1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.

Slides:



Advertisements
Similar presentations
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Advertisements

1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
SOLUTIONS TO SAVE WATER. Did you know that the water you drank this morning might have been the same water a dinosaur drank millions of years ago? There.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
Explain the benefits of exterior home care Analyze home maintenance techniques.
Water Use and Management Chapter 11, Section 2. Global Water Use Three types of major uses of water –1. Residential use –2. Industrial use –3. Agricultural.
1 HBD HV Status Update Jason for the HBD crew Jan 30, 2007.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
1 Stony Brook Update Jason Kamin… the Cleaning Machine! T.K. Hemmick.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
1 Stony Brook Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions Excellent!!!
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update: What a long STRANGE TRIP its been T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
1 Some updates on water and other items… Stony Brook HBD Crew…
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
PHENIX Smoke Alarms Incident, 27-May-2016 Mickey Chiu, for the PHENIX Operations Crew.
1 Update from the Tent Thomas K Hemmick for the Tent People.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
T.K. Hemmick for the Stony Brook Crew
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
T.K. Hemmick for the Stony Brook Crew
Progress/Status on Cherenkov Beam Test
Presentation transcript:

1 HBD Update Back to the Future T.K. Hemmick for the HBD crew

2 HBD Group Bring East HBD Back to SBU East detector has been troublesome –15% dead in May 2009 –5% dead in June 2009 Cause is known: West detector built using intrinsically cleaner and quicker procedure Solution: Bring the East Home, swap out bad GEMs

3 Matt Climbing the Walls Prior to shipping of the HBD back to SBU, Matt and his crew cleaned the tent thoroughly. Access to the coarse filters is from above. No, he didn’t fall!

4 New GEMs Required Resistors Here Matt and Benji are putting resistors on fresh GEMs constructed at WIS. All this work went smoothly. These and the original GEMs from the detector were all washed in DI water.

5 Source Removal The HBD contains two radioactive sources, both contained in the so-called CUBE. To avoid expensive transport the CUBE was removed at BNL Instr. Clean room.

6 De-combobulation All the GEMs were removed & washed. Most that were trouble in Run-9 did not recover with washing. All Au GEMs washed same day as transport. It is important to get the CsI off right away as it becomes resistive in air. No visual evidence of the source of MESH-GEM short.

7 Re-combobulation All Cu GEMs have been replaced in the HBD and tested good at 550 V in air. HBD with all Cu GEMs is presently in the glovebox. As always, a fresh HBD is a water load on the Glovebox. Water levels now good.

8 Evaporation. The first test evaporation showed excellent QE. 4 Au GEMs have a complete evap and will be installed today. 6 more to go…

9 LEGS Running Recirculating Helium through closed loop (no HBD) All systems working. Fresh scrubbers ( ) Benji updated LabVIEW display to highlight true path of gas (what we use) and indicate our past plumbing changes. Water Oxygen

10 Anticipated Schedule Full GEMs installed by next week. This leaves extra time for HV testing. We no reason that the HBD would return later than the end of the month. Matt Durham Smiling