Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
Environmental Drilling By: Josh Humphreys October 8,2006.
Agricultural Mechanic and Technology Cluster
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Waste Pipe from Bath The waste pipe from the bath should be a minimum of 40mm in diameter, it can be 50mm in diameter if there is a longer run of pipe.
HVACR316 - Piping Piping and Fitting.
Unit Eight Check Valves, Cylinders, and Motors
CONSTRUCTION OF SOIL NAILING WALLS
TUBING AND PIPING.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
GROUNDWATER CONTROL.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Condensation Piping and Installation Drain Pans
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Hybrid Pile n Definition –A pile installed by combining driven and auger/drilled techniques. n Why use a ‘Hybrid’? –by incorporating a ‘driven element’,
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Foundation Engineering CE 483
TRENCHLESS TECHNOLOGY
1 Chemical Rod Features of Chemical Rod Provides Low Impedance Earth Ideal for installations with limited space Product description LYTECH’s Chemical Rod.
Well Design PE 413.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Slop Stabilization Pertemuan
Department of Civil Engineering,
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
Gandhinagar Institute of Technology
Cutting and Swaging Tubing
HVAC523 Piping and Fittings.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Setting up correctly Different types and their use
Drilling machine. Introduction Drilling is a metal cutting process carried out by a rotating cutting tool to make circular holes in solid materials. Tool.
COFFERDAMS.
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
SpeedROC D30 Miguel Pereira, Product Manager
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Benchwork IV –Hand Taps and Hand Reamers
THE SCIENCE OF SOLVENT WELDING
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
CH 6.6 Air Powered Tools.
STRAIGHT FORWARD DRILLING
Drilling Rig Accessoires and Tools
CALL/WHATSAPP
Chapter 23 Machining Processes: Turning and Hole Making
Horizontal Installation Overview
”Electrochemical protection of metals”
Welcome! Drafting 2323: Pipe Drafting
Govt. Polytechnic,Manesar
Drill cuts used in underground mines
Modern Automotive Technology PowerPoint for by Russell Krick
Operations and Maintenance
Bunker Wall Design Wall ESS
Large Air Systems – Sales Training
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 2 Development of new Down The Hole (DTH) techniques, especially the introduction of new air control bits, is making DTH drilling safer and more environmentally friendly than ever before. Using DTH in urban areas and in sensitive ground is now possible; plus, there is no danger of overdrilling or air escaping, which could otherwise cause settlements to existing structures. Down-the-Hole (DTH) Drilling Update in the Construction Industry + PPV FINLAND OVERVIEW

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 3 Improved drilling tools, along with the increasing utilization of DTH in construction markets, have resulted in the innovation of using special connection elements and oversized drill bits to construct interlocked pipe walls. As with DTH, you can also drill them through the hardest boulders and right into bedrock! New DTH tools bring the U.S. an economical and reliable solution that suits all ground conditions. + PPV FINLAND New Business Opportunity with O-Pile: DTH OVERVIEW

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 4 Interlocked O-Pile walls consist of spirally or longitudially welded steel pipe piles and their welded interlocking connector elements. + PPV FINLAND OVERVIEW O-Pile Wall Connector Elements

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 5 Interlocking elements consist of male and female elements where an oversized ring bit reams the space wide enough for male element to follow. The female element that reaches further out than the area cut by ring bits is always either in pre-drilled material or in a cavity created by a previously drilled ring bit. + PPV FINLAND OVERVIEW O-Pile Wall Connector Elements

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 6 + PPV FINLAND OVERVIEW Interlocked O-Pile Wall Components o WOM/WOF-S connection profiles. They are sturdy, hold their direction, and do not open; but they do allow for installation angles. The rails need to be welded, 2 seams per rail. This should be done on site rather than in the factory, as they should be longitudially straight. o Ring bit OD should be casing OD + 56 mm, while the advance of the wall line is around casing OD + 60 mm. o The advance is more than the ring bit OD, since the ring bit must not drill against the rail under any circumstances. Wall advancement / pile

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 7 Interlocked casings can be drilled in any ground conditions with the use of Down the Hole hammer and overburden drilling systems with extra large ring bits. Casings can be drilled through boulder clusters and into the bedrock; drilling depths can vary. + PPV FINLAND OVERVIEW O-Pile Wall Installation by DTH

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 8 With interlocked casings, we can make walls to be used as: o Dock construction and quay walls o Flood control and support walls o Vertically sealed enclosure walls o Pollution or water controll walls o Site excavations o Etc. O-Pile walls can bring considerable savings in construction time, with the added possibility of completely eliminating the need for temporary retaining walls. + PPV FINLAND OVERVIEW O-Pile Wall Application Ideas Illustrations ©Ruukki Oyj)

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 9 Interlocked pipe pile wall techniques, together with horizontal drilling, open new possibilities for horizontal O-Pile wall structures. All urban areas have requirements to build under existing street structures such as transport tunnels, pedestrian underpasses, etc. Interlocked O-Pile walls offer a new, economical way to build under streets without cutting off vital traffic. O-Pile Wall Application Examples + PPV FINLAND OVERVIEW

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 10 The drill bits, designed for interlocked pipe pile walls, feature an oversized ring bit; but they also include notable differences compared to normal casing advancement tools. Most important is the air flow balance between the flush face and the direct flow back to the casing. Much of the air needs to be directed straight into the casing to ensure that the air does not escape through the large cavity around the previously drilled casing and, thus, prevent cuttings from blocking the casing and then getting the hammer stuck inside while trying to rotate the casing with drill rods. O-Pile Wall Drilling Tools + PPV FINLAND OVERVIEW 18 mm back flush holes

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 11 In cases where the O-pile wall application is based on drilling the casings into bedrock, please note the following: The rock socket depth should be 3 times the diameter of the casing because of possible rock inclination. Installation of O-Pile Walls with DTH Casings in Bedrock + PPV FINLAND INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 12 The new casing is drilled/interlocked into the previous casing. The ring bit will pass the previously drilled casing, pulling the female element into locking position, yet passing the previously drilled element without touching it. Drilling can continue deeper than what the previous casing was drilled into. Please also note that even though the ring bit can pass the previously drilled ring bit, it cannot be drilled past the previously drilled casing’s ring bit! Installation of O-Pile Walls with DTH Casing + PPV FINLAND INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 13 Almost all pipe pile walls done with wing bits have had many connector element breakages and other failures. This is due to the wing bit’s tendency to deviate from hard layers and boulders and the casing’s natural turning to the right, especially if the casing is poorly flushed and full of soil, which turns the casing right and down, under the drill rig. Installation of O-Pile Walls with DTH Wing Bit Warning + PPV FINLAND INSTALLATION Wing bit systems have had problems

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 14 Sometimes installation requires grouting of the rock socket and/or the possible void around the casing. Whatever is the requirement, the easiest way to get the grout in place is to use double packers and one-way valves. Installation of O-Pile Walls with DTH Grouting + PPV FINLAND INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 15 Interlocked pipe pile walls can be sealed against water leakage up to a 5 bar pressure difference, which means 50 meters in wall depth! Wadit ® sealant is applied hot to the female connector rail. + PPV FINLAND Installation of O-Pile Walls with DTH Sealing INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 16 Best case scenario: The most feasible and economic solution is for all casings to be drilled single pass, given that welding time is not productive. However, if welding does need to be done (and is allowed at the site), then casings can be extended by welding. + PPV FINLAND Installation of O-Pile Walls with DTH Casing Joints INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 17 Any DTH rig will work with the addition of this tool -- a casing-holding device to prevent casing rotation movement, which thus keeps the wall in the desired direction and setting. + PPV FINLAND Installation of O-Pile Walls with DTH Drill Rig INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 18 While vertical walls are assembled with standard DTH piling rigs, horizontal applications require special HZ rigs that can handle long element lengths as the space allows. + PPV FINLAND Installation of O-Pile Walls with DTH Horizontal Drilling INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved PPV FINLAND Installation of O-Pile Walls with DTH Horizontal Drilling Example INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 20 Lines, corners and curves need to be designed before the welding of the rails. Rails will allow some 10° corrections but no more, and the method should be decided before construction. + PPV FINLAND Installation of O-Pile Walls with DTH Work Order INSTALLATION

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved. 21 Casing size requirements vary according to the load requirements. Applications typically vary from 168 mm to 1016 mm casings, while the lowest total material costs are in between 406 and 610 mm. Small sizes, from 168 mm to 273, can be drilled with a water hammer, too, utilizing outside flushing bits that minimize water requirement. + PPV FINLAND O-Pile Wall Cost Vs. Casing Diamter COST

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved PPV FINLAND O-Pile Wall Site Photos REAL-WORLD APPLICATION EXAMPLES

O-Pile.com | ©2014PilePro Group, Inc. All Rights Reserved PPV FINLAND Working for the Future of Down-the-Hole Drilling |