Green Infrastructure at the Campus and Watershed Scale at the University of North Carolina at Chapel Hill Carolyn Elfland, UNC Chapel Hill Sharon Myers,

Slides:



Advertisements
Similar presentations
Project Background and Objectives
Advertisements

WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Low Impact Development Principles, Techniques, and Implementation Slide show prepared by: In coordination with:
Click to edit section. Low-Impact Development and Green Infrastructure - EPA  Low-impact development is an approach to land development (or re-development)
Stormwater Systems ARCH-433. Attendance This water closet, installed in Pullman, Washington, flushes in a counterclockwise rotation. In what direction.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
Low Impact Development Best Management Practices
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
Stormwater Outlets Effectiveness of the Options. Stormwater Outlets Several options are available, such as the infiltration basins under the parking lots.
How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY.
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
SUSTAIN Pilot Study April 25, 2012 Curtis DeGasperi King County
Physical Master Plan Update Sustainability Task Force Presentation for: Campus Environmental Sustainability Team 11/19/2013.
How do Wetlands Factor into New Infiltration Policies?
Jason R. Vogel, Ph.D., P.E. Stormwater Specialist Biosystem and Agricultural Engineering Oklahoma State University.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: I. Planners Training Exercise Review Marine Headquarters Case Study II. Complete.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Sally Hoyt, UNC Energy Services April 6, 2009
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Energy PUBLIC Running Water: Effective Stormwater Quality Practices Tracy Warner, Municipal Engineer for Ames, IA Josh Shields, Landscape Architect with.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Stormwater Management for Homeowners. Where does water go?
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
STORMWATER MANAGEMENT
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Presented by David C. Nyman, P.E. Comprehensive Environmental Inc. Annual Nonpoint Source Conference April 29, 2014.
Storm Water Runoff Storm Water Runoff
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
Lesson 2: Gimme a BMP!. Best Management Practices (BMPs) BMPs are ways to reduce the amount of water pollution caused by storm water runoff. -Rules put.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Comprehensive Thinking and Planning
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
LOW-IMPACT DEVELOPMENT
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
MIDS calculator Quantifies reductions in runoff volume for a given BMP or group of BMPs Quantifies reductions in phosphorus (P) and TSS runoff for a given.
Oklahoma State University
Matt Tunnard, PE, Ford Land Donald Carpenter, Ph
Kickoff example Create a new file
Intro MIDS Calculator Use
MIDS Calculator Use - Intermediate
Presentation transcript:

Green Infrastructure at the Campus and Watershed Scale at the University of North Carolina at Chapel Hill Carolyn Elfland, UNC Chapel Hill Sharon Myers, UNC Chapel Hill Ted Brown, Biohabitats, Inc. Sally Hoyt, Biohabitats, Inc.

Carolina North Main Campus Mason Farm

Overview Background Regulatory Framework Central Campus BMP Implementation Lessons Learned Carolina North Opportunities

Background Central Campus 740 acres 13.4 million square feet in million square feet to be added by 2010 Stormwater Issues Flooding and pipe surcharging increasing in frequency and severity Need to improve water quality leaving the campus

Background Satellite Campus – Carolina North 1000 acres Undeveloped except for small general aviation airport Plan to develop 250 acres in 50 years Aggressive sustainability goals, including stormwater

Regulatory Framework Town of Chapel Hill Zoning 85% TSS removal for first 1 inch of preciptation Volume leaving site post-development shall not exceed volume pre-development for the 2 year 24 hour storm event (3.60 inches) Rate leaving site post-development shall not exceed rate pre-development for the 1 year storm – 3.0 inches 2 year – 3.60 inches 25 year – 6.41 inches 50 year – 7.21 inches

Regulatory Framework Jordan Lake TMDL Existing development or redevelopment 35% total nitrogen reduction 5% total phosphorus reduction New development 2.2 lbs/acre/year unit loading rate target for total nitrogen 0.82 lbs/acre/year unit loading rate target for total phosphorus

Watersheds Bolin (lavender) Battle (gray) Chapel (blue) Meeting of the Waters (pink) Morgan (beige)

Campus Best Management Practices Type of BMP Number Green Roofs 3 Permeable Pavement 7 Bioretention9 Vegetated Conveyance 2 Ponds and Wetlands 9 Underground Water Quality Devices 7 Underground Storage (including cisterns) 19 Land Cover Conversions 15

Best Management Practices PhillipsHall/MemorialHall

EstesStorageLot

FridayCenterLot

CarringtonHall

HookerFields

RamsHeadCenter

plastic storage modules cisterns RamsHeadCenter Best Management Practices

RamsHeadCenter

RamsHeadCenter

RamsHeadCenter

Fed-ExGlobalEducation

Land Cover Pre- Construction Change Without BMPs Change With BMPs Pervious Acreage acres acres Impervious Acreage acres acres Total Nitrogen +224 lbs/yr -556 lbs/yr Total Phosphorus +14 lbs/yr -57 lbs/yr

Central Campus Lessons Learned Don’t put cisterns on roofs Cistern water is not free Make careful plant selections for green roofs Porous paving design makes a difference High quality fill material is important Education is critical

Carolina North Carolina North Applying Central Campus Lessons in an Integrated, Sustainable and Holistic Manner

Carolina North Up to 250 acres of a 1,000 acre parcel to be developed sustainably (energy, landscape, water, transportation, buildings) over next 50 years.Up to 250 acres of a 1,000 acre parcel to be developed sustainably (energy, landscape, water, transportation, buildings) over next 50 years. Currently small regional airstrip surrounded by mixed hardwood and pine forest.Currently small regional airstrip surrounded by mixed hardwood and pine forest. Site also contains an inactive municipal landfill, a chemical waste site currently undergoing remediation and old municipal public works and bus depot yardsSite also contains an inactive municipal landfill, a chemical waste site currently undergoing remediation and old municipal public works and bus depot yards

Phase 1 – First 15 Years

Phase 1 Principles Respect the ecology of the site Focus on transit-oriented development Create a sense of identity and place Provide appropriate local connections for bike, pedestrian, transit & roadways Design for efficient land use with appropriate density

Stormwater Strategies Develop a water budget for the site that mimics the natural, undisturbed infiltration capacity of the land using practices and techniques that emphasize vegetative filtering and uptake and/or infiltration.Develop a water budget for the site that mimics the natural, undisturbed infiltration capacity of the land using practices and techniques that emphasize vegetative filtering and uptake and/or infiltration. Provide water quality treatment for all impervious areas using practices that emphasize vegetative filtering and uptake and/or infiltration.Provide water quality treatment for all impervious areas using practices that emphasize vegetative filtering and uptake and/or infiltration. Provide treatment as close to the generating source as possible.Provide treatment as close to the generating source as possible. Horace Williams - Carolina North

Existing Land Cover for Phase 1 at Carolina North

Proposed Land Cover for Phase 1 at Carolina North

Summary of Existing and Proposed Conditions Peak Discharge and Runoff Volume Assumes no water quality or water quantity controls in place.Assumes no water quality or water quantity controls in place.

Summary of Peak Discharge and Runoff Volume with Application of Green Infrastructure Assumes half of impervious surface (~34 acres) is converted to either green roofs or porous pavement.Assumes half of impervious surface (~34 acres) is converted to either green roofs or porous pavement. Still requires ~8 acre-feet of storage to provide peak flow attenuation.Still requires ~8 acre-feet of storage to provide peak flow attenuation.

New Development Nutrient Loading Pre- and Post-development Jordan lake unit loading criteria (2.2 lbs/ac/yr and 0.82 lbs/ac/yr for TN and TP, respectively) are required for 20 acres of new development.Jordan lake unit loading criteria (2.2 lbs/ac/yr and 0.82 lbs/ac/yr for TN and TP, respectively) are required for 20 acres of new development. Computations based on Tar Pamlico unit loading spreadsheet.Computations based on Tar Pamlico unit loading spreadsheet.

Nutrient Export with Application of Green Infrastructure Components Half the rooftops to be green roofs, the other half served by cisterns.Half the rooftops to be green roofs, the other half served by cisterns. Half of the transportation area porous, and half of the managed turf area converted to forest.Half of the transportation area porous, and half of the managed turf area converted to forest. Green roofs behave like managed pervious areas. Area draining to cisterns removed from the total area (total area is reduced from 20 acres to 16.7 acres).Green roofs behave like managed pervious areas. Area draining to cisterns removed from the total area (total area is reduced from 20 acres to 16.7 acres). Area consumed by porous pavement has same loading as managed pervious area.Area consumed by porous pavement has same loading as managed pervious area. BMPs removal as 35% and 45% for total nitrogen and total phosphorus, respectively.BMPs removal as 35% and 45% for total nitrogen and total phosphorus, respectively.

Conclusion UNC has committed to wide-scale implementation of green infrastructure elements across its campus, using an adaptive management approach.UNC has committed to wide-scale implementation of green infrastructure elements across its campus, using an adaptive management approach. Campus is evolving towards a whole systems approach that considers the benefits and treatment capabilities of soils, vegetation, and topography as well as the beneficial uses achieved through rainwater harvesting and water conservation.Campus is evolving towards a whole systems approach that considers the benefits and treatment capabilities of soils, vegetation, and topography as well as the beneficial uses achieved through rainwater harvesting and water conservation. Carolina North will be an example of UNC holistically applying green infrastructure principles in a fully integrated and multi-functional manner.Carolina North will be an example of UNC holistically applying green infrastructure principles in a fully integrated and multi-functional manner. The intended outcome of UNC’s green infrastructure efforts is to maintain the sense of place that defines the campus community by creating and enhancing connections and linkages between human and natural systems in a manner that promotes education, stewardship, and participation.The intended outcome of UNC’s green infrastructure efforts is to maintain the sense of place that defines the campus community by creating and enhancing connections and linkages between human and natural systems in a manner that promotes education, stewardship, and participation.

Questions?