Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Manual Flo-tap Installation Instructions
Click on this image to open the full PDF document.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
LHC CRAB CAVITY He Tank DQW Prototype P.Freijedo-Menendez C.Zanoni L.Giordanino R.Leuxe.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
DQW Cryogenic Magnetic Shield Internal Review Niklas Templeton 06/05/15.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Die Cast – Nickel Die Cast – Black Metalized Plastic Black Plastic Grey Plastic Plastic - Assorted Colors –Available only on 972 Series.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Cold Magnetic Shield Update
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Flange Plates to be Welded to Beam Flanges.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Integration of the Spectrometer Solenoid Magnets
ATLAS Internal ID Service Integration
CANTY QUICKPORTS™ “How they work”
MKTG 2016.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Baby-MIND Modules & Services
CERN – Zanon discussions
Crab – RFD prototype: Production Status Update
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Endcap shielding senarios:
Niklas Templeton – STFC – UK Collaboration
Design of Distribution Feedbox at LHC P7
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
EVLA LO/IF Racks/Bin/Modules
Auxiliary Pump Drive Option Replacement for D0S3002CX03
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
SNS PPU Cryomodule Vacuum Vessel
Magnetic shielding and thermal shielding
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Cold Magnetic Shield Assembly Nik Templeton 25/08/2015

Content RFD Shield Assembly DQW Shield Assembly New Helium Vessel interface Assembly Tooling & Accessories Queries Questions

RFD Shield iso-top view iso-btm view

RFD Shield X Section 2

RFD Shield Y Section 3

RFD Shield Z Section 4

RFD Assembly Procedure Bottom shield half pre-assembled 5

RFD Assembly Procedure Shield cavity and base plate assembled Cavity and base plate supported separately 6

RFD Assembly Procedure Top shield half assembled 7

RFD Assembly Procedure End port panels assembled 8

RFD Assembly Procedure Remaining panels complete shield assembly 9

RFD Assembly Procedure Vessel top plate connected Top plate support cavity Base plate supports shield End plates and dummy beampipe added 10

RFD Assembly Procedure Remaining shield connections assembled Side plates close vessel 11

RFD Assembly Procedure Welding operations seal vessel 12

DQW Shield iso-top view iso-btm view

DQW Shield X Section 14

DQW Shield Y Section 15

DQW Shield Z Section 16

DQW Assembly Procedure Cavity inverted 17

DQW Assembly Procedure Bottom shield panels assembled 18

DQW Assembly Procedure Cavity and bottom shield mounted off base plate 19

DQW Assembly Procedure Top shield panels assembled 20

DQW Assembly Procedure End panels and connectors complete shield assembly 21

DQW Assembly Procedure Top plate inserted 22

DQW Assembly Procedure End plates and dummy beampipe inserted Cavity is supported off top plate Shield supported from base plate 23

DQW Assembly Procedure Vessel is closed while supported from cavity Weld operations seal vessel 24

DQW Assembly Procedure Dressed cavity assembly completed 25

New Helium Vessel Integration 26

New Helium Vessel Integration 27

Assembly Tooling 360° manual rotation Lock in 4 orientations Versatile aluminium extrusion Adaptable for both Cavity-Vessels Additional support, tooling and slider options Fastens to 4 tapped holes in blank flanges Maximum access - ease of assembly 28

Tooling options Temporary base plate 29

Queries New helium vessel interface modifications Need for temporary spacers, supports or mounting of shield panels in order maintain shape during assembly process, please advise. Self-clinching nuts to be inserted before annealing process? Welding affect on shield Non-clean assembly plan: –pre-clean? –pre-bake? –with (dummy) cavity? 30

Thank you! Questions?