Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.

Slides:



Advertisements
Similar presentations
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Outlook for the Requirements of the Nuclear Power Plant Irradiation Test in China SONG DANRONG Nuclear Power Institute of China.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
Study of a new high power spallation target concept
Neutronics & RP Issues Neutronics & RP Issues nToF Review 14 th February 2008 CERN AB/ATB/EET n_TOF Team.
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Towards a modified n_TOF Facility and Increased Radiation Safety Towards a modified n_TOF Facility and Increased Radiation Safety ATC/ABOC Days, 21 st.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Beam line Experiment area SC magnet Pion production target
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
N_TOF commissioning INTC-P-249 Spokespersons: J.L.Tain, V.Vlachoudis Contactperson: V.Vlachoudis th Nov 2009 for the n_TOF collaboration.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Status of n_TOF Facility
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
CERN’s n_TOF neutron spallation target operating experience and future consolidation plans M. Calviani (CERN) 6 th High Power Targetry Workshop Oxford,
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
1 Advantages of combining gamma scanning techniques and 3D dose simulation in dose optimisation problems. F.Vermeersch IDPBW, Nuclear Studies Occupational.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
SPS High Energy LSS5 Thermal contact & cooling aspects
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Heating and radiological
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
The n_TOF Facility Today
n_TOF Phase-2 Operation in 2009
Target and Horn status report
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Extract from today’s talk given to DCB
C. Adorisio Extracted from the presentation given at
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
n_TOF Target #3 Baseline Design
Presentation transcript:

Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of the previous EPR  Old Target removal and Investigation  Pitting corrosion mechanism study  Solution studied for the New Target Design  Feasibility  Conclusions Second n_TOF External Panel Review, CERN, 14 February 2008

The n_TOF Facility

Neutron production by spallation on Pb using a 20 GeV/c proton beam  Energy eV to 250 MeV  Neutron Flux: 6.2´105 n/cm2/7x10 12 p  Flight path: m  Duty Cycle: < 1 %  Energy Resolution: 0.02 % at 1 keV 0.2 % at 1MeV  Intrinsic in-beam Contamination: Gammas 10%, 1 % at 100 MeV  Outside-beam Contamination: <10 -6 relative. Neutron yield of one 20 GeV/c proton in a 2x2x2 m lead block: ~600 neutrons

The n_TOF Facility main Parts  n_TOF Main Parts  The proton Line  The Target Area  The Flying path  The Sweeping Magnet  The Collimation  The Experimental Area  The Escape Line

Where are we standing: Facility running from Nov 2000 till Nov 2004 Integrated number of protons on target over the running period: ~6x10 19 protons Detection of unusual radioactivity in the water filters (sieves)

Where are we standing: Radioactivity in the sieves

Where are we standing: After the end of the Run in November 2004, the Facility has been stopped and the restart conditioned by the understanding of the problem. There is a request from the CERN management to study a solution to restart the Facility in 2008.

Last actions toward the restart of the Facility  Presentation to the First External Panel Review: done, report received.  Target removal: done ( ).  Study of the mechanism of the target corrosion: done  Simulations of the Target Activation: done  Simulations of the Pit and Pool Activation: done  Dose rate measurement of the old Target: done  Dose rate measurement in the Access Pit: done  Target sample taking: done  Target visual Inspection & photography: done.  Target laser surface inspection: done.  Pit & Pool visual inspection (web camera): done.  FLUKA Simulations for the geometry of the New Target: in progress.  Proposal for the New Target & Cooling System design: in progress.  Pre-design study for the target area ventilation: in progress.  Preparation of the Safety File: in progress.  Presentation to the Second External Panel Review

Resume of the previous EPR Assuming the following points satisfied: 1. The control of air temperature and humidity in the Target Area. 2. The minimization and control of the released air to the environment. 3. The upgrade of the target water cooling circuit (containment) 4. The cleaning to remove the activity from the walls in the existing piping. 5. The control of the water chemistry: conductivity, pH, oxygen content, flow, pressure and temperature. 6. The installation of a second ion exchanger. 7. The use of metal seal in the heat exchanger. 8. The Cooling circuit infrastructure design made to cope with the possible increase of radioactivity in the water. 9. The implementation of all measures minimizing the target pitting corrosion. 10. The preparation of a feasibility study with a detailed safety assessment. 11. The organization of a documented HAZOP study to demonstrate the ability of the Facility to cope with a range of accident conditions. The restart of the Facility is justified

Old Target removal and Investigation Remarks on the Target Visual Inspection Considering that: Considering that:  There is a hole in the proton impact region due to pitting corrosion.  The modular assembly of separate lead blocks presents a mechanical instability.  The target shape don’t allow the correct water flow on the entrance face.  The target dimension could be reduced without significant reduction of the neutron flux. The reuse of the existing Target is excluded.

Old Target removal and Investigation Laser Surface Survey (1)

Old Target removal and Investigation Laser Surface Survey (2)

Old Target removal and Investigation Laser Surface Survey (3) The deformation in the central block indicates a creep effect. This aspect of the lead behavior will be carefully estimated in the new target design.

Old Target removal and Investigation Remarks on the Pool Visual Inspection Considering that:  There are contaminated oxide deposit on the floor and on the walls.  There are signs of corrosion on the proton entrance window.  The upgrade of the existing Cooling System is mandatory to cope with the unexpected release of radioactivity into the cooling plant and to maintain future contamination within reasonable limits. The reuse of the existing Cooling Circuit is not envisaged

Pitting corrosion mechanism study Evaluation of the status irradiated n_TOF Pb spallation target CERN and CIEMAT D. Cano-Ott et al. [1] [1] [1]

Pitting corrosion mechanism study (1)

Pitting corrosion mechanism study (2)

Pitting corrosion mechanism study (3)

Pitting corrosion mechanism study (4)

Pitting corrosion mechanism study Conclusions

Acquired Experience The use of lead directly cooled by water remains a good choice. The old target design is showing some weak points:  Insufficient cooling, in particular at the hottest spots (proton entrance lead surface).  Mechanical instability due to non monolithic construction.  Lack of chemical stabilization of the cooling water, enhancing the probability of pitting corrosion. By implementing the following points:  Provide a water flow on the proton entrance surface to maintain the local temperature lower than the boiling point.  Adopt a monolithic structure.  Monitor and Control the water chemistry: - oxygen sensor & degassing equipment in case of ultra pure water solution - oxygen sensor & pH control in case of bicarbonate based solution.

Strategies to restart the Facility in 2008 The following options could be envisaged for the restart: 1.Upgrading the existing cooling System and installation of a Target similar to the old one. 2.Dismantling of the Target Area, installation of a new Target Assembly and Cooling System. 3.Installation of a new Target Assembly via the shaft cooled by a new Cooling System.

Solution 1:Upgrading the cooling System, use a Target similar to the old one

The following points should be considered:  The status of the Pool and of the entrance and exit windows is not clearly assessed.  There are concerns on the life expectance of the windows (fatigue).  The use of the existing Pool is conditioned to the decontamination.  The upgrade of the cooling circuit needs interventions in TT2A [2].These interventions could lead to the practical rebuilding of the cooling system (water containment, heat exchanger, pumps, water quality monitor and control, etc.).  The access in the tunnel is limited to the shut-down period (the access doors to TT2A are in the PS interlock chain).  There are access restrictions during the run to monitor and control the chemistry of the cooling water. This solution can’t be achieved in 2008 due to the access restriction in the TT2-A tunnel. [2]

Considering that: YThe access to the target area in the TT2A tunnel requires the dismantling of the shielding all along the vacuum tube [3]. YThe last part of the shielding near the Target area is activated, requiring a high “cost” in terms of received dose for personnel (5 to 10 mSv). YThe access in the tunnel is limited to the shut-down period (the access doors to TT2A are in the PS interlock chain). YThe upgrade of the cooling circuit needs interventions in TT2A [2]. YThe presence of Radioprotection technicians in the tunnel is needed over a long period of time. YThe design of a new Target (and cooling?) is in any way needed. This solution has no chances to be implemented in 2008 and is not satisfying the ALARA Principle. [2] [3] Solution 2: Solution 2: Dismantling of the Target Area & construction of a new Target Assembly

Solution 3: New Target Design Installation via the shaft [4] The following options were studied [4] to verify the possibility to use alternative solutions for the new target design:

New Target Design: Activity and Dose rate comparison Ø=60 cm After 3 years of cooling

New Target Design: Neutron fluence losses

New Target Design:Neutron fluence losses Ratio of the neutron flux Old/New Ta Target

New Target Design:Neutron fluence losses Ratio Old/New for various lead diameters

New Target Design: Tantalum cylinder surrounded by lead, air cooled. Advantages: all the water related problems are avoided (containment, activation, decontamination,...) TantalumRod Ø= 20 cm L= 30 cm Density = ~157 kg proton beam Pb (casted) Ta rod Lead Ø ext = 55 cm Ø min = 32 cm L= 50 cm Density = ~1074 kg ~1230 kg tot Air IN Air OUT Air distribution structure Existing Pool L=30 cm L=20 cm Pb (casted) Moderator Disadvantages:  neutron flux reduction  Increased activation (handling and decommissioning)  Very high air flux (>700 m 3 /h)  Complex structure needed to distribute the air flux  Tantalum purchasing (cost & time)  Completely new design (no acquired experience)  Moderation (solid?, liquid?)

New Target Design: Residual dose rates [mSv/h] for the Ta cylinder air cooled.

proton beam Lead Volume = 100 l, Density = ~1130 kg Moderator (5 cm) Water IN Water OUT Water distribution structure Existing Pool (Containment Vessel) L=35 cm Quick locks Tap New Target Design: Cylindrical Lead Target, water cooled New Pressurized Vessel Air IN Pb (casted) Water Tank (Storage) Shielding Ø=60 cm

New Target Design: Pb Target Ø=60 cm Residual Dose rate

Strategy to restart the Facility in 2008 Considering that:  The acquired experience with the old target is showing the ability of lead to work without serious mechanical damages over a large number of cycles (~5.2x10 19 p).  The mechanism of the pitting corrosion has been studied and understood.  By building a new Cooling Circuit the safety requirements suggested by the External Panel could be implemented in agreement with the CERN Safety Rules.  The use of lead presents clear advantages in terms of reduced residual dose and self shielding.  The delivery in 2008 is mandatory The installation via the shaft of a new lead target cooled by pressurized water in the volume defined by the existing Pool is the solution under study

Summary of the Envisaged improvements Design criteria for the Facility up-grade:  The use of a pressurized water cooling circuit  The double containment in the whole cooling circuit  The infrastructure to collect the contaminated water  The water flow control on the proton impact area  The continuous monitoring and control of the water chemistry  The proton beam optimization (enlargement of the beam impact crossection)  The use of a Pb alloy to boost the mechanical characteristics  Reduction of the target total mass (lead and supports) Items discussed in the following presentations

Feasibility: Installation via the shaft

Feasibility Detailed Pit Survey Measurments

Feasibility: View of the existing Pool Second containment for the new Target Assembly Third containment for the new Target Assembly

Feasibility: Pit lay-out  The Cooling Station is equipped with a closed Retention Vessel.  The piping between the Cooling Station and the New target Vessel is double-wall.  Any water leak in the Pit is collected in the old Pool via the Envelope (funnel).  The water collected in the Pool goes by gravity in an external accessible closed vessel.  In terms of dose rate and accessibility, the access to the connecting area in the pit during the installation and the decommissioning phase is possible.

Quick connections Pump Heat Exchanger Main Water Tank (in the Cooling Station) Water Tank (in the Service Gallery) Normal Working Condition Replacement 90% of the water (without Target removal) Emptying of the Target Container (Decommissioning) Cooling Station Scheme for Cooling water replacement and Decommissioning Shielding Tap (remotely operated) Air Lifting Air Compressor

Feasibility: Time-Scale For the Cooling and Ventilation the project phase consists on the choice of standard elements based on the specifications defined by the Target Assembly study. This phase is short compared to the installation of the various elements requiring hardware interventions and civil engineering works on the field. A delay of 6 months for the project and installation seems possible. For the Target Assembly the situation is opposite, in fact the design phase is requiring many simulations for the neutronics, thermal behavior, material fatigue, mechanics... Due to short installation time needed, 3 months design plus 4 months construction seems possible. Main items considered to evaluate the time-scale: 1.The Target Cooling & Target Area Ventilation 2.The Target Assembly Assuming a start in a “well defined direction” end of February 2008, the possibility to have a target ready 1st October 2008 is certainly challenging but (hopefully) realistic.

 An important combined effort has been done during the last months to evaluate the status of the old Pb target.  Its status is well understood and a consensus on the mechanism responsible for the target present situation has been reached between CERN and the Collaboration.  CERN and the Collaboration are preparing an action plan to have a new target ready for running in  A complete and detailed engineering study is in progress.  The FLUKA simulations for the new geometry is in progress.  The Safety File preparation is in progress.  A HAZOP will be organized to show that the Facility can cope with a range of accident conditions. Conclusions