. Si upgrade workshop, 9 June 2003 - Hubert van Hecke Si Upgrade - Mechanics Review of Hytec study Mounting scheme Services.

Slides:



Advertisements
Similar presentations
Vertex Detector and Tracker Mechanics and Materials Bill Cooper (Fermilab) (Layer 1) VXD.
Advertisements

Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
Power Integrity Analysis and Optimization in the Substrate Design Harini M, Zakir H, Sukumar M.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Recent Study Topics Full length model with wafers, hybrids and cable as dead weight.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
I T i womiller VG1 Meeting UCSC November 10, 2005 ATLAS Upgrade Workshop Silicon Tracker Stave Mechanical Issues.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
PHENIX FVTX Status of Mechanical and Thermal Design Work Eric Ponslet, Shahriar Setoodeh, Roger Smith HYTEC Inc. FVTX Collaboration Meeting Albuquerque,
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Mechanics and Cooling of Pixel Detectors Pixel2000 Conference Genoa, June 5th 2000 M.Olcese CERN/INFN-Genoa.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
The Mechanical Structure for the SVD Upgrade
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Robert Pak DOE Review Jan. 19, Robert Pak 1 DOE Review Jan. 19, 2005 VTX HBD PHENIX Central Region From VTX Proposal (dims in mm) Integrate Detector.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Cooling System Solutions
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
PHENIX BNL 6/3/2005 Walter Sondheim, Jan Boissevain, Dave Lee PHENIX UPGRADES: SVTX + SI ENDCAPS.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
OUTLINE: 1.Current Design 2.Hybrids, Staves 3.Radiation Length 4.Cooling, etc.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
E. Da Riva/M. Gomez Marzoa1 WG4 Meeting - 27th June 2012 Air Cooling by means of carbon fiber structure Enrico DA RIVA (EN-CV-PJ) Manuel GOMEZ MARZOA (EN-CV-PJ)
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
ROSIER Ph End cap – TPC - LC Arrangements of detectors on the active area of the end cap (1/2) Squares, rectangles, lozenge of 300/350 mm or.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
TS Cool Down Studies TSu Unit Coils (24-25) N. Dhanaraj and E. Voirin Tuesday, 10 March 2015 Reference: Docdb No:
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
October 2014Silicon Pixel Tracker – Chris Damerell 1 Tracking sensor, one of 12,000, 8x8 cm 2, 2.56 Mpixels each Matching endcaps (only one layer shown)
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
SiD Solenoid Status and Plans
CFD-Team Weekly Meeting - 8th March 2012
Studies in zeotropic C2F6/C3F8 blends for reduced temperature cooling of the ATLAS SCT and pixel detectors + HTC measurements in these blends G. Hallewell.
Work packages status in Torino and perspectives
Metal Matrix Composites
Pixel Detector System (Barrel & Forward)
Perimeter.
Perimeter.
Presentation transcript:

. Si upgrade workshop, 9 June Hubert van Hecke Si Upgrade - Mechanics Review of Hytec study Mounting scheme Services

. Si upgrade workshop, 9 June Hubert van Hecke Hytec - material selection Material for the support structure was selected on the basis of: High radiation length Low density High stiffness Availability Materials considered: Cons: Availability, thermal expansion Strength, thermal expansion, density, RL GFRP Beryllium Carbon-Carbon Aluminum Usually used for thermal apps.

. Si upgrade workshop, 9 June Hubert van Hecke material - cont’d GFRP - graphite fiber - epoxy composite: which fiber? Choose one based on cost, availability. M55J

. Si upgrade workshop, 9 June Hubert van Hecke strength analysis Different structures were tried…. … and analyzed for strength. Dumbbell shapes have low bending strength. Choose single-barrel shape.

. Si upgrade workshop, 9 June Hubert van Hecke build in sections Atlas Si detector 3 sections, bolted together Endcap frame

. Si upgrade workshop, 9 June Hubert van Hecke cooling Based on the experiences with the Alice and Atlas cooling designs Negative pressure system Water-methanol CFC evaporative CFC single-phase And the lower total load (~2.2kW), and the lower power density ( W/cm ) choose single-phase CFC Run C6F14 or C5F12 at modest overpressure 2

. Si upgrade workshop, 9 June Hubert van Hecke cooling - cont’d Endcaps are cooled by tubes embedded in the support sandwich. Barrels are cooled with carbon-Carbon thermal plane with ‘Omega’ structure.

. Si upgrade workshop, 9 June Hubert van Hecke mounting scheme TPC/HBD mounts from the top CM yoke. The Silicon detector comes in from the bottom, much like the MVD does now. Translate or clamshell?

. Si upgrade workshop, 9 June Hubert van Hecke side view - services Power, cooling and signal services are brought in at both ends, using the entire perimeter.

. Si upgrade workshop, 9 June Hubert van Hecke services - power Power: at 0.1W/cm for 1.8V technology Total: 163A If the voltage drop over 100’ is 1%, then this can be delivered via copper cable if the area is 28cm. Total for barrel + 2 endcaps: 190 cm of copper. Disk r power(W) Current(A) 2 2 2

. Si upgrade workshop, 9 June Hubert van Hecke services - cooling Count tubes on various drawings. 1/2 of one endcap 128 tubes for 2 endcaps, bundle 9/cm 14 cm total Assume a similar area for the barrel [ air cooling -> more area ] 2 2

. Si upgrade workshop, 9 June Hubert van Hecke services - fibers Assume 1 fiber per ladder for the barrel, 2 per ladder for the endcaps: Barrel 86 cables = 16.9 cm Endcaps 64/end = 12.5 cm Total for fibers: 42 cm 2 2 2

. Si upgrade workshop, 9 June Hubert van Hecke services - how much space total area dz per end From ‘first principles’ 352 cm 1.4cm Current MVD: ~50% of perimeter 940 cm 2.5cm Rule-of-thumb from Veljko Radeka: 12% of Silicon area (Atlas) 1444 cm 5.7cm Assume that services (power, air, liquid coolant, copper and fiber are brought in on both ends, using the entire perimeter at r=20cm

. Si upgrade workshop, 9 June Hubert van Hecke to be studied Power distribution - local voltage conversion,mass issues Cooling - can some be done with air? Keep an eye on integration For the next round, technology choices need to be pinned down

. Si upgrade workshop, 9 June Hubert van Hecke future Our progress-to-manpower ratio compares favorably with industry standard. Our progress-to-funding ratio compares favorably with industry standards

. Si upgrade workshop, 9 June Hubert van Hecke services

. Si upgrade workshop, 9 June Hubert van Hecke -