Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
OCAMS Orbital Communications Adapter (OCA) Management System NASA/JSC/DO/Tim Hall Aug 2011.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Michel Denis, ExoMars Ground Segment Manager, HSO-OPM
(4.4) Internet Protocols Layered approach to Internet Software 1.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Software for Spacecraft What do spacecraft need to do when they’re 1 million miles from home?
OSI Model 7 Layers 7. Application Layer 6. Presentation Layer
Data Networking Fundamentals Unit 7 7/2/ Modified by: Brierley.
The OSI Model A layered framework for the design of network systems that allows communication across all types of computer systems regardless of their.
Lecture slides prepared for “Business Data Communications”, 7/e, by William Stallings and Tom Case, Chapter 8 “TCP/IP”.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
OSI Model. Open Systems Interconnection (OSI) is a set of internationally recognized, non-proprietary standards for networking and for operating system.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
Design of a Science Operations Centre for the ExoMars 2016 Trace Gas Orbiter Mission A. Cardesin Moinelo, D. Frew, L. Metcalfe, P. Martin, N. Manaud, A.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Networks – Network Architecture Network architecture is specification of design principles (including data formats and procedures) for creating a network.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Managed by UT-Battelle for the Department of Energy 1 Integrated Catalogue (ICAT) Auto Update System Presented by Jessica Feng Research Alliance in Math.
SISG - SSI ADD Service, Physical, and Protocol View Document Figures Ver 0.4, 2 Sept 09 Peter Shames, et al.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Generic Instrument Processing Facility Interface Specifications A. BuongiornoFrascati 12 /10/2012 ESA EOP-GS 1.
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
OS Services And Networking Support Juan Wang Qi Pan Department of Computer Science Southeastern University August 1999.
Challenger Learning Center Rendezvous With a Comet The Communications Team: Alex and Lauren.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
2-1 A Federation of Information Systems. 2-2 Information System Applications.
Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.
SPICE Production at ESTEC April SPICE Production at ESTEC 2 Overview SPK/CK production SCLK production FK and IKs production Other Kernels.
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.
“DDSinterface” a software interface between Consert EGSE and Rosetta Data Delivery System (DDS)
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger.
Page No. 1 Overview Kelvin Nichols Payload Operations and Integration Center EO50 SSCN Delay Tolerant Networking (DTN)
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
Mission Planning Concepts
The road to the first E2E tests
Principles of Information Systems Eighth Edition
RSOC Overview at SWT #26, 11/12 June 2009
Adopting the Python language for On-board Programmable Payload Autonomy Steven Doran 2016 Flight Software Workshop 12/14/2016.
I&T&C Organization Chart
SPICE, el servicio de información geométrica para ciencias planetarias
Data Flows in ACTRIS: Considerations for Planning the Future
Geometric information for VIRTIS-M data
Service, Physical, and Protocol View Document Figures
Rosetta Science Ground Segment Overview
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
Data Networking Fundamentals
Tiers vs. Layers.
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
OSI Reference Model Unit II
Integration & Test Instrument Operations Coordination
OSI Model 7 Layers 7. Application Layer 6. Presentation Layer
Presentation transcript:

Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC Interfaces during commissioning, cruise, fly bys – data flow Interfaces during commissioning, cruise, fly bys – Implementation Interfaces during comet phase – data flow Interfaces during comet phase - Implementation Presented at the Rosetta Science Operations Working Group Meeting (SOWG) #5, 11 Jul 2001

Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys - Data flow PI Teams EPS (tbd) Sequence Builder Data Analyst Management Ground Segment Management Data Archiving / Handling Science Operations Team RMOC Science communications, databases FCPs Pointing modes Flight dyn. Request files Stations and Facilities Management Data Systems Flight Control Procedures, execution times DDS Request Raw data Experimenter teams Flight Control Procedures Experiment Data Analysis Overall Planning Project Scientist Approval Raw data, auxiliary data, h/k Raw data Flight Dynamics Team (FD) Flight Control Team (FCT) Plans Telemetry Command history Trajectory, attitude Cal. data

Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys Implementation - I Experiment User Manuals Experimenter supports FCP execution RMOC executes FCPs Project Scientist approves uplink

Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys Implementation - II  Experimenters writes Flight Control Procedures, documented in User Manual  RMOC translates them to ESOC procedures  ESOC executes them under “control” of the Experimenter  Science Operations Team puts together consolidated plan in advance of mission phase, interactively changes plans  Project Scientist approves operations and changes  Data can be retrieved from the DDS  If a Payload Operation Request (POR) file is required, it will be transferred as in comet phase

Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Logical PI Teams EPS (tbd) Sequence Builder Data Analyst SOC Management Ground Segment Management Data Archiving / Handling RSOC RMOC Science communications, databases POR File SPLs, pointing, trajectory Flight dyn. Request files Stations and Facilities Management Data Systems Operational Requests, Pointing Requests Lander Operations Plan DDS Request Raw data Experimenter teams Experiment Sequence Building Experiment Data Analysis Timeline Integration Science Sequence Assembly Raw data, auxiliary data, h/k Raw data Flight Dynamics Team (FD) Flight Control Team (FCT) Plans Telemetry Command history Trajectory, attitude Cal. data Science ops planning

Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Implementation RSOC Science Planning System PI 1 computer PI 2 computer Lander Team computer DDS Relay Lan Ops Lan RSOC FTS RSDB MCS with archive Flight Dynamics System Router Physical interfaces 2001 Jul 08, dvk Firewall

Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Implementation - II  The RSOC FTS (File Transfer System) is located at ESOC within the Relay Lan.  It will be a cold-redundant SUN workstation, maintained 24 h per day  If a file is transferred, the DDS recognises from the file name whether it is for the RSOC FTS. It will forward it to that machine  On the RSOC FTS, incoming files are checked automatically (name, syntax check for OIOR/LOR files) and acknowledged  The Science Operations Team will transfer files via secure ftp to its planning system Thus:  There is only one physical interface for the Experimenter, the DDS at ESOC  Security and reliability are ensured