1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) 1302 329911 Fax: +44 (0) 1302 329922 ALAN AULD GROUP LTD 2 nd International Workshop.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Background Presenters Work done in preparation for WHS changes
Welcome to SMMs Presentation offering a synopsis of our Emergency Response Service on a 24 Hour basis PRESS RIGHT MOUSE CLICK IF YOU WANT TO MOVE BACK.
Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
Supervision and Administration
Health and Safety - an update Ian Gillett Safety Director.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
Paulina wawryca Paweł bilski Piotr mazur. Project risk.
VENTILATION FOR SINKING VERTICAL, SUB-VERTICAL AND DECLINE SHAFTS Derek Walters Turgis Consulting.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP ALAN AULD GROUP LTD Proposal.
BRC Storage & Distribution Safety and Quality Management System Training Guide
October 12th, 2006L. Mosca LAGUNA Meeting in Zurich 1 IPP- ETH Zurich October 12th, 2006 LAGUNA Meeting WG 7: Safety and Environment Report by L. Mosca.
Development & Implementation of Strata Control Practices
UK’s CDM Regulations 2007 and its Applications in Singapore
Trivandi major project consultants. About Trivandi Trivandi is an international consultancy that provides strategic advice, project management and assurance.
ISO 9000 Introduction Imran Hussain.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
‘OHS - A Survival Kit’ State Library of Victoria Buildings & Facilities Division (OHS) Occupational Health & Safety ‘A Survival Kit’ February 2002 Presenter:
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
H&S Consultants Consulting Services and Project Management.
Business Edge The Rhadyr, Usk, Monmouthshire NP15 1XJ Tel: Fax: ILM Level 3 Award in Leadership and.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
9 SEPTEMBER 2015 – KATHERINE MORRIS AND LUCY BOCHENEK Is it possible to comply with the safety aspects of the Petroleum & Gas (Production & Safety) Act.
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
Health and Safety Policy
高等职业技术教育教材 English for Construction Engineering 建筑工程专业英语 主 编:陆伟成 副 主 编:付 奕 尹春霞.
Important informations
CONTRACTOR MANAGEMENT AT XSTRATA COAL. INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Let Ascension take your business to new heights Tender Manager Scott Warnock Andrew Smillie.
1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.
Maria J Moracho Ramirez Regulatory Activities Section
African Regional Director
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Survey Meeting John Osborne, CERN 8 February 2016
What you need to know about handling major school works 5 th July 2013.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) LAGUNA PROJECT Paris Meeting – March 2012 Update.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP THE LAGUNA PROJECT Excavation.
INTERNAL AUDIT BRIEFING Business Objectives Business Objectives: What are they and how are they used?
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) LAGUNA LBNO Hamburg - February 2013 ALAN AULD.
ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD LAGUNA-LBNO.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD The design of a pan-European.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Joanne Macgregor C Lund & Son Ltd March 2016
Managing The GLOBAL Business
Roles and responsibilities PM
The Design Team Carl James.
Health and Safety Policy
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Prevention through planning, control and monitoring Harold Chinogurei
Back Ground Information
Phase 1 Statement of Work Preconstruction “Plan The Work”
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD 2 nd International Workshop Towards the Giant Liquid Argon Charge Imaging Experiment (GLA 2011) Department of Physics, University of Jyväskylä, Finland 5 th – 10 th June 2011

Presentation by the ALAN AULD GROUP LTD Experience and Issues in Underground Construction Alan AuldChairman and Managing Director of Alan Auld Group Ltd John ElliottManaging Director of Alan Auld Engineering Ltd Chris ThompsonManaging Director of Alan Auld Commercial Ltd ALAN AULD GROUP LTD 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Presentation Summary (1) AAG Experience in Underground Construction (2) Underground Construction Issues (3) Where AAG fits into the LAGUNA – LBNO Project (4) Risk Management ALAN AULD GROUP LTD

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) AAG Experience in Underground Construction (1) Company History and Background (2) Staff Experience (3) Deep Mine Development Experience

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Company History and Background Company started over 20 years ago by Alan Auld, formerly Chief Design Engineer for Cementation Mining Ltd, a deep underground mining development contractor Over the last 20 years we have steadily built the company from a 1 man band to a specialist boutique engineering company servicing the mining and civil tunnelling markets with a worldwide workload We now employ around 15 full time staff and another 10 part time specialists as required The company operates internationally in mining and civil engineering shaft sinking, tunnelling and underground construction from concept & feasibility studies through to project completion

Finland (Underground nuclear waste repository) Posiva Oy. Onkalo (Underground Rock Characterisation Facility), Olkiluto. Feasibility Study for 5.8m ID, 500m deep shaft Canada. Current. (Potash Mines) 1. PCS. New Brunswick. 2 No. 5.5m ID shafts, 885m deep currently being sunk. Shaft designers for the project 2. PCS. Saskatchewan. 1 No. 6.0m ID shaft, 995m deep currently being sunk. Design review 3. BHP. Saskatchewan. 2 No. 6.5m ID shafts,1030m deep commencing construction. Shaft designers for the project ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Alan Auld Engineering Ltd operate in an international market and have carried out work in many parts of the world

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Chile, South America. Current. (Copper Mine) Codelco. 2 No. 11m ID shafts, 950m deep. Feasibility stage design Nevada, USA. Current. (Gold Mine) Newmont Gold. 1 No m ID shaft, 732m deep through difficult, water bearing ground. Feasibility stage design. Louisiana, USA. Current. (Salt Mine) Inspection and design of shaft lining repairs Ukraine (Coal Mine) CCI – Lubelya. Design review of 2 No. 8m ID shafts, 900m deep. Mine currently commencing construction.

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Staff Experience Alan Auld 13 years as Chief Design Engineer for a deep underground mining development contractor. 20 years underground construction consultancy Brian Maskery10 years as a Quantity Surveyor, 19 years as General and Commercial Manager of mining and tunnelling companies including 7 years running his own tunnelling company. 11 years underground construction consultancy John Elliott17 years contracting experience as Site Engineer, Section Engineer, Agent, Project Manager for civil engineering and tunnelling works. 11 years underground construction consultancy Chris Thompson27 years in contracting as a Quantity Surveyor including tunnelling works. 6 years as Commercial Manager for civil and tunnelling contractors. 3 years underground construction consultancy

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) AAG Deep Mine Development Experience

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Deep Shafts Sunk from the Surface in the UK During (10 year period) ProjectClientContractorDiameter (m)Depth (m)Date Selby Wistow No.1 and No. 2 shafts British CoalCementation Mining Ltd (No. 1) 383 (No. 2) Selby Riccall No. 1 and No. 2 shaftsBritish CoalCementation Mining Ltd Selby Stillingfleet No. 1 and No. 2 shafts British CoalThyssen (GB) Ltd North Selby No. 1 and No. 2 shaftsBritish CoalCementation Mining Ltd Selby Whitemoor No. 1 and No. 2 shafts British CoalThyssen (GB) Ltd Dearne Valley shaftBritish CoalThyssen (GB) Ltd Castlebridge shaftBritish CoalThyssen (GB) Ltd Dodworth – Redbrook shaftBritish CoalAmalgamated Construction Co. Ltd Maltby No. 3 shaftBritish CoalCementation Mining Ltd Asfordby No. 1 and No. 2 shaftsBritish CoalCementation Mining Ltd TOTAL = 16

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) This 10 year period of deep coal mine construction in the UK saw a number of improvements in underground construction technology including the introduction of high strength, superior durability concretes and the transporting of structural quality concrete from surface to underground using small diameter pipelines. ALAN AULD GROUP LTD

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Deep Shafts Sunk from the Surface in the UK During (24 year period) ProjectClientContractorDiameter (m)Depth (m)Date NONE Total = 0

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) However AAG still retain their experience and knowledge from the earlier period which is now being put to good use currently in mining development worldwide

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Underground Construction Issues (1) Construction Requirements (2) Muck Disposal Logistics (3) Materials Handling Logistics (4) Construction Contractual Issues (5) Mine Legislation (6) Health and Safety (7) Risk Analysis

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Construction Requirements 1.1Phyäsalmi Mine situation 1.2Surface Works (Power, water, sewerage, data and communications) 1.3Underground Works 1.3.1Geotechnical and hydrological ground conditions 1.3.2Excavation and muck removal 1.3.3Ground stability control and temporary support 1.3.4Ground water control 1.3.5Lining and structural permanent works 1.3.6Internal permanent works

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Muck Disposal Logistics 2.1Shafts 2.2Decline 2.3Roadways 2.4Disposal Underground

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Excavation will be by drill and blast using automated computer controlled drilling equipment known as a ‘ Drilling Jumbo’ Excavation & Support Equipment

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Loading out the blasted rock will be by diesel powered front end loading equipment and load haul dump (LHD) mine trucks.

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Roof supports will be installed from the working area using mechanised drilling and installation equipment

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Materials Handling Logistics 3.1Shafts 3.2Decline 3.3Roadways

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Construction Contractual Issues 1. Tender documentation 2.Appraisal of contractors’ bids 3.Appointment of contractor 4.Monitoring of contractor’s performance technically and financially

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Mine Legislation 5.1Mine Manager’s statutory responsibilities 5.2Legal documentation 5.3Mines Inspectorate

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Health and Safety 6.1Training 6.2Safety equipment 6.3Emergency procedures including egress 6.4Ventilation 6.5Fire and control 6.6Flooding and control 6.7Large volume liquid gas emergencies 6.8Production of liquid cryogens 6.9Air quality monitoring

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Risk Analysis 7.1Identification of risks 7.2Risk Register

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Where AAG fits into the LAGUNA – LBNO Project (1) Planner and Co-ordinator for the WP2 (Deep Underground Facility and Costing) Work Package (2) Risk Management Consultant for the Underground Works

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Risk Management

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) What Is Risk? ‘Anything that poses a threat to the achievement of a department’s objectives, programmes, or service delivery for citizens’. (National Audit Office)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Why Take Risks? ‘Nothing will ever be attempted, if all possible objections must first be overcome.’ (Dr Samuel Johnson)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) What Makes Risk Management Important? ‘No construction project is risk free. Risk can be managed, minimised, shared or accepted. It cannot be ignored.’ (Sir Michael Latham)

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Failure to identify and/or manage risk is often a contributory factor in the failure to deliver construction projects on time and within budget. What Makes Risk Management Important?

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) At one time risk was frequently not considered until the end of the design process. Good practice and in some areas legislation now dictate that it is considered from the beginning. An international standard ISO was introduced in 2009 to set out guidelines for Risk management. Attitudes to Risk

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Risk management seeks to: Identify risks Assess the potential impact Identify mitigation/elimination measures Assess the residual impact Quantify Continually monitor the process The Process

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) The Process Should be workshop based Usually works better with a facilitator Should be continuous Output must be uniform One person should “own” the Risk Register

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) The Process

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Some considerations for LAGUNA: Scientific Construction Logistics Social Financial Political The Process

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) The assessment of risk involves both quantitive and qualititive analysis. It is therefore vital that the process involves people with the appropriate skills to make the necessary judgements. The Process

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Simplified Workshop Output PROJECTExampleDateJune 2011 RefRiskMinimum £ Likely £ Maximum £ ActionRemedialResidual AGroundwater inflow10K100K200KPumping/Grouting50K25K BAdverse ground conditions 50K250K750KSite Investigation150K50K CEquipment breakdowns 20K100K300KOn site plant workshop 100K10K Total80K450K1250K300K85K

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Simplified Risk Profile £8M £10M£12M

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Risk Manager’s View £8M £10M£12M Remove as much of this as possible

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Simplified Workshop Output PROJECTExampleDateJune 2011 RefRiskMinimum £ Likely £ Maximum £ ActionRemedialResidual AGroundwater inflow10K100K200KPumping/Grouting50K25K BAdverse ground conditions 50K250K750KSite Investigation150K50K CEquipment breakdowns 20K100K300KOn site plant workshop 100K10K Total80K450K1250K300K85K

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Typical ‘Monte Carlo’ Output

ALAN AULD ENGINEERING 1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) Software Systems Organisation Audit Trail Procurement Strategy Further Considerations