Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.

Slides:



Advertisements
Similar presentations
Strategic Planning Update For Board Meeting December 5, 2007.
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Overview of WECC and Regulatory Structure
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
ENVIRONMENTAL DATA IN TRANSMISSION PLANNING AUGUST 3, 2015 Carl Zichella DIRECTOR OF WESTERN TRANSMISSION.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Northwest Power and Conservation Council Action Plan Summary.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Studies Work Group Update
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Reliability Assessment Committee Proposal TSS Meeting
Planning Tools Overview
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
RE Grid Integration Study with India
Byron Woertz, Manager—System Adequacy Planning
Planning Tools Overview
Byron Woertz, Manager—System Adequacy Planning
Use of EDWG Data by the LTPT
Forecasting and Operations CAISO Case
Study Results Drought Scenario Study
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT

Organizational Chart WECC Western Electricity Coordinating Council PCC Planning Coordination Committee TSS Technical Studies Subcommittee Others … TEPPC Transmission Expansion Planning Policy Committee TAS Technical Advisory Subcommittee SWG Study Work Group DWG Data Work Group MWG Model Work Group SPSG Scenario Planning Steering Group EDWG Environmental Data Work Group RPCG Regional Planning Coordination Group 2 HMTF Hydro Modeling Task Force

TEPPC Transmission Expansion Planning Policy Committee Conduct and facilitate economic transmission planning – Develop and maintain public database for economic grid simulations and related analyses – Develop and implement inter-regional transmission expansion planning processes Coordinate with Planning Coordination Committee (PCC) Other WECC Committees Regional Planning Groups (RPGs) Other stakeholders – Guide and improve economic and operational analyses and modeling Conduct related transmission utilization studies Conduct related transmission expansion studies – Prepare inter-regional transmission planning assessments Accept study requests on an annual basis Approve an annual study program 3

Large Scale Grid Planning Load/Resource Balance – Load forecasts (including energy efficiency and behind-the-load meter generation) – Dependable capacity from existing and planned generation – Minimum planning reserve margins Generation Production Costs – fuel and variable O&M costs – carbon costs – opportunity costs (e.g., costs of curtailing renewable output) Capital Costs – Policy-driven generation and transmission additions Renewable Portfolio Standards (RPS) Clean Power Plan 111(d) requirements Greenhouse gas (GHG) reduction targets – Commercially-driven generation and transmission additions Utility and merchant developer plans Generic additions 4

TEPPC Work Products 5

TEPPC’s Study Tools Economic Grid Simulation Model – ABB’s GridView – 10-year: “Snapshot” AC data describing electric system topography: transmission lines, substations, generators, loads (converted for use in a DC solution model) – Snapshot data expanded to cover 8760 hours: Loads Run-of-river hydro output, other must-take generation Wind and solar output profiles – Economic data: fuel prices, heat rates for thermal units carbon costs opportunity costs (e.g., curtailment costs for renewable resources) institutional friction between balancing authorities – For each hour, dispatch generation to minimize variable costs subject to system constraints: Load-resource balance Path ratings and transmission facility ratings Generator capabilities (maximum and minimum output levels, start-up/shut-down times, ramp rates) 6

TEPPC’s Study Tools (cont.) Transmission Capital Cost Calculator – Generic cost estimates for transmission elements – Accounts for general terrain differences, environmental mitigation costs Generation Capital Cost Calculator – Generic estimates for different generation technologies – Accounts for projected technology improvements (“learning curves”) Long Term Planning Tool- LTPT – Generation and transmission expansion model – Accounts for environmental constraints when identifying new transmission – Very simplified production cost assessment – Used for long-term assessments (20 year horizon) Environmental Data Viewer – DataViewer – Combines environmental data layers using a visual format with a granularity of around 0.5 x 0.5 km – Accounts for terrain, water features, population centers, land use, transmission corridors – Identifies development exclusion areas, protected species locations – Assigns one of four environmental risk classifications to each cell 7

Information Flow & Review Process TEPPC Charter Goal : Consensus If needed : Member voting SPSG Charter Goal : Consensus If needed : Advisory voting TAS Charter Goal : Consensus “Issue voting” for all present “Process voting” by members DWG Goal : Consensus MWG Goal : Consensus SWG Goal : Consensus EDWG Charter Goal : Consensus If needed : Advisory voting

SPSG Scenario Planning Steering Group Provides strategic guidance to TEPPC on: – Emerging policy, regulatory, environmental, industry and social trends relevant to transmission expansion – Future scenarios to be modeled in studies – Modeling tools and datasets to be used – Key assumptions to be used in creating and reviewing the scenarios – Metrics to be used in modeling future scenarios Has defined four possible scenarios for long-term evolution of the western electric system Long Term Planning Tool (LTPT) used to simulate possible outcomes for each scenario Monitors “early indicators” on an on-going basis to assess likelihood of each scenario and to adjust scenarios Provides direction to EDWG 9

SPSG and 20-Year Studies Uses Long Term Planning Tool (LTPT) for 20-year generation and transmission expansion studies Builds a 20 year LTPT “Reference Case” by extrapolating data from the 10 year GridView “Common Case” LTPT-based studies intended to illustrate impacts of key issues under different credible futures (four scenarios): – “Economic recovery” – “Clean energy” – “Short term consumer cost focus” – “Long term societal cost focus” 10

EDWG Environmental Data Work Group Provides a forum for engaging stakeholders to collect and review environmental data with relevance to generation and transmission expansion planning Develop methodologies for applying environmental and cultural resource data to transmission planning (e.g., identify excluded or high risk land areas for infrastructure development) – Land classification system that identifies high to low-risk areas (4 risk categories) – Provides the opportunity to avoid or mitigate environmental and/or cultural risks at the planning level Regional environmental mitigation cost study for recently built transmission lines 11

RPCG Regional Planning Coordination Group The RPCG is made up of a member from each TEPPC-recognized Regional Planning Group. – Alberta Electric System Operator ( AESO) – British Columbia Coordinated Planning Group (BCCPG) – California Independent System Operator (CAISO –FERC Planning Region) – California Transmission Planning Group (CTPG) – ColumbiaGrid (FERC Planning Region) – Northern Tier Transmission Group (NTTG - FERC Planning Region) – WestConnect (FERC Planning Region) Purpose of group is to coordinate planning activities between and among the Regional Planning Groups and TEPPC. 12

TAS Technical Advisory Subcommittee Advises TEPPC in technical matters Undertakes studies a the direction of TEPPC related to: – Economic expansion of the Bulk-Power System – Policy-driven expansion of the Bulk-Power System Recommends technical details regarding TEPPC’s – Databases and their management (for both economic grid simulation and capital expansion studies) – Proposed annual study program – Preparation of reports describing assumptions, analysis, results and recommendations Conducts economic grid simulation modeling Conducts capital expansion studies Evaluate study results to facilitate economic expansion of the Western interconnection Determines software or modeling requirements and evaluates modifications to existing WECC computer programs related to transmission expansion planning Evaluate and explore new developments and techniques of interest to WECC 13

DWG Data Work Group With stakeholder input, develops and adjusts data necessary to execute TEPPC’s annual study program. For example: – Annual and monthly forecast peak and energy by region – Fuel prices by region – Update thermal unit heat rates – Monthly hydro production (low, average and high hydro years) – Incremental energy efficiency by region – Behind-the-load meter generation by region – Hourly energy shapes by location (load, hydro, wind, solar) – “Gap resources” to meet minimum planning reserves in each region – Resource/demand-side additions to satisfy Local Capacity Requirements Receives AC “snapshot” power flow case from Technical Studies Subcommittee (TSS )of the Planning Coordination Committee (PCC) – Converts AC “snapshot” power flow case into a DC model compatible with economic grid simulation model (which employs a DC solution algorithm) 14

Data Work Group Tasks With significant stakeholder support, the DWG is developing “Round Trip” capability – Goal is an efficient method to: (i) convert an AC “snapshot” power flow case into the system topography for an 8760 hour DC grid simulation model, and (ii) extract any hour from the DC grid simulation model and convert that hour into an AC “snapshot” power flow case – Will facilitate economic studies of reliability- based transmission upgrades – Will facilitate detailed reliability studies of expected system conditions 15

MWG Model Work Group Recommends modeling approaches and refinements to capture important aspects of electric system operation. For example: – Implementation of operating reserve sharing load areas – Defining trading hubs – Developing inter-regional hurdle rates to capture institutional fraction between areas – Modeling California’s AB32 taxes on carbon-based generation used to serve California loads Evaluates and proposes modeling improvements for the TEPPC study programs, for example, pumped hydro look ahead logic, battery dispatch, Monte Carlo, changes to internal data documentation, speed of computation 16

HMTF Hydro Modeling Task Force Reports to MWG Determines how to accurately model and account for hydroelectric resources in TEPPC study cases. Examples of projects of the HMTF – Assemble high, low, and medium hydro condition data sets – Pumped Storage Analysis Tool – Historic Hydro Dispatch Dashboard Tool 17

SWG Studies Work Group Screens study requests submitted in annual study request window Prioritizes study requests and submits priority recommendations to TAS (for subsequent approval by TEPPC) Processes requestor appeals of study priorities adopted by TEPPC Responsible for establishing the assumptions used in each of the study cases for TEPPC’s annual study program Manages the completion of the study cases approved in TEPPC’s annual study program Example Study Cases – Coal Retirement Study – Retire IPP Coal Plant and add 1200 MW combined cycle plant at IPP) – CAES, Zephyr and 12,000 gWh of wind in Eastern Wyoming – High PV saturation above California’s RPS standard 18

SWG Manages TEPPC’s Study Program Jan Feb-MarApril - Dec Oct-Dec Open Season for Study Requests Draft Study Program Development Analysis and Reporting Transmission Report Development 19