25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX8-2.003 & SX8-2.004 connectorize cooling cables alignment procedure.

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
7 September 2006VELOEddy Jans 0 VELO-installation September 7, 2006 installation of exit window + part I of the beam pipe logging of vacuum data what’s.
14 February 2008VELO NikhefEddy Jans 0 Cooling and warm-up of the VELO under neon atmosphere conditions results (Jan 28  30) implications.
Walls crates cables gas chambers electronics CERN adb.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
ECS workshop, CERN, may ‘00M. Ferro-Luzzi LHCb Vertex Detector System Reminder of current VELO design Controls: Motion mechanics Vacuum system Cooling.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
Dec
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules installation.
DCal-ALICE integration and installation plan and status A. Tauro.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
VELO Replacement Girish Patel University of Liverpool.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
BM&N STS ladders assembly in VLHEP
HMS Status Steven Lassiter Jan 20, 2017.
DT-LHCb coordination meeting 18 April 2016
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
ELENA installation and commissioning status
VELO-installation meeting CERN, January 17, 2006
Introduction Status before the 2009 run Results from the 2009 run
Gas System Commissioning
LHC Experimental Vacuum Systems Status October ‘07
LumiCal mechanical design, integration with LDC and laser alignment
LHCb & EYETS
Initial BIS installation
LHCb comprehensive review, Paula Collins
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Cryomodule Assembly Plan
Polarized 3He target installation
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure motion test bake out procedure turn over project  P-project VELO vacuum commissioning LHCb installation planning summary + timelines

25 January 2007VELO sub-projectsEddy Jans 1 clean up SX &4 Spaces and are future storage, repair and working places for the whole VELO + PU communities. With other people and parts/equipment approaching soon, our stuff needs to be reorganized/cleaned up. Estimated time: 0.5 manweek.

25 January 2007VELO sub-projectsEddy Jans 2 22 Jan  16 Feb: - pull long-distance (RB84  D3) analog cables by INEO - “simultaneously” connectorize D3-side 19 Feb  23 Feb: - pull control cables (RB84  balcony) 26 Feb  2 Mar: - pull HV cables (RB84  D3) Cabling Cooling cables still need to be connectorized at both ends, i.e. RB84 and C3. Estimated time: 2*1 manweek.

25 January 2007VELO sub-projectsEddy Jans 3 Alignment Centre Frame Fiducial Marks Alignment procedure uses 5 fiducial points on each side of center frame. However, these are soon not visible anymore due to the repeater crates, mounted on the detector hood.

25 January 2007VELO sub-projectsEddy Jans 4 Solution: Install new alignment points above and below the existing ones. Watch out that the analog cable supporting frame is not in the way also. Estimated time: design: 1.5 mw construction: 1.5 mw implementation: 2*0.5 mw

25 January 2007VELO sub-projectsEddy Jans 5 Motion Increasing expertise with the system has revealed the necessity to take a few additional safety measures. Partly to be implemented in the PLC, partly in the PVSS application. moving both XL and XR in the same direction from a position in which XL=-XR, needs special precautions. implement the possibility to stop the stepper motor when really necessary (moving wrong way based on pot. meters, one side not moving at all, etc.) Estimated time: thinking: 2 mw implementation: 2 mw testing: 2*1 mw

25 January 2007VELO sub-projectsEddy Jans 6 Test bake-out procedure Bake-out procedure of rf-boxes has to be commissioned: regulation of lamps, temperature interlock, etc. Estimated time: preparation: 1 mw implementation: 2*1 mw

25 January 2007VELO sub-projectsEddy Jans 7 Turn over project Rotation of the detector half is a delicate, not yet well-established activity. Likely solution: Use 2 small cranes. Either powered by hand or electricity. Estimated time: preparation: 0.5 mw production of test tool: 0.5 mw ? testing: 2*0.2 mw

25 January 2007VELO sub-projectsEddy Jans 8  P project  x [mm]  p [mbar] (elastic) deflection:  mbar  mbar

25 January 2007VELO sub-projectsEddy Jans 9 evacuation  p=p beam -p det [mbar] foil hits sensors side

25 January 2007VELO sub-projectsEddy Jans 10 venting  p=p beam -p det [mbar] foil hits sensors side

25 January 2007VELO sub-projectsEddy Jans 11 Possible remedy: change  p- range and/or central  p- value. Estimated time: preparation: 2*1 mw testing: 2*0.5 mw

25 January 2007VELO sub-projectsEddy Jans 12 VELO vacuum commissioning Unacceptable leak rate (10 -5 mbar.l/s) of rf-boxes necessitates additional tests + attempts to (temporary) fix the problem. Present plan with VELO + part I of the beam pipe: evacuate bake 160 o C vent ?? evacuate ?? determine leak rate vent seal “holes” with Varnish evacuate determine leak rate Estimated time of NIKHEF-involvement: 2*2 mw

25 January 2007VELO sub-projectsEddy Jans 13 LHCb installation schedule Coming months lots of activities from RICH1, TT, VELO (HV, LV, ECS, etc.) in the vicinity of the VELO. Need for coordination, flexibility and mutual cooperation. Jan 22  Mar 2: Cabling (analog + control) around the VELO. March + April: installation LV-distribution boxes, HV-patch panels April 5: Start bake out + commissioning of the complete LHCb beam pipe.

25 January 2007VELO sub-projectsEddy Jans 14 Summary what wheretime [mw] start at the latest on ready before who 2.003&4cleanupIP80.51 Mar15 MarFM/MD/MK cooling cablesconnectorizeIP82*115 Mar1 AprJS+?? alignmentdesignNL1.51 Feb15 FebJvdB+FM productionNL1.520 Feb5 MarVU alignIP82*0.515 Mar23 MarJvdB+FM motiondesignNL215 Apr1 MayPdG+MvB codingNL215 May1 JunePdG+MvB testingIP82*115 Jun1 JulyPdG+MvB bake outdesignNL115 Feb1 MarPdG+MvB testingIP82*11 Mar10 MarPdG+?? turn overprepNL0.515 Feb1 MarMK/MD prod. of test toolNL0.51 Mar15 MarNIKHEF/CERN? testing??2*0.215 Mar1 AprMK+MD+RD pp prepNL2*120 Feb15 MarMD+LJ testingIP82*0.515 Mar1 AprMD+LJ vacuum comm.leak rate++IP82*210 Mar1 AprilLJ/MD/BM/FM