Tampa Electric Company

Slides:



Advertisements
Similar presentations
Where is PVs place in the Zero Carbon home? Confusion in the marketplace Carbon: The new language First Step: Energy efficiency The Final Mile: carbon.
Advertisements

Arizona State University – A Leader in Solar “…be the change you want to see in the world…” Mahatma Gandhi Bonny Bentzin Director, University Sustainability.
National Home Energy Conference 16 May 2006 Woking – Progress So Far Ray Morgan Chief Executive, Woking Borough Council.
Alberta Solar A Sunny Future with Municipalities.
 Premise 1 – What we don’t want ◦ We don’t want to own it. ◦ We don’t want to pay for it. ◦ We don’t want to maintain it.  Premise 2 – What we want.
Atlantis Energy Systems Inc. BIPV Building-Integrated Photovoltaic Systems Building The Sustainable Economy.
Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark.
Solar Energy : Here Comes the Sun!!! June 28, 2012.
The Nuts and Volts of Community Solar... USGBC Green Scene RJM Construction 701 North Washington Avenue February 26, 2015 Brian Ross, AICP, LEED GA.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
GroSolar.com | Billings Farm Road White River Junction, VT Guilford Road.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Photovoltaic Panels on Cronin’s House System Cost: $7.50 / Watt.
By Dale A Gulden, Solar Direct CEO. Solar Electric – Basic Components 1. Modules – solar electric collectors. 3 basic types in the marketplace: Mono crystalline,
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
© Copyright 2013, First Solar, Inc. Moapa Southern Paiute and Aiya Solar Projects.
Solar Pathfinder. Question What locations on campus would be the best candidates for solar PV array installations? Hypothesis We hypothesized that the.
Solar Energy Overview June 2014 JM Family Enterprises.
AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator.
Community Energy Independence Initiative Demonstration Project March 14, 2006.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Distributed Generation
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
IFMA Annual Meeting October 21, 2009 Rochelle Routman Environmental Affairs Georgia Power Company Georgia Power Sustainability Strategy.
Community Energy What is a community scheme ? Various options How our generation will change The community opportunity The Gwent Energy way Some of our.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
 Solar Integration/Development  EV Charging Infrastructure  Emergency Back-up Generators  Hannah Solar Gov’t. Services Hannah Solar Introduction AFV.
Link Building PV project By: Culver Matt Labaume Natasha Narnio Guillaume Roux Arnaud Stanton Andrew Thompson Matt Troyano Joana ENS Renewable.
SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Currently 45% complete Scheduled Completion is December.
Solar panel Mathieu and thomas. What is a solar panel Solar panel refers either to a photovoltaic module, a solar hot water panel, or to a set of solar.
Talbot County Project Sunburst Talbot County Department of Parks & Recreation Private/Public Partnership July 12,
Here Comes the Sun: Satisfying RPS with Solar Interdisciplinary Instigation.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Team Mulberry Andrew Smith, Joseph Entler, Bill Miller.
Atlantis Energy Systems Inc. BIPV Building-Integrated Photovoltaic Systems Building The Sustainable Economy.
Spring 2011 Convocation. Education Building Construction $19,013,000 Health and Safety Railings $470,000 A/C Upgrades – BE, LA, M&S $6,600,000 Theatre.
Converting to Solar Energy on College Campuses Alyson Rae McGonigle
Economics of Solar PV By Dan Catlin Energy Consultant & Air Quality Specialist, Fort McDowell Yavapai Environmental Department For presentation at: National.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
1 APEC EGNRET Member Economy Presentation Hong Kong, China.
Zac Perkins Chief Operating Officer. Member interest in renewables
CICV Solar Workshop. TPO* Laid Out… Service Agreement** Tax Exempt Entities TPO TPO* Finances Builds Owns Operates Maintains Sells output and/or services.
Electricity from Sunshine or Photovoltaic Energy Production By Charles D. Land, P.E.
1 Presented by: Refex Energy Limited. SWITCH ON THE SUN.
Energy Efficiency Forum Energy Efficiency Forum En ergy Savings: Where to Find Them September 27, 2006 Jim Parks, Program Manager Energy Efficiency and.
Interlocal Agreement with Flagler County related to Airport Development September 16, 2014 City Council Meeting.
POWER GENERATION  Solar energy is the best sustainable energy solution in Malaysia.  Malaysia’s equatorial climate provides fairly strong viability and.
SUNTREK SOLAR COMPANY Suntrek is a local firm located in lake Forest. Suntrek is working closely with O.C.C. to develop their new PV program this fall.
Civic Center/City Hall Public Information Meeting March 20, 2007.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Nizam Energy.  Established in 2012, as a subsidiary of a 150 Year old family business with interest in textile and hospitality.  Business is involved.
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
Energy Systems Integration Facility May Renewable and Efficiency Technology Integration ESIF Supports National Goals National carbon goals require.
Energy Futures A look BACK at and a look FORWARD to, “ENERGY use in WISCONSIN”
Greening Your Company in 2014: Opportunities to Improve Cash Flow and Maximize Environmental Benefits June 18, 2014.
Zero Net Energy (ZNE) Facilities Design Presentation to California State Lottery Commission November 20, 2014 Director’s Report 7c.
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
Building Services Summer 2016 Update
Dominion Investments in Virginia
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Logan Airport Parking Program Terminal E Garage
Wednesday, April 17, 2019 El Golfo 8739 Flower Ave
Presentation transcript:

Tampa Electric Company Tampa Electric Solar Project at Tampa International Airport September 15, 2015

Tampa Electric Solar Project at TIA 2 MWDC photovoltaic (PV) system located on the top floor of Tampa International Airport’s (TIA’s )Economy Parking Garage Installation includes car canopy on a concrete structure in keeping with the design of the garage Tampa Electric will own the canopy, PV system and energy output Panels are Solar World SW325 XL Mono (325 Watts) Shaded parking for the roof was an added benefit for the customer 25 year lease with TIA for the space

Tampa Electric Solar Project at TIA RFP issued in December 2014 EPC vendor (local vendor) selected in early 2015 Glint Glare Study performed City of Tampa permit issued in June 2015 FAA approval in June 2015 Construction activity commenced in July 2015 Working closely with TIA on weekly plans and daily coordination given other construction work in the area. Commissioning planned for late December 2015.

Tampa Electric Solar Project at TIA TIA is undergoing major renovations and additions to the airport property at the same time and location as the Solar Project

Tampa Electric Solar Project at TIA Communication and execution of the construction plan are critical when working around the many different TIA projects Part of TIA’s renovation program is to include sustainability and efficiency projects - the solar project fit perfectly into those plans TEC worked closely with TIA on an optimal design and location of the facility ultimately choosing the southern portion of the Economy Parking garage At completion of the PV system, we will place a TV monitor display in a high traffic corridor of the airport to educate the public about the PV system

Tampa Electric Company Latest Solar Project Tampa Electric has announced that it is investigating the addition of a 25 MWDC PV project to its generation portfolio. The project will be constructed turnkey with an EPC firm. The PV system will be sited near the Big Bend Station and the Manatee Viewing Center. This generation resource will provide energy diversity and reduce fuel costs and will use existing Company land. The site was selected due to its proximity to a 69kV transmission line and its visibility from US Highway 41 and the Company’s future Energy Technology Demonstration Center. Tampa Electric is in the process of receiving bids from the marketplace and will soon determine the project’s next steps.

Questions?