Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.

Slides:



Advertisements
Similar presentations
(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Advertisements

Chapter 12 - Replacement Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation (optional)
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
Chapter 9: Replacement Analysis
Engineering Economics in Canada
TYPES OF REPLACEMENT DECISIONS
CHAPTER 9 REPLACEMENT ANALYSIS.
Chapter 6 Annual Cash Flow Analysis
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford Unversity Press, Inc.1 Engineering Economic Analysis 9th.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 7-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
Engineering Economic Analysis Canadian Edition
Chap 10 Depreciation is a decline in market or asset value of physical properties caused by deterioration or obsolescence. It represents a legal loss of.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Copyright Oxford University Press 2009 Chapter 12 Income Taxes.
Chapter 11 Replacement Decisions
Chapter 20 Cost-Volume-Profit Analysis and Variable Costing
1 Project Cost Elements and Income Tax Rate to Be Used Lecture No. 26 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Making Capital Investment Decisions Chapter Ten.
CHAPTER 9 Replacement Analysis.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Operating and Financial Leverage 5 Chapter Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Classification of Costs Lecture No.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
1 Replacement Decisions How should an asset be replaced? If an asset can be overhauled and used a little longer, should those funds be invested in the.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Ch 9-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Engineering Economic Analysis - 9th Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
10-0 Making Capital Investment Decisions Chapter 10 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
3/16/2016rd1 Engineering Economic Analysis Chapter 13  Replacement Analysis.
Engineering Economic Analysis Canadian Edition
Replacement Analysis and Economic Life Should we replace an asset that we own now or later?
Comparison of alternatives
Replacement Analysis Lecture No. 46 Chapter 14
Annual Equivalent Worth Criterion
Engineering Economics
Operating and Financial Leverage
Engineering Economy: Replacement Study
10 Measures of Operating Capacity.
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Engineering Economic Analysis
Engineering Economic Analysis
Chapter 9: Replacement Analysis
Operating and Financial Leverage
Engineering Economic Analysis
REPLACEMENT DECISIONS
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Applying Annual Worth Analysis
Presentation transcript:

Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10

Replacement Analysis 2 When should a new truck replace the existing truck? When should a process be redesigned? When should a product be redesigned? The most common question asked in industry is: when should the existing be replaced? Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

Replacement Analysis Terms Defender: the existing equipment, building, or decision previously implemented Challenger: the proposed replacement currently under consideration 3 Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

4 Aspects of Replacement Analysis 1.Using available data to determine the analysis technique 2.Determining the base comparison between alternatives 3.Using analysis techniques when: 1.Defender marginal cost can be computed and is increasing 2.Defender marginal cost can be computed and is not increasing 3.Defender marginal cost is not available 4.Considering possible future challengers 5.After-tax analysis

5 Shall the defender be replaced now or be maintained for one or more periods? The Replacement Problem Engineers replace the existing due to: –Obsolescence: technological change –Depletion: loss of market value –Deterioration: wear that is overly expensive to repair Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

6 Issues (Consider Before Starting) –If a unit fails, must it be removed permanently from service, or repaired? –Are standby units available if the system fails? –Do components or units fail independently of the failure of other components? –Is there a budget constraint? –If the unit can be repaired after failure, is there a constraint on the capacity of the repair facility? Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

7 Issues (Continued) –Is only one replacement allowed over the planning horizon? Are subsequent replacements allowed at any time during the study period? –Is there more than one replacement unit (price and quality combination) available at a given point in time? –Do future replacement units differ over time? Are technological improvements considered? –Is preventative maintenance included in the model? Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

8 Issues (Continued) –Are periodic operating and maintenance costs constant or variable over time? –Is the planning horizon finite or infinite? –Are consequences other than economic effects considered? (i.e., sociotechnical issues) –Are income tax consequences considered? –Is “inflation” considered? –Does replacement occur simultaneously with retirement, or are there non-zero lead times? –Are cash flow estimates deterministic or stochastic? Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

9 Replacement Analysis Decision Chart WhereCompare Defender Marginal Cost DefenderBest Challenger 1AvailableIncreasingNext-year Marginal Cost EUAC at Minimum Cost Life 2AvailableNot increasingEUAC at Minimum Cost Life 3Not availableEUAC over Remaining Useful Life EUAC at Minimum Cost Life AnalysisTechniques Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

10 Decision Criteria leads to one of the following: If the defender is more economical, it should be retained. If the challenger is more economical, it should be installed. What Is the Basic Comparison? Identify the defender and the best challenger –Product –Machine –Process –Personnel –Mix Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

11 Minimum Cost Life of the Challenger Example 12-1 EUAC is the number of years at which asset cost in minimized. EUAC Equivalent Uniform Annual Cost Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

12 Marginal Costs Marginal Costs are the year-by- year costs for keeping an asset. This example illustrates the calculation of the marginal costs for a new item. Example 12-2 Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

13 Marginal Cost Data Defender Is the marginal cost of defender increasing? Here the marginal costs are increasing. Example 12-3 Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

14 Defender marginal costs are increasing Example 12-4 Replacement Analysis Technique #1 Replace when the marginal cost of ownership of the defender is more than the EUAC of the challenger. Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

15 These assumptions appear to be rather restrictive. Analysis Technique # 1 Appropriate when replacement repeatability assumptions hold The best challenger will be available in all subsequent years at the same economic cost The period of needed service is infinite Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

16 Relaxing the Restrictions This spreadsheet considers that: –The best challenger is available in subsequent years at the same economic cost –The project life is known and limited Based on Example 12-4 Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

17 Minimum Cost Life of the Defender Depends on when in the life of the defender the analysis is computed. Example 12-7 Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

18 Replacement Analysis Technique #2 –If the replacement repeatability assumption holds, compare EUAC of the defender asset at its minimum cost life against the EUAC of the challenger at its minimum cost life. Example 12-8 The repeatability assumptions do not hold. Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.

19 Here defining defender and challenger first costs can be an issue. Trade-in value is not a suitable value. Appropriate value is the market value. Replacement Analysis Technique #3 Compare the EUAC of the defender over its stated life against the minimum EUAC of the challenger. Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.