PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

Peter Chung (ID: pwc140030) Class: EMS in Software Engineering Course: Advanced Requirements Engineering (CS/SE 6361), Fall 2014.
3 Way Market Split in IEX for delivery dated 2 nd July’14 Average Price (Rs/kWh) : S1  6.85 S2  6.87 Rest of India  2.85 UMCP  3.89 Source: IEX.
CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
GENERATOR PROTECTION.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Presented by: Hao Liang
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
Operational Experience of system Protection Scheme of Talcher – Kolar HVDC Link.
HVDC Challenges in Grid Operation
1 Local Area Planning Update to TRANSAC – September 18, 2014.
(Associate Professor)
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Alok Roy. UHV/EHV Level HV/MV Level LV Level The Concept of a power grid.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Wide area SPS for Integrating SR with national grid Approach Document prepared by.
W E L C O M E Power Grid Corporation of India Limited.
SUMMARY Introduction System Protection Philosophy
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Transmission Integration of Nuclear 1 Bantamsklip Site November 2009.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
Tariff in Incentive is calculated as per CERC order Methodology All elements are grouped into following catagories 1.AC Transmission lines =
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Southern Regional Power Committee Central Electricity Authority.
BANGALORE TRANSMISSION PLANNING
HVDC Transmission.
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
September 18, 2007 Regional Disturbance
REGIONAL GRIDS IN INDIA – QUICK FACTS
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
MODELING DG IN BASE CASES
MODELING DG IN BASE CASES
Baltic synchronization plan
Planning Meeting November 4, 2010 Marv Landauer.
Presentation transcript:

PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION

GLIMPSES OF GENERATION AT TALCHER STPP

PRESENT SCENARIO GRID CAPACITY GRID CAPACITY ER GRID :10000 MW ER GRID :10000 MW WR GRID :30000 MW WR GRID :30000 MW SR GRID :23000 MW SR GRID :23000 MW INTER GRID CONNECTIONS INTER GRID CONNECTIONS  ER – WR SYNCHRONOUSLY LINKED THROUGH ROURKELA – RAIPUR 400 kV D/C ROURKELA – RAIPUR 400 kV D/C BUDHIPADAR – KORBA 220 kV 3 ckts. BUDHIPADAR – KORBA 220 kV 3 ckts.  ER – SR ASYNCHRONOUSLY LINKED THROUGH TALCHER – KOLAR HVDC BIPOLE (2X 1000 MW) TALCHER – KOLAR HVDC BIPOLE (2X 1000 MW) JEYPORE – GAZUWAKA HVDC BACK TO BACK (2X500MW ) JEYPORE – GAZUWAKA HVDC BACK TO BACK (2X500MW )

SCENARIO DURING HVDC POLE(S) OUTAGE IN CASE OF SINGLE POLE/BIPOLE OUTAGE OF TALCHER – KOLAR HVDC LINK, ADDITIONAL POWER OF IN CASE OF SINGLE POLE/BIPOLE OUTAGE OF TALCHER – KOLAR HVDC LINK, ADDITIONAL POWER OF 600 MW ( I POLE OUT) / 1850 MW (BIPOLE OUT) 600 MW ( I POLE OUT) / 1850 MW (BIPOLE OUT) WILL BE INJECTED INTO THE ER-WR GRID WILL BE INJECTED INTO THE ER-WR GRID THE ADDITIONAL POWER IN THE ER-WR SYSTEM WILL BE ABSORBED IN THE ER / WR GRID IN THE RATIO OF 30:70 THE ADDITIONAL POWER IN THE ER-WR SYSTEM WILL BE ABSORBED IN THE ER / WR GRID IN THE RATIO OF 30:70 (PROPORTINATE TO THE RESPECTIVE GRID CAPACITY) (PROPORTINATE TO THE RESPECTIVE GRID CAPACITY) AS ER – WR LINKS NORMALLY REMAINS LOADED TO ITS LIMITS, THE ABOVE ADDITIONAL POWER MAY TRIP THE ER-WR LINKS AND CAUSE FURTHER DISTURBANCE IN THE SYSTEM. AS ER – WR LINKS NORMALLY REMAINS LOADED TO ITS LIMITS, THE ABOVE ADDITIONAL POWER MAY TRIP THE ER-WR LINKS AND CAUSE FURTHER DISTURBANCE IN THE SYSTEM.

BASIC PRESUMPTIONS A) ER- WR GRID CAN ABSORB ADDITIONAL POWER OF 450 MW WITH OUT CAUSING GRID DISTURBANCE B) IN CASE OF SINGLE POLE OUTAGE OF HVDC THE HEALTHY POLE CAPACITY CAN AUTOMATICALLY BE INCREASED TO 1250 MW FROM 1000 MW C) FOR BOTH POLES HEALTHY CONDITION, POWER FLOW SHALL BE LIMITED TO 1700 MW 1700 MW OR OR TALCHER ST–II EX-BUS GENERATION, TALCHER ST–II EX-BUS GENERATION, WHICH EVER IS HIGHER WHICH EVER IS HIGHER D) FOR SINGLE POLE HEALTHY CONDITION, POWER FLOW SHALL BE LIMITED TO 450 MW 450 MW OR OR TALCHER ST -II EX-BUS GENERATION TALCHER ST -II EX-BUS GENERATION WHICH EVER IS HIGHER, LIMITTED TO SINGLE POLE CAPACITY WHICH EVER IS HIGHER, LIMITTED TO SINGLE POLE CAPACITY

PROPOSED SCHEME TO ENSURE GRID STABILITY a) BOTH POLES WERE HEALTHY AND ONE POLE GOES OUT INSTANT TRIPPING OF UNIT #6, (ONE OF THE FOUR STAGE-II UNITS) IF EX BUS GENERATION IS MORE THAN 1700MW INSTANT TRIPPING OF UNIT #6, (ONE OF THE FOUR STAGE-II UNITS) IF EX BUS GENERATION IS MORE THAN 1700MW b) BOTH POLES WERE HEALTHY AND BOTH POLES GO OUT IF EX BUS GENERATION IS MORE THAN 1100 MW IF EX BUS GENERATION IS MORE THAN 1100 MW UNITS #5 & #6 TRIPPED INSTANTANEOUSLY UNITS #5 & #6 TRIPPED INSTANTANEOUSLY UNIT #4 TRIPPED AFTER 250 m sec UNIT #4 TRIPPED AFTER 250 m sec IF EX BUS GENERATION IS MORE THAN 550 MW IF EX BUS GENERATION IS MORE THAN 550 MW  UNIT # 5 TRIPPED INSTANTANEOUSLY  UNIT # 4 TRIPPED AFTER 250 m sec  UNIT # 6 TRIPPED AFTER 500 m sec NOTE: STAGGERED TRIPPING IS ADOPTED TO ALLOW THE POWER SUMMATED SIGNAL RESETTING SUMMATED SIGNAL RESETTING

Inter Trip Scheme

PRESENT SITUATION  PGCIL HAS ALREADY TAKEN ACTION FOR UPGRADING HVDC POLE CAPACITY TO 1250 MW FROM 1000 MW. THIS DOES NOT MEET N-1 CONTINGENCY CRITERIA.  AS A FOLLOW UP, IN SREB MTG DTD ALL THE CONSTITUENTS AGREED TO THE NEED FOR BACK UP TRANSMISSION SYSTEM. FOR THIS, PGCIL NEEDS TO BE PERSUADED FOR PUTTING UP PROPOSAL IN NEXT SCM.

PROPOSED SOLUTION TO AVOID ANY UNIT TRIPPING AT TALCHER UNDER SINGLE POLE OUTAGE TILL BACK UP TRANSMISSION SYSTEM IS MADE AVAILABLE, FOLLOWING OPTION NEED TO BE ADOPTED: TO AVOID ANY UNIT TRIPPING AT TALCHER UNDER SINGLE POLE OUTAGE TILL BACK UP TRANSMISSION SYSTEM IS MADE AVAILABLE, FOLLOWING OPTION NEED TO BE ADOPTED: FLOW ON TALCHER-KOLAR IS KEPT IN THE RANGE OF MW FLOW ON TALCHER-KOLAR IS KEPT IN THE RANGE OF MW MW POWER IS DIVERTED FROM TALCHER ON GAZUWAKA HVDC (PGCIL HAVE PLANNED BERHAMPUR-GAZUWAKA 400 KV D/C LINE TO FURTHER STRENGTHEN THIS CORRIDOR, WHICH IS YET TO BE AGREED BY SR) MW POWER IS DIVERTED FROM TALCHER ON GAZUWAKA HVDC (PGCIL HAVE PLANNED BERHAMPUR-GAZUWAKA 400 KV D/C LINE TO FURTHER STRENGTHEN THIS CORRIDOR, WHICH IS YET TO BE AGREED BY SR)

THANK YOU THANK YOU