Page Interconnection and Facilities Leasing Discussion 1. Introduction and Objectives 2. Chapter 10 Market Review Process - Overview 3. Relevant markets,
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
G063 – Change Management. Learning Objective: By the end of this topic you should be able to: discuss change management discuss the factors which must.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Slide 1 Access to Bandwidth The Way Forward Peter Walker Director, Technology OFTEL
Article 28(2) USD Introduction. The Problem Fraud and Misuse scale Evolving risks Impact on end users –Direct financial impact –Direct inconvenience Indirect.
MSIL TECHNICAL CONSULTATION 28 February 2006 Steve Wright The information in this presentation relates to plans currently under development and subject.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
SAFE Association UNIQUELY FOCUSED IN A CRITICAL DISCIPLINE ORIGINALLY FOUNDED IN 1956 AS SPACE AND FLIGHT EQUIPMENT ASSOCIATION, SAFE ASSOCIATION IS AN.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Telecom Unclassified Fault Prioritisation Telecom, Auckland 30 th October 2007 Telecom Wholesale Industry Consultation Seminar.
PHYSICAL COLLOCATION APPLICATION DATE SENT / / VERSION_________________________________ I CUSTOMER INFORMATION Issue 1: 7/22/96 1.Company Name Street City/Town/State/Zip.
March, 2004 Into the LAN: An Integrated LAN/WAN End User Study © 2004 Frost & Sullivan. All rights reserved. This document contains highly confidential.
Omniran CF00 1 Key Concepts of Association and Disassociation Date: Authors: NameAffiliationPhone Max RiegelNokia
UNIQUELY FOCUSED IN A CRITICAL DISCIPLINE
First Nation Waste Management Initiative
Local Multipoint Distribution Service ?
NATIONAL DOSE REGISTER Steering Committee Meeting 28 August 2015
PHYSICAL COLLOCATION APPLICATION
Sub-Loop Extension Service (SLES)
INTERCONNECTION GUIDELINES
Direct Attached Storage and Introduction to SCSI
GEOSS Data Sharing Principles
Transmission Planning Code
ATIS Cybersecurity DOCUMENT #: GSC13-GTSC6-12 FOR: Presentation
Effective Control of the Landing Obligation
Direct Attached Storage and Introduction to SCSI
IPv4 Allocation Implications
Design Unit 26 Design a small or home office network
Informal document GRE-79-04
July 2000 doc.: IEEE /192 July 2000 One Global Standard for Wireless LANs? ETSI/IEEE/MMAC Convergence July 2000 Lucent Technologies Harold.
Department of Correctional Services
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Major PAR form questions
ICAO ACP Working Group M Iridium Sub Group Overview
Informal document GRE-79-xx
Presentation transcript:

OPF FOCUS GROUP The Provision of Co-location Facilities and Process Greg Mook 1 September 1999 OPF Co-location Focus Group

ACCESS TO BANDWITH Option 4 - BT managed ADSL implementation underway acceptable to BT Option 2 - unbundled local loops July 2001? Not acceptable to BT OPF Co-location Focus Group

OPF CO-LOCATION FOCUS GROUP First Meeting 10 September at MCI WorldCom will set Terms of Reference will focus on implementation and operational process Technical issues addressed by DSL Task Group OPF Co-location Focus Group

OPF CO-LOCATION FOCUS GROUP Focus Group will not negotiate terms and conditions not decide if co-location should be implemented Compare to Number Portability introduction OFTEL/MMC ruling on cost allocation Industry sorted out implementation process OPF Co-location Focus Group

Information Exchange Provisioning Time Reservation Re-location Separation Standards Space Usage Operational Guidance Forecasting SLAs Access and Refusal Separation Standards Study and Prep Work Requirements on Access Seeker Liability Confidentiality Security Arbitration Modification / Termination IMPLEMENTATION AND OPERATIONAL PROCESSES WILL INCLUDE: OPF Co-location Focus Group

Dealing with Capacity Issues Cabinets / Interface Environment Power Cabling Equipment Installation Maintenance Delineation of Responsibilities Ordering Process QoS Requirement on Equipment Maintenance Fault Clearing Access Conditions Network Termination Point IMPLEMENTATION AND OPERATIONAL PROCESSES WILL INCLUDE: OPF Co-location Focus Group

There is a potential for tension with this parallel approach: eg: History suggests a player’s preferred implementation is correlated strongly to the cost allocation rules BT will participate in a “theoretical” mode I anticipate that some issues will require regulatory “suasion” or “encouragement” OPF Co-location Focus Group

CONTACT DETAILS GREG MOOK MCI WORLDCOM OPF Co-location Focus Group