US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –

Slides:



Advertisements
Similar presentations
Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking Regulatory Branch U.S. Army Corps of Engineers Office of Wetlands, Oceans and Watersheds.
Advertisements

FDR1 - 1 Flood Risk management History/Mission/Policies.
Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
The South Sacramento Habitat Conservation Plan (SSHCP)
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Presented by: Terri Gaines DWR FESSRO February 28, 2014 Regional Permitting for the CVFPP.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Engineer Circular Requests to Alter USACE Projects
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
1 CERP – PDT WORKSHOP COMPREHENSIVE EVERGLADES RESTORATION PLAN April 2002 Project Implementation Reports.
Coastal Texas Protection and Restoration Project
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Module 29 Interagency & International Support Program Civil Works Orientation Course - FY 11.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Watershed Authorities, Policies and Procedures Michael Greer Regional Technical.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Western States Watershed Study 1 Photos from the State of New Mexico and Los Angeles District U.S. Army Corps of Engineers Websites U.S. Geological Survey.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
Draft Central Valley Flood Protection Plan Investment Strategy
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Water Resource Management Planning Update
Mahoning County Informational Meeting USACE Programs, Authorities, and Ohio Silver Jackets Program Presented by: Ashley Stephens 16 August 2016.
Presented By: Fran Borcalli, P.E. Program Manager
Stormwater Control Transfer Program Overview January 31, 2018
Water Resource Management Planning Update
Sacramento Environmental Commission January 2019.
Presentation transcript:

US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization – WRDA 2007 Post Authorization – Plan of Study For more information contact: Mike Dietl, Project Manager, Sacramento District Tel: Sacramento River Bank Protection Project: Phase II Supplemental Authorization – WRDA 2007 Post Authorization – Plan of Study For more information contact: Mike Dietl, Project Manager, Sacramento District Tel:

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Outline  Project Overview: –Purpose –Background –Status  Authority  Plan of Study –Approach –Policy Compliance –Other Issues

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Project Area Map

US Army Corps of Engineers Sacramento District Intended to protect the integrity of the SRFCP Intended to protect the integrity of the SRFCP Long-term bank protection and erosion control program Long-term bank protection and erosion control program Continuing construction project Continuing construction project Intended to protect the integrity of the SRFCP Intended to protect the integrity of the SRFCP Long-term bank protection and erosion control program Long-term bank protection and erosion control program Continuing construction project Continuing construction project Sacramento River Bank Protection Project – Purpose

US Army Corps of Engineers Sacramento District Original Authorization Phase I FCA of 1960 PL ,000 linear feet Completed in 1975 No Mitigation Project Reauthorization Phase II RBMAA of 1974 PL ,000 linear feet 13,000 linear feet remain Mitigation Authorized Sacramento River Bank Protection Project – Background

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Status  Erosion Survey of SRFCP Levees occurs annually.  2007 Inventory includes 152 sites.  2008 Survey completed in October, Draft Report Jan  Repair of Erosion Sites occurs annually.  8 sites constructed in  9,000 linear feet scheduled for  Prior to 1990’s 10,000 feet repaired annually.

US Army Corps of Engineers Sacramento District Location of 80,000 LF of Erosion Sites

US Army Corps of Engineers Sacramento District Section 3031 of WRDA 2007 authorizes additional 80,000 linear feet Section 3031 of WRDA 2007 authorizes additional 80,000 linear feet Phase II grows from 405,000 to 485,000 linear feet Phase II grows from 405,000 to 485,000 linear feet Implementation Guidance issued by HQUSACE on 6 June 2008 Implementation Guidance issued by HQUSACE on 6 June 2008 PADD is required in accordance with Appendix G of ER PADD is required in accordance with Appendix G of ER Section 3031 of WRDA 2007 authorizes additional 80,000 linear feet Section 3031 of WRDA 2007 authorizes additional 80,000 linear feet Phase II grows from 405,000 to 485,000 linear feet Phase II grows from 405,000 to 485,000 linear feet Implementation Guidance issued by HQUSACE on 6 June 2008 Implementation Guidance issued by HQUSACE on 6 June 2008 PADD is required in accordance with Appendix G of ER PADD is required in accordance with Appendix G of ER Sacramento River Bank Protection Project – New Authority

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Approach Phase II Supplemental Authority  PADD supported by an EDR  System-wide Benefit Analysis  Programmatic EIR/EIS  Programmatic Real Estate Plan  Target SPD approval in 2011 Phase III:  Start in FY2009  Policy Compliant  Consider Multiple Objectives

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Policy Compliance  No Plan Formulation  Programmatic Benefit Analysis  Simplified Risk Analysis  No 902 Limit  Programmatic Real Estate Plan Anticipated deviations from Policy:

US Army Corps of Engineers Sacramento District Vegetation on Levees

US Army Corps of Engineers Sacramento District Vegetation on Levees

US Army Corps of Engineers Sacramento District Mitigation n Overall approach consistent with recent SRBPP efforts with additional effort to: –Further maximize onsite mitigation –Mitigate off-site when on-site not feasible and/or adequate –Consider broader range of on-site/off-site mitigation scenarios –Consider use of appropriate Federal, State, or private habitat enhancement initiatives –Continue to use SAM, with supplemental analyses as needed

US Army Corps of Engineers Sacramento District Natural vs. Armored Banks

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Other Issues  Vegetation on Levees  Jeopardy Opinion  Ability to Mitigate On and Off Site  Species Recovery Plans  O&M Practices and Manuals  Mitigation Site Inventory and Monitoring

US Army Corps of Engineers Sacramento District Coordination with Other Programs n Central Valley Flood Protection Plan n State Plan of Flood Control n Sacramento/San Joaquin River Basins Comprehensive Study n American River Watershed Common Features GRR n West Sacramento GRR n Yuba River Basin GRR n Sutter County Feasibility Study n Levee Collaborative

US Army Corps of Engineers Sacramento District Stakeholder Feedback n 5 Agency Interviews Completed, 2 Agency and NGOs Remaining n Key Issues to Date –Reconciliation of veg policy with species recovery efforts –System-wide approach to avoid habitat fragmentation –Consideration of alternative designs –On-site mitigation prior to off-site –Coordination with other regional efforts –Continue in spirit of collaboration/cooperation

US Army Corps of Engineers Sacramento District Sacramento River Bank Protection Project – Questions