O 2 Project Roadmap P. VANDE VYVRE 1. O2 Project: What’s Next ? 2 O2 Plenary | 11 March 2015 | P. Vande Vyvre TDR close to its final state and its submission.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
ALFA: The new ALICE-FAIR software framework
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
Status and roadmap of the AlFa Framework Mohammad Al-Turany GSI-IT/CERN-PH-AIP.
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
Quality Control B. von Haller 8th June 2015 CERN.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Tom Dietel University of Cape Town for the ALICE Collaboration Computing for ALICE at the LHC.
FLP data flow – FLP prototype Filippo Costa ALICE O 2 9 th June 2015 WUHAN, CHINA.
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
ALICE O 2 Plenary | October 1 st, 2014 | Pierre Vande Vyvre O2 Project Status P. Buncic, T. Kollegger, Pierre Vande Vyvre 1.
ALICE O 2 Workshop Busan | December 16 th 2014 | Pierre Vande Vyvre O 2 Project : Status Report 4th ALICE ITS, MFT and O2 Asian workshop Pusan, South Korea,
1 Status report on DAQ E. Dénes – Wigner RCF/NFI ALICE Bp meeting – March
Offline Coordinators  CMSSW_7_1_0 release: 17 June 2014  Usage:  Generation and Simulation samples for run 2 startup  Limited digitization and reconstruction.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting September 22, 2015.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
February 17, 2015 Software Framework Development P. Hristov for CWG13.
Erik Blaufuss University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
Pierre VANDE VYVRE for the O 2 project 15-Oct-2013 – CHEP – Amsterdam, Netherlands.
Predrag Buncic Future IT challenges for ALICE Technical Workshop November 6, 2015.
ALICE Online Upgrade P. VANDE VYVRE – CERN/PH ALICE meeting in Budapest – March 2012.
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
CWG13: Ideas and discussion about the online part of the prototype P. Hristov, 11/04/2014.
CWG9 Data Quality Monitoring, Quality Assurance and Visualization B. von Haller CERN.
ALICE Software Evolution Predrag Buncic. GDB | September 11, 2013 | Predrag Buncic 2.
ALICE O 2 project B. von Haller on behalf of the O 2 project CERN.
ALICE O 2 | 2015 | Pierre Vande Vyvre O 2 Project Pierre VANDE VYVRE.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
Workshop ALICE Upgrade Overview Thorsten Kollegger for the ALICE Collaboration ALICE | Workshop |
16 September 2014 Ian Bird; SPC1. General ALICE and LHCb detector upgrades during LS2  Plans for changing computing strategies more advanced CMS and.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
Current activities and short term plans 24/04/2015 P. Hristov.
Some topics for discussion 31/03/2016 P. Hristov 1.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
Predrag Buncic CERN Plans for Run2 and the ALICE upgrade in Run3 ALICE Tier-1/Tier-2 Workshop February 2015.
DAQ thoughts about upgrade 11/07/2012
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
O2 Project – Phase 2 Predrag Buncic
O2 Project Status Pierre Vande Vyvre
DPG Activities DPG Session, ALICE Monthly Mini Week
Workshop Computing Models status and perspectives
Outline ALICE upgrade during LS2
TPC Commissioning: DAQ, ECS aspects
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
QA tools – introduction and summary of activities
Preparation of the CLAS12 First Experiment Status and Time-Line
Commissioning of the ALICE-PHOS trigger
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

O 2 Project Roadmap P. VANDE VYVRE 1

O2 Project: What’s Next ? 2 O2 Plenary | 11 March 2015 | P. Vande Vyvre TDR close to its final state and its submission to the LHCC What’s next ? Build the system ! We need a roadmap with –Planning Work Breakdown Structure Major milestones with deliverables Identify technical decisions to be taken Review process –Resources

Commissioning milestones TargetCapabilitiesHardware Q ITS half-layer test-Detector element read-out 10’s of GBTs, 1 or 2 CRUs -QC core and detector module -DDS, CCM -Documentation Dedicated 1 Server 1 FLP TBD- Other detector tests such as TPC chamber or sector test -Detector element read-out 100’s of GBTs, ~10 CRUs Dedicated 1 Server Several FLPs 1 EPN Q ITS surface test -TPC surface test -Cosmic -1 full detector read-out -Long period operation -Standalone reconstruction possible Dedicated or remote use of final system Q4 2019ALICE Cosmic-Full capabilities at reduced performance -Test with data injected in CRU Final system ~10% EPN+DS ALICE/IT data challenges- Full chain including GRIDFinal system Q2 2020ALICE PbPb- Full capabilities at full performance 100% EPN+DS 3 O2 Plenary | 11 March 2015 | P. Vande Vyvre

FLP Data Flow Software (1) 4 Offline Run3 | 18 March 2015 | P. Vande Vyvre CRORC Read-Out (CRORC RO) Data Recorder Basic dataflow using common building blocks from Alfa Control, Configuration, Monitoring –DDS –State machines and messages QC –Framework –Detector-specific agent Merger CRORC RO QC Server DDS CCM Recorder

Data Flow Software (2) O2 Internal milestone dates with corresponding functionalities 5 O2 Plenary | 11 March 2015 | P. Vande Vyvre Sep ’15 (1.5) –CRORC read-out –Basic dataflow (use of common building blocks from Alfa to assemble the FLP dataflow) –System monitoring (using MonaLisa) –Reuse of the existing DATE infologger for information and error messages –DDS –Raw data format + conversion from existing Run1 data to Run3 format: (0.5) Dec ’15 (1) –Basic dataflow (FLP to EPN) –Control (state machines and messaging) –QC –Reuse of the existing ALICE eLogBook Dec ’15Availability of a CRU prototype Mar ’16System integration and characterization (1) Sep ‘16 Documentation (1) Dec ’16CRU firmware and read-out software (4) Dec ’16Release for the detector teams (e.g. ITS test of Q1 2017) (FTE yr)

Complete synchronous chain for ITS and TPC (1) 6 Offline Run3 | 18 March 2015 | P. Vande Vyvre Apr ‘15: –Full chain with TPC data of Run 1 and HLT algorithms with wrappers and without calibration Dec ‘16: Full chain for Run 3 –Framework with example algorithms e.g. CA –DDS: (2) –FLP to EPN data transport: (0.5) EPN: (3) FLP: (3) –CCDB (New OCDB database): (2) –TPC calibration: (4) –TPC compression: (1) 1 year: the HLT calibration could be added 2 years the CA in the new framework for GPU for a new person (FTE yr) (Input from Peter and Mohammad)

Complete synchronous chain for ITS and TPC (2) 7 Offline Run3 | 18 March 2015 | P. Vande Vyvre Full chain for all detectors: –Adding to the framework: 14 detectors x 1 = (14) (conversion of the Aliroot to the Alfa/O2 fw); –MCHF+MTR+MFT to be developed –FIT to be developed –Calibration TRD: (0.5) –Calibration TOF: (0.5) MC simulation: (ITS has already been upgraded for the upgrade) –Extract geometry –Geant4 multithreading: (1) –TPC geometry: (0.25) –TPC compressed hits, digitisation, timeframes: (0.5) –Other detectors: 14 detectors x 0.5 = (7) –Validation of simulation: (1) (FTE yr) (Input from Peter and Mohammad)

Project Schedule Some Key Milestones (1) 8 Offline Run3 | 18 March 2015 | P. Vande Vyvre Q CRU Availability Q Software Framework V1 Detector read-out 1 CRU QC → ITS half-layer test Q Software Framework V2 1 detector full read-out Dedicated hardware → ITS or TPC surface test

Project Schedule 9 O2 Plenary | 11 March 2015 | P. Vande Vyvre Q Software Framework V3 Full capabilities Deployment of 10% EPN+DS → ALICE Cosmic Q Data challenge 1 with IT dept. Q Full deployment EPN+DS → ALICE with PbPb collisions Q Data challenge 2 with IT dept. Some Key Milestones (2)

Next Steps 10 Offline Run3 | 18 March 2015 | P. Vande Vyvre Refine the WBS and the list of milestones –Finer grain tasks –Document all commissioning and internal milestones List the decisions to be taken and the process to reach them Milestones tracking –Create the corresponding lists of Jira issues with target dates Review process –Review the list of Jira issues during the O 2 plenary meetings