Australia Telescope Users Committee Technologies Report - Nov 2007.

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
E-VLBI progress in the South Tasso Tzioumis ATNF, CSIRO September 2006 “Towards e-VLBI”  “e-VLBI”
A supercomputer-based software correlator at the Swinburne University of Technology Tingay, S.J. and Deller, A.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
Interference Daniel Mitchell, ATNF and Sydney University.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Current mm interferometers Sébastien Muller Nordic ARC Onsala Space Observatory Sweden Turku Summer School – June 2009.
Receiver Systems Suzy Jackson – based on previous talks by Alex Dunning & Graeme Carrad.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
Technical Interests on the SKA Noriyuki Kawaguchi National Astronomical Observatory of Japan SKA Workshop November 5, 2010.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
1 WP3 Progress towards objectives 27/10/ WP3.1 Communications equipment for trials The objectives of this work package are: to configure existing.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
ATUC meeting Director’s Report Brian Boyle May 2008.
Molecular Clouds in in the LMC at High Resolution: The Importance of Short ALMA Baselines T. Wong 1,2,4, J. B. Whiteoak 1, M. Hunt 2, J. Ott 1, Y.-N. Chin.
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Australia Telescope Users Committee Technologies Report - Oct 2008.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Parkes ATUC Report Nov Stats Scheduled observing time (2007) –85% Downtime (last 12 months): –1% system faults –3.1% high wind.
Australia Telescope Users Committee - Technologies Report - May 2008.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Possible Instrumentation Development Items for SKA at ASIAA Chau-Ching Chiong (ASIAA) and Yuh-Jing Hwang, Homin Jiang, Chao-Te Li.
The CSIRO ASKAP Science Data Archive Progress and Plans
The Development of Broadband VLBI Technologies in SHAO
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Rick Perley National Radio Astronomy Observatory
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
EVLA Advisory Committee Meeting System Status
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
Australia Telescope Users Committee Technologies Report – October 2011
PHAROS PHased Arrays for Reflector Observing Systems
Correlator Growth Path
EVLA Construction Status
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

Australia Telescope Users Committee Technologies Report - Nov 2007

7mm Upgrade Spare 3/7/12mm receiver for Compact Array Spares for upgrading Mopra Pulsar Digital Filter Bank 13mm receiver for Parkes Pulsar Digital Filter Bank for others Compact Array Broadband Backend 20/13 and 6/3cm upgrade

7mm Upgrade - Array outfitted and science being done.

Spare 3/7/12 mm receiver installed on the Array. With 3 mm calibration signal injection

7mm spares for Mopra upgrade Completed for Narrabri staff to refit by March 2008

-PDFB2 at Parkes with 1 GB bandwidth and proving to be a valuable tool. -Some trade off between the multibit digitisation and sensitivity to impulsive noise sources. These have less impact when using one bit digitisation. -PDFB3 is anticipated to be functional by mid December and will have a capability for dealing with the impulsive noise. -April 2008 is the planned date for engineers, visiting from overseas observatories, to construct their own replicas of the Parkes system. Pulsar Digital Filter Bank

- Dewar components have been assembled and leak tested to prove the vacuum integrity of the package. - Control and monitor electronics for the receiver is near complete. Control and monitor electronics for the conversion and local oscillator chain is on track for a late Nov / early Dec finish. - Conversion system and local oscillator chain are both prototyped and the mechanical design of their housings are underway for submission to the workshop. - Integration of these elements into the dewar framework will be designed after their mechanical design is complete. -Feb 2008 is the planned installation. Parkes 13mm Receiver

Compact Array Broadband Upgrade – CABB Position We are not in a position to recommend the changeover to CABB at the planned date of May It was anticipated that by now 2 to 3 antennas would be outfitted and useful information on system problems might have been encountered and solutions to these in the pipeline. Not being in that position makes it is too much of a risk to commit to the planned changeover. Until that occurs it is difficult to estimate when it would be suitable to make the swap.

Compact Array Broadband Upgrade – CABB Problems: Generally, the use of latest technology has resulted in difficult challenges. More specifically, a redirection of effort was required to attend to: -faults with supplied commercial equipment that delayed manufacture of printed circuit boards. -bugs in the tools used to develop the newly released models of FPGAs and the like. ‘Is it me or is it them’ doubts led to excessive development effort. - difficulties in the fabrication of the CABB board due to its complexity.

Compact Array Broadband Upgrade – CABB Some success PCBs are being made with the newly setup fabrication lab. CABB DSP boards have been made but they represent the upper limit in complexity of board that can be made.

Local oscillator distribution (Control building) Advanced Telecom Compute Architecture (ATCA) rack Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) Patch Panel 32 MHz distribution Optical to electronic scheme RTMDSP Board Optical to electronic scheme RTMDSP Board RTMDSP Board RTMDSP Board RTM DSP BoardRTM DSP BoardRTM DSP BoardRTM Optical to electronic scheme RTMDSP Board Optical to electronic scheme RTMDSP Board RTMDSP Board RTMDSP Board RTM DSP BoardRTM DSP BoardRTM DSP BoardRTM Optical to electronic scheme RTMDSP Board Optical to electronic scheme RTMDSP Board RTMDSP Board RTMDSP Board RTM DSP BoardRTM DSP BoardRTM DSP BoardRTM WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM On antenna tests of equipment has resulted in signals being locked and transmitted through the conversion box, digitiser, signal transport and detected at the output of the RTM allowing a spectrum to be formed. Some success

Compact Array Broadband Upgrade – CABB Some success A test system in the Marsfield labs is almost complete.

Compact Array Broadband Upgrade – CABB Some success End of 2007 is a realistic timeframe to have three antennas outfitted with the interim single frequency CABB equipment, mounted off the pedestal and operating in parallel with the current system.

Compact Array Broadband Upgrade – CABB Options Given the history of the project it is difficult to predict when the full changeover can occur without having information from tests with three antennas. Our current best estimate is October One option is to outfit five antennas with antenna racks the interim single frequency CABB equipment operating in parallel with the current system. It is thought this could be achievable in May 2008 and would provide opportunities for observing with CABB during the winter season without the loss of current functionality. This option means some extra work predominantly for Narrabri staff who have been consulted and believe they have the resources to accomplish the tasks required.

20/13 and 6/3cm broadband upgrade. The redesigned OMT fins have corrected polarisation asymmetry at the high frequency end of the 20/13cm band. Further replacement units (end caps, probes and fins) are being made in pairs and will be installed sequentially. The next pair should be ready by mid December A priority task is to have ready the new conversion systems, required to ensure the existing receiver outputs are compatible with the CABB backend, ready for mid Procurement of components is underway however the timelines are tight if this is to integrate with the installation of CABB. A technical position is to be filled to assist. A Narrabri site interference survey has been completed to assess the spectral content of the frequency bands that are to be used. Consideration now has to be given to the efficacy of producing amplifiers that extend into high interference regions of the 20/13cm band. Report conclusion It seems that there may be some need to seriously look as to what benefits will be won, by going below 1200MHz, from the existing system, when mobile base station transmitters and impulsive beacons residing around 960 ‑ 1215MHz exist.

eVLBI and EXPReS On 28 August, eVLBI was demonstrated live at the APAN meeting in Xian China. It involved Mopra, Shanghai and 3 telescopes in Europe, all correlated on the JIVE hardware correlator in the Netherlands. Data rates achieved were 256 Mbps. 3C273 was observed and for a short time (all observations were <1 hour). With a km baseline (Mopra to Darnhall) it claimed the longest eVLBI on Earth. The press release was picked up internationally (slash/dot) and made The Australian locally. Best publicity we've ever had. On 7 October, the 3 ATNF antennas were connected to the JIVE correlator with 1 Gbps dedicated lightpaths. The ATNF antennas operated at 512 Mbps data rates and a full 12-hr observation was performed and correlated in real time at JIVE. An image of SN1987A was made with an ~100milli arc second beam at 12cm. A paper is in preparation. This work completes the contractual commitments under the EXPReS proposal. However, a 1Gbps connection to Europe will be retained and further eVLBI tests will continue.

MMIC Developments The project that laid the groundwork for MMIC developments has come to an end with the termination of the MNRF funding. CMOS process receiver on a chip development will continue under the ASKAP development Uncertainty introduced by dealings with TRW and the dwindling support base in the ICT centre has prompted investigations into a different process which uses GaAs substrates with InP performance called ‘metamorphic HEMT’ or MHEMT. Circuits have been designed and manufactured and await ‘on wafer’ testing. Some funding has been set aside in recognition of the possibility for further investigations or involvement in the field.

Other considerations WVRs in the planning stage Mopra multibeam study 115GHz upgrade FPA for Parkes

ATCA 7mm upgrade 7mm upgrade for Mopra Parkes 13 mm receiver PDFB3 PDFB external contracts CABB 20/13 and 6/3 cm upgrade ASKAP Water Vapour Radiometers CA Upgrade to 115 GHz Mopra Multibeam FPA for Parkes StudyFabrication eVLBI

ATCA 7mm upgrade 7mm upgrade for Mopra Parkes 13 mm receiver PDFB3 PDFB external contracts CABB 20/13 and 6/3 cm upgrade ASKAP Water Vapour Radiometers CA Upgrade to 115 GHz Mopra Multibeam FPA for Parkes StudyFabrication eVLBI

Mopra 3mmCompact Array 3mm