2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Shield.

Slides:



Advertisements
Similar presentations
Conduction Conceptests
Advertisements

HVAC523 Soldering.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Installation. Indoor Unit Installation Typical Installation.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Thermal Design and Modeling for Infra Red Spectroscopic Imaging Survey Payload (IRSIS) S. L. D’Costa.
ITS TGeo geometry Status and challenges By Bjørn S. Nilsen The Ohio State University.
Example 1:- An annular alloyed aluminum (k = 180 W/m . K ) fin of rectangular profile is attached to the outer surface of a circular tube having an outside.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Installation. Indoor Unit Installation Typical Installation.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
How Much Does a Cooling Pad Help Your Laptop?
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Purpose of this Minilab
DES DHE Electronics Chassis --- Vaidas Simaitis 1 DHE Chassis and Cooling DES Mechanical Workshop at FNAL November 2, 2005 Vaidas Simaitis.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Air Flow.
Installation. Indoor Unit Installation Typical Installation.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Project: Weather Video Sat 4/2/04 Mesa State College, Grand Junction.
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Hall D Target Design Status Jim Fochtman- February 22, 2012.
One-Dimensional Steady-State Conduction
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
Heat Transfer Equations. Fouling Layers of dirt, particles, biological growth, etc. effect resistance to heat transfer We cannot predict fouling factors.
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design.
Example: Unrestrained Expansion A rigid tank is partitioned into two equal parts as shown. One side of the tank contains 1 kg water at 100 kPa and at room.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Q17. Thermal Behavior of Matter
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
Shape Factor Example 2 The shape factor can be modeled as a thermal resistance where Rt=1/kS. Therefore, it can be integrated into the electrical circuit.
ASSEMBLING THE PCB Have the PCB in front of you as shown. Make sure there are no copper tracks showing. This side is called the component side.
Chapter 18 Temperature, Heat, and the First Law of Thermodynamics In this chapter we will explore the following topics: Temperature and the zeroth law.
Shape Factor Example The shape factor can be modeled as thermal resistance as R t =1/kS, Therefore, it can be integrated with the electric circuit analog.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
Exercises for Q1. Insulated copper tube A thin walled 10 mm copper tube is used to transport a low-temperature refrigerant with a temperature that is.
TUTORIAL 1 7/3/2016.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1)A g sample of vanadium (specific heat of 0.49 J/g˚C) was heated to ˚C (its initial temperature). This piece of vanadium is then placed into.
SPS High Energy LSS5 Thermal contact & cooling aspects
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
For the CMS Pixel detector
No Solder Battery Interrupter
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Status of GASPARD mechanics
Barrel TRT Module Cooling
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
LumiCal mechanical design, integration with LDC and laser alignment
FP420 Detector Cooling Thermal Considerations
Date of download: 3/7/2018 Copyright © ASME. All rights reserved.
Ch.12 Thermal Energy Thermal (Heat) Engine 14/11/2018.
Firestopping and Fireproofing in Head of Wall Assemblies
Example: Unrestrained Expansion
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Thermal behavior of the LHCb PS VFE Board
STUB configuration Mats Pålsson
For the CMS Pixel detector
Presentation transcript:

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Shield

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois2 Crate with shield 20 MIL COPPER WITH 1/4” TUBING SOLDERED ON INSIDE DELRIN STIFFENERS AT EDGES MULTIPLE LAYERS OF INSULATION ATTACHED TO INSIDE (NOT SHOWN)

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois3 Shield removal SHIELDS LIFT OFF RADIALLY – AVOIDS INTERFERENCE WITH OTHER PARTS DELRIN MOUNTS ON BOTH EDGES, BOTH SIDES

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois4 Crate on Telescope ABSOLUTE MAXIMUM DIAMETER = 54” FEED- THROUGH BOARD MAXIMUM DIAMETER ALLOWED FOR CAMERA INSERTION = 52” SHIELDS LIFT OFF RADIALLY

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois5 Possibly? The HEAT SHIELDS can be easily attached AFTER the camera is installed on the telescope. This would allow them to be bigger radially, which would provide for more insulation and therefore less radiant heat loss. The assumption is that the HEAT SHIELDS would be cooled with water/alcahol at approximately ambient temperature. This requires ANOTHER entire cooling installation!

2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois6 Alternative Thermal calculations have not been done yet, because: Is it worth it? The same shield WITHOUT the tubing for water cooling, but with maximum insulation, is a possible alternative. Thermal calculations greatly depend on final shield dimensions, which are yet to be determined.