24/03/2010ALICE TOF General Meeting March 20101 TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
André Augustinus 16 June 2003 DCS Workshop Safety.
Francesco Noferini Centro Studi e Ricerche “Enrico Fermi”, Roma Bologna University & INFN Frascati Wednesday, 14 th November 2007 TOF contribution to the.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
André Augustinus 16 September 2002 Safety issues.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
André Augustinus 9 October 2006 Interlocks update.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
TS2 preparatory meeting
TS1 preparatory meeting
DT Infrastructure: LV, HV, Gas
Conceptual design of TOF and beam test results
Power cut 18kV cable for EMD404/E9 is heating
TPC Detector Control System
Taking data efficiently in RUN 5
Presentation transcript:

24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico Fermi”, Roma INFN Sezione di Bologna and CERN, Geneva

24/03/2010ALICE TOF General Meeting March Outline Overview of TOF hardware status 2010 data taking

24/03/2010ALICE TOF General Meeting March TotalGoodGood (%) Crate Power Suppy TDC Readout Module Status of VME Crate PS and December 2009 from Scioli’s talk, TOF General meeting December ‘09

24/03/2010ALICE TOF General Meeting March Status of VME Crate PS and March 2010 TotalGoodGood (%) Crate Power Suppy TDC Readout Module Seriuos incident Tuesday 16/3 at 03:55 in the UX mixed water circuit  overheating of several power supplies

24/03/2010ALICE TOF General Meeting March Front End Card power supplies (+ 38% spares) Crate and Readout Card power supplies used not used broken broken after due to magnet operations sectors  Side C Side A 100% of TOF LV channels available and powered ON, only 15% of spare channels used Status of LV Power March 2010

24/03/2010ALICE TOF General Meeting March x 180 Tripolar cables distribution box Unipolar cables CR4 L3 Magnet All HV channels available and powered ON, 98.4% of TOF detector is available. No more HV issues related to MRPC after Status of HV March 2010

24/03/2010ALICE TOF General Meeting March % of TOF detector is available, powered ON and ready for data taking (was 89.6% in December ‘09); TOF HV system seems getting a stable behavior; Hardware intervention foreseen asap to reach the 95.6% of TOF available. TOF Hardware Summary

24/03/2010ALICE TOF General Meeting March data taking

24/03/2010ALICE TOF General Meeting March LHC 2010 milestones 22 th February: LHC Restart 19 th March: two circulating proton 3.5 TeV 27 th March: minimal data set ( events) pp 900 GeV 30 th March: first attempt for pp 7 TeV

24/03/2010ALICE TOF General Meeting March data taking up to now No stable beam up to now in TOF has participated in 227 cosmic runs for 223 hours showing good stability.

24/03/2010ALICE TOF General Meeting March data taking (only): 35 weeks of p-p collisions  280 days 5 weeks of Pb-Pb collisions 280 ON-CALL shifts (24h each)  47 on-call blocks  3 experts CERN 840 shifts (3 shifts of 8h each per day)  140 blocks Bologna: 16 people  51.6% Salerno: 4 people  12.9% Centro Fermi: 3 people  9.7% ITEP: 4 people  12.9% Kangnung: 4 people  12.9% Present (Official) planning for 2010

24/03/2010ALICE TOF General Meeting March Most reliable scenario Ion beam to SPS Ion beam setup

24/03/2010ALICE TOF General Meeting March TOF was ready at the beginning of the cosmic data taking in August …and it continues to be ready!!! Gilda’s conclusion, TOF General Meeting December ‘09 … and it is now more and more ready

24/03/2010ALICE TOF General Meeting March backup

24/03/2010ALICE TOF General Meeting March  Serious incident Tuesday 16/3 at 03:55  Automatic refill (to compensate falling pressure) of UX mixed water circuit failed due to stuck water valve  Further drop in pressure stopped the pumps  Manual refill and restart by piquet in ~1.5 hrs  Failing valve exchanged later during the day From 27 th ALICE DCS Workshop, CERN 22 March 2010 (André Augustinus presentation):  Serious impact on ALICE equipment  Stop of SPD cooling plant (and power supplies), and later HMPID cooling plant  (Over-) heating of several power supplies  Lead to switch-off of many parts of the experiment  TOF lost 48V power supply when trying to repower them, might need to investigate with CAEN

24/03/2010ALICE TOF General Meeting March Rack I32 (TOF) The Central DCS saw a rise in temperature for TOF racks but not enough to trigger the hardware interlock…

24/03/2010ALICE TOF General Meeting March TOF: 227 runs for 223 hours