Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.

Slides:



Advertisements
Similar presentations
FANS (Future Air Navigation System) Flight Crew Procedures
Advertisements

Reduced EDCT Window CDM A&D Meeting December 13, CDM Meeting Daytona Beach, FL Presented by Roger Beatty - AAL SOC.
FP6/FP-7 IT System 1 FORCE: WEB BASED EDITOR OF FORMS C FOR FP-6 AND FP-7.
Scotia Applause FY2007 Q4 Web Metrics Report Scotia Applause FY2007 Q4 Web Metrics Report August 1 to October 31, 2007.
B1 Backwards Compatibility CSG October 2012, Long Beach, CA, USA F. Picard, EGIS AVIA.
CareCentrix Direct Training.
Enter question text... 1.Enter answer text.... Enter question text... 1.Enter answer text...
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 20, 2011 Federal Aviation Administration Data Communications DCIT #9 Flight Deck Working Group.
Enter question text... 1.Enter answer text.... Enter question text... 1.Enter answer text...
Feb 14, 2008 Airbus, Thales Air Systems, DSNA EMMA2 CPDLC trials in Toulouse EMMA2 outcomes from Toulouse trials.
Smart Meter Texas SMART METER TEXAS Third-Party Use Case 5 Third-Party Requests Information on Consumer Relationships August 22, 2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
Survey Management System Phase Two Presentation by Team S1.
Checking Network/Port Connectivity using Kaseya Agent Procedures Developed By: Emmanuel Giboyeaux Advisor : Dr. S. Masoud Sadjadi School of Computing and.
CPDLC / ADS Introduction 4/22/ :49 AM
CPDLC / ADS Operations 4/22/2017 2:35 PM
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Federal Aviation Administration Data Comm Production Summary vs. Trials: Presented To: DCIT WGs By: Production Sub-Team Date: March 13, 2014.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Harris.com Doug Dixon Key Site Ops Metrics and Benefits.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
NON-Export Controlled Information harris.com Jerry Smith OPS & Systems Engineering OPR Briefing.
1 Crosstalk iON Release 3. 2 New Live Chat Features iON 3  Session Notes –Add and modify notes to a customer session –Review from Chat History or Live.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
SUPPORTING PEOPLE PROVIDER FORUMS An overview of Supporting People’s new approach to Performance Monitoring and Quality Assurance.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Page 1 Contents Overview of ‘Quick Start Training’ Overview of Dlink+ w/CPDLC Basic Operation of Dlink+ w/CPDLC CPDLC Basics/Operational Scenarios – Connecting.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Flight Standards Update
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
FANS (Future Air Navigation System) Flight Crew Procedures
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Data Communications Program
Operational Context and Use Case Focus Group
Presentation transcript:

harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats

| 2 DCIT 39 Health Monitoring Report | | 2 Overview DCL Trials data for period 02/01/2014 – 02/28/2015 Slight decrease (4%) in eligible flights that received clearance but an increase in the number of flights that received Initial Modified and Revised CPDLC DCL (Departure Clearance) Failed received CPDLC DCL and high pilot response times were analyzed during this period. There are still occurrences where pilots are not logging in, requesting clearance, or receiving clearances. Issues reports are now being sent to each participating carrier each reporting period

| 3 DCIT 39 Health Monitoring Report | | 3 9.5% of total operations used CPDLC to obtain departure clearance 2,401 Eligible Flights –89.4% Initial CPDLC DCL – 2.8% Initial Modified CPDLC DCL – 0.3% Revised CPDLC DCL 7.8% Flights Failed to Receive Clearance via CPDLC –3.9% Failed to Logon –2.2% Failed to Request DCL –1.7% Failed to Receive DCL Key Points and Metrics

| 4 DCIT 39 Health Monitoring Report | | 4 Flights that requested clearance but didn’t receive clearance were analyzed. Reasons for pilots failing to receive clearance were found to be caused by –Downlink latency time greater than 40 seconds. –Free text entered in request clearance and pilot never request clearance again –Ground system disconnect session before sending clearance –Clearance was never sent Failed Received Clearance Analysis