Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Low Emittance RF Gun Developments for PAL-XFEL
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
Undulator parameters choice/wish based on a simplified XFEL cost model Jürgen Pfingstner 29 st of July 2015.
X-Band Deflectors Development at SLAC
Max Cornacchia, Paul Emma Stanford Linear Accelerator Center Max Cornacchia, Paul Emma Stanford Linear Accelerator Center  Proposed by M. Cornacchia (Nov.
MAD Deck Updates Tor Raubenheimer October 15, 2014.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
J. Wu J. Wu working with T.O. Raubenheimer LCLS-II Accelerator Physics meeting May 09, 2012 Study on the BC1 Energy Set Point LCLS-II Accel. Phys., J.
Beam Optics of the TTF2 Nina Golubeva DESY. Beam optics from the BC2 up to the undulators General introduction to linear optics: – constraints for different.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
X-band Based FEL proposal
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Sara Thorin, MAX IV Laboratory
LCLS2sc MAD files: Injector to Bypass Line
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Beam-Based Feedback in LCLS-II
Thermal emittance measurement Gun Spectrometer
Revised Commissioning Strategy
12 GeV CEBAF.
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Time-Resolved Images of Coherent Synchrotron Radiation Effects
SuperB e+/e- main linac and diagnostics studies
Linac/BC1 Commissioning P
LCLS-II β-Matching Study
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
LCLS Commissioning P. Emma, et al
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Operational Experience with LCLS RF systems
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Bunch Compressor Beam Line Optics
Presentation transcript:

Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear everywhere to avoid high-power beam (non-issue in LCLS-I) and to set energy apertures Injector and SC-linac not included here (APEX & CM-design) Try to keep BSC compatible with existing hardware (magnets, BPMs, etc), especially at dispersive locations Develop code for fast re-calculation of all BSC apertures with each MAD version (updated: 19JUN15) BSC PRD is out for review now (6/24/15, LCLSII-2.1-PR-0442)

BSC originally defined by Jim very reasonably as… Start with  16-   apertures Add energy apertures based on 300 pC (see Table 1) Include additional aperture requirements (steering, mismatch errors, RF cavity trip, beam chirp, etc) Compare BSC’s to apertures of existing components When necessary, re-evaluate BSC, or find/build new components to match apertures where necessary Defining the BSC

Betatron BSC (i.e., a monochromatic beam) …along the lines developed by Jim Use a conservative emittance of  n = 1  m. BSC apertures are  16-times the rms beam size,  . Allow a worst-case beta-mismatch, f   (  = f    ). Add steering clearance:  x =  2 mm (  1 mm in FEL). Betatron BSC full diameter, D , for an accelerator component is: Example: f   2,    50 m,  n  1  m,  mc   100 MeV,  x  4 mm  BSC full-width is 27 mm (minimum here). 

X Y ID X Y Two geometries to consider… Cylindrical or Rectangular BSC If aperture is cylindrical, such as quadrupole magnets, then the ID is: If rectangular, such as dipole magnets, then BSC is rectangle based on X and Y values.

Full Energy Widths at 300 pC At laser heater (100 MeV) At BC1 exit (250 MeV) At BC2 exit (1.6 GeV) At dog-leg-1 (4.0 GeV) At HXR or SXR und. entrance (4.0 GeV) 0.6% 12% 3.6% 1.6% 1.0%

Energy Apertures Start with the full “core energy width” (prev. slide) for each area Allow a possible energy chirp over e  bunch (beyond nominal) Add a possible energy-vernier scan capability (only after linac) Add a max. FEL energy loss in main dump line (after undulators) Add energy jitter (  4-times the expected rms) for each location Add a possible single RF cavity trip (but not in L0 or L1 linacs) Add a worst-case dispersion error of |  |/|  0 | = 1.25 Defined using the following recipe:

Energy Aperture Budget

Overall Beam Stay-Clear The two BSC components (“betatron” and “energy” apertures) are added linearly (more conservative). A minimum BSC is set for each area (Table 2), including the two S-band RF deflectors in the off-axis diagnostic line. Also must include adequate apertures for X-band RF deflectors in main dump line (see next slide)…

RF Deflector Beam Stay-Clear in Dump Line X-band (11.4 GHz) RF deflector installed after each FEL for time-resolved e  and photon diagnostics Deflector streaks and kicks the beam horizontally Requires large hor. apertures, especially near main dump FEL RF deflector Main Dump screen Stay-clear

Beam Stay-Clear Results – Linac SC-linac and bunch compressors BC2 BC1 LH L3-end

Beam Stay-Clear Results – Diag. Line Off-axis diagnostic line (DIAG0) TCAVX TCAVY Kicker

Beam Stay-Clear Results – Bypass-SXR Linac extension through to SXR dump Spreader Dog-leg-1Dog-leg-2 TCX01

Beam Stay-Clear Results – Bypass-HXR Linac extension through to HXR dump spreader Dog-leg-1 TCX01

Beam Stay-Clear Results – BSY Dump Kicker to BSY dump