E2Epi Network Performance Workshops Eric L. Boyd.

Slides:



Advertisements
Similar presentations
Report on End-to-End Performance Workshop held at Joint Techs, Vancouver CA in July 2005 Matt Zekauskas, APAN 20 Measurement WG
Advertisements

Streaming Video: Overcoming Barriers for Teaching and Learning JISC/NSF Digital Libraries Initiative All Projects Meeting, Edinburgh.
Internet2 End-to-End Performance Initiative 11 January 2001 CSG Meeting.
Internet2 Technology Update Eric Boyd Deputy Technology Officer Internet2 TIP 2008 January 21, 2008 Honolulu, HI.
Performance Update Eric Boyd Director of Performance Architecture and Technologies Internet2.
LHC Monitoring: perfSONAR Overview Eric L. Boyd Director of Performance Architecture and Technologies Internet2.
Network Performance Toolkit (NPToolkit) A Knoppix Live-CD Rich Carlson Tools Tutorial 12/4/06.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
Performance Measurement and Monitoring Internet2 Fall Member Meeting Philadelphia, PA Eric L. Boyd – Internet2 Nicolas Simar – Dante.
Network Performance Measurement Atlas Tier 2 Meeting at BNL December Joe Metzger
Task force on Communications and Public Relations, TF-CPR (formerly known as TF-PR) Update March – June 2010 TF-CPR Workshop 15 October 2009 Carrie Solomon.
Inter-domain Performance Measurements (Plans, Schemas, and Fantasies) Jeff W. Boote Internet2 Jeff W. Boote Internet2.
GEANT Performance Monitoring Infrastructure – Joint Techs meeting July Nicolas Simar GEANT’s Performance Monitoring.
SALSA-NetAuth Joint Techs Vancouver, BC July 2005.
PerfSONAR Information Services Update Jason Zurawski Feb 2, 2009 Winter Joint Techs 2009, College Station Texas.
The Bonner Program: Serve 2.0 Initiative “Access to Education, A program of: The Corella & Bertram Bonner Foundation 10 Mercer Street, Princeton, NJ
27-Jan-2005 Internet2 Activities Toward a Global Measurement Infrastructure Matt Zekauskas Network Performance Measurement and Monitoring APAN19.
Internet2 Performance Update Jeff W. Boote Senior Network Software Engineer Internet2.
Communicating the LHC … the view from CERN James Gillies, 29 November 2005.
CPR and GAMMON Deployment Experiences. Warren Matthews Georgia Institute of Technology.
Internet2 E2EPI End-2-End Performance Initiative Jeff W. Boote Internet2 29 May 2006.
Internet2 & perfSONAR-PS August 23 rd 2012, OSG & perfSONAR-PS Meeting Jason Zurawski – Senior Research Engineer.
DataGrid Wide Area Network Monitoring Infrastructure (DWMI) Connie Logg February 13-17, 2005.
ASCR/ESnet Network Requirements an Internet2 Perspective 2009 ASCR/ESnet Network Requirements Workshop April 15/16, 2009 Richard Carlson -- Internet2.
E2Epi piPEs Update Eric L. Boyd. 2 Decomposing the Monolithic Measurement Architecture.
1 Network Measurement Summary ESCC, Feb Joe Metzger ESnet Engineering Group Lawrence Berkeley National Laboratory.
Internet2 Performance Architecture & Technologies Update Eric L. Boyd.
Performance Measurement CANARIE/DANTE/Internet2 Rome Meeting (Jan 05) Jeff Boote and Eric Boyd - Internet2 Nicolas Simar - Dante.
Performance Update Eric L. Boyd Director of Performance Architecture and Technologies Internet2 Eric L. Boyd Director of Performance Architecture and Technologies.
PerfSONAR-PS Functionality February 11 th 2010, APAN 29 – perfSONAR Workshop Jeff Boote, Assistant Director R&D.
13-Oct-2003 Internet2 End-to-End Performance Initiative: piPEs Eric Boyd, Matt Zekauskas, Internet2 International.
End-to-End Performance Initiative March 9, 2001 Internet2 Spring Member Meeting.
January 16 GGF14 NMWG Chicago (June 05) Jeff Boote – Internet2 Eric Boyd - Internet2.
1 Distributed Monitoring CERNET's experience Xing Li
Internet2 End-to-End Performance Initiative Eric L. Boyd Director of Performance Architecture and Technologies Internet2.
Internet2 and Cyberinfrastructure Russ Hobby Program Manager,
Interoperable Measurement Frameworks: Joint Monitoring of GEANT & Abilene Eric L. Boyd, Internet2 Nicolas Simar, DANTE.
US LHC Tier-2 Network Performance BCP Mar-3-08 LHC Community Network Performance Recommended BCP Eric Boyd Deputy Technology Officer Internet2.
Performance Update Eric L. Boyd Director of Performance Architecture and Technologies Internet2.
Spring 2004 Internet2 Member Meeting NLR Service Center Update Dave Jent Indiana University.
APEC-TPT ITS Group Action Plan (proposed) March 2000 DRAFT.
Institutional and Team Issues. CNI Collaborations among sectors involved in activities related to use of Internet in research and education Institutional.
GEMINI: Active Network Measurements Martin Swany, Indiana University.
July 19, 2004Joint Techs – Columbus, OH Network Performance Advisor Tanya M. Brethour NLANR/DAST.
14-Nov-07 OWAMP (One-Way Latencies) BWCTL (Bandwidth Test Control) Jeff Boote Network Performance Tools BOF-SC07.
PiPEfitters Salt Lake City Jt Techs (Feb 05) Jeff Boote - Internet2.
Advanced Network Diagnostic Tools Richard Carlson EVN-NREN workshop.
PiPEs Tools in Action Rich Carlson SMM Tools Tutorial May 3, 2005.
Task force on Communications and Public Relations, TF-CPR (formerly known as TF-PR) Update June – September 2009 TF-CPR Workshop 15 October 2009 Carrie.
1 Deploying Measurement Systems in ESnet Joint Techs, Feb Joseph Metzger ESnet Engineering Group Lawrence Berkeley National Laboratory.
1 Network Measurement Challenges LHC E2E Network Research Meeting October 25 th 2006 Joe Metzger Version 1.1.
Overview of the Internet2 E2E piPEs project for EGEE-JRA4 people G.V.
Internet2 E2EPI End-2-End Performance Initiative
Internet2 End-to-End Performance Initiative
Inter-domain Performance Measurements (Plans, Schemas, and Fantasies)
Eric L. Boyd, Internet2 Nicolas Simar, DANTE
Internet2 Performance Update
Internet2 E2E piPEs Joining the Federation of Network Measurement Infrastructures Eric L. Boyd 14 November 2018.
Internet2 E2E piPEs Project
E2E piPES Project Russ Hobby, Internet2 HENP Working Group Meeting
Internet2 E2E piPEs Joining the Federation of Network Measurement Infrastructures Eric L. Boyd 26 December 2018.
Transatlantic Performance Monitoring Workshop 2004
E2E piPEs Overview Eric L. Boyd Internet2 24 February 2019.
Internet2 E2E piPEs Update
E2E piPEs / AMI / OWAMP Status
Interoperable Measurement Frameworks: Internet2 E2E piPEs and NLANR Advisor Eric L. Boyd Internet2 17 April 2019.
“Detective”: Integrating NDT and E2E piPEs
Internet2 E2E piPEs Project
E2E piPEfitters A Collaborative, Services-based Approach to a Measurement Framework Eric L. Boyd Jeff W. Boote 4 August 2019.
Presentation transcript:

E2Epi Network Performance Workshops Eric L. Boyd

2 What’s the problem? Diagnosing E2E problems is often: ad hoc time consuming “unfair” / not uniform Example

3 E2Epi Network Performance Workshop Announcement: Internet2 has begun a new series of workshops Focus: Performance Tools BWCTL, OWAMP, NDT Installation Use Integration into IT support process Approach Hands on Interactive

4 Performance Tool Beacons BWCTL / Iperf Throughput tool with resource allocation broker Iperf is a tool developed by NLANR/DAST OWAMP One-way latency tool (one-way ping) NDT First-mile diagnosis of commonly encountered problems

5 Workshop Deliverables Working installation of BWCTL, NDT, and OWAMP at GigaPoP Working installation of BWCTL, NDT, and OWAMP at each campus Exchange of “keys” among campuses and GigaPoP Community of Collaborative approach to performance diagnosis

6 Workshop Host / Audience Each workshop has a host, expected to be a campus / GigaPoP Audience is network engineers from a GigaPoP and associated campuses Host must identify audience, make invitations, provide networking

7 Workshop History Developed/taught by Internet2 PAT Team (Spring ’05) SOX, hosted by GaTech (March ’05) wk/gatech/agenda.html wk/gatech/agenda.html CENIC, hosted by UCLA (June ’05) Joint Techs – Vancouver (July ’05) Orthogonal to focus on GigaPoPs Good opportunity to “kick the tires” After that, TBD …

8 What’s Next? The focus of this workshop is on building standalone tool “beacons” for prepositioned on-demand testing. We are currently developing (in conjunction with GÉANT2 JRA1) a measurement framework for: Regularly Scheduled Tests Measurement Point Discovery Alpha participants in measurement framework will be drawn from “deployment footprint”

9 Questions? Contact: Eric Boyd Further Details: wk/workshops-list.html wk/workshops-list.html

10