Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Flatness, Parallelism, & Profile
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
0 LAT Coordinate System LAT-TD (it’s in CyberDocs) Purpose: The hardware and software designs need a clear, consistent and universally accepted.
1 Laser Beam Coherence Purpose: To determine the frequency separation between the axial modes of a He-Ne Laser All sources of light, including lasers,
Understanding Flatness, Parallelism, & Profile in Calypso Last Updated: 9/12/2014Understanding Flatness, Parallelism, & Profile in Calypso1.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
Sept G. Zech, Iterative alignment, PHYSTAT 2003, SLAC. 1 A simple iterative alignment method using gradient descending minimum search G. Zech and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Bill Atwood - July 2002 GLAS T 1 A Kalman Filter for GLAST What is a Kalman Filter and how does it work. Overview of Implementation in GLAST Validation.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
Geometry of the Tracker in the Flight Instrument The following slides present an overview of the geometry of the tracker. Dimensions corresponding to constants.
Hexagonal Pyramid cut at an angle #1
Pion test beam from KEK: momentum studies Data provided by Toho group: 2512 beam tracks D. Duchesneau April 27 th 2011 Track  x Track  y Base track positions.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Dimensioning and Tolerancing
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
Wall survey: With and without TT7. The wall targets are hybrid targets made of precise uncoded targets (the pin targets) which enter in the hole of the.
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
GLAST:Gamma Ray Large Area Telescope
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
SCARA – Forward Kinematics
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
Detector Monte-Carlo ● Goal: Develop software tools to: – Model detector performance – Study background issues – Calculate event rates – Determine feasibility.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Louis Nicolas – LPHE-EPFL T-Alignment: Track Selection December 11, 2006 Track Selection for T-Alignment studies Louis Nicolas EPFL Monday Seminar December.
Secondary Vertex reconstruction for the D + Elena Bruna University of Torino ALICE Physics Week Erice, Dec. 6 th 2005.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
Adam Blake, June 9 th Results Quick Review Look at Some Data In Depth Look at One Anomalous Event Conclusion.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
LATLAT Beam Test Workshop May 17th GLAST Program Beam Test Workshop The c alibration strategy of the magnetic spectrometer
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Michele Faucci Giannelli
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Planar distortions for SCT Barrel Modules
Future Physics at HERMES
Intra-Tower Tracker Alignment Instrument Analysis Workshop 4
Beam Gas Vertex – Beam monitor
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
Track Finding.
DT Local Reconstruction on CRAFT data
GLAST Large Area Telescope:
Determining the horizontal and vertical trace of the line
Orthogonal Drawings Orthogonal drawings are 2d drawings of 3d objects created by orthographic projection. Orthogonal: intersecting or lying at right angles.
Imaging crystals with TKR
Isometric Projection Drawing
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez2 Ladder alignment on a tray MCM side The ladders alignment is measured with a CMM with optical probe (3 points per ladder) in G&A. The small dispersion of the data (  =18  m, planarity ~ 0.1mm) allows to consider the 4 ladders of a tray plane as a single detector. We do not need to introduce ladder per ladder alignment corrections

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez3 Tower B ladders alignment

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez4 Tray thickness SSD plane Pins plane The tray thickness is also measured. The results are well within the design specs * Distance from the SSD to the alignment pins on the thermal boss

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez5 Software tray alignment: rotation  x  y  A parallelism error generates an error which is proportional to the orthogonal coordinate (v) of the event. v has to be extrapolated from the fitted 3- dimensional track. The fit of the profile histogram gives immediately the rotation tan(  ) of the plane (parameter p1). p0 again is a measure horizontal shift, but here at v=0 (the preceeding methods give the shift at the center of the wafer). residual/mm orth. coordinate/mm profile histogram orth. coordinate/mm residual/mm

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez6 Software tray alignment: vertical Theoretical SSD height True SSD height   x  tg(   z zz In similar way to the horizontal case, it is possible to determine the relative height in the tower of a SSD plane studying the residual distribution as a function of the incident angle  of the tracks. The fit of the profile histogram gives immediately the vertical shift (parameter p1), and once again the horizontal (p0). cot(  ) profile histogram cot(  ) residual/mm

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez7 Software tray alignment: horizontal A shift of a plane with respect to the other ones generates a residual distribution not centered around 0 (measured points - reconstructed trajectory). An iterative algorithm allows to align the detectors so that all the residual distributions are 0 centered. shift before after

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez8 Coordinate shifts X The tower jigs aligns the pins that have been used to align the ladders (the best reference) When the pins on the alignment wall of the tower jig are removed, the sidewalls partially realign the trays to their external dimensions with a max alignment loss ~0.1mm Sidewalls assy Vibe test TV test Sidewall removal Shipment to SLAC

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez9 Coordiante shifts Y These trays are aligned on the tower jig on a structural closeout. The relative alignment of the ladders is poorer, but the max loss of alignment after sidewalls assembly is only 0.05mm Reference wall of the tower jig

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez10 Ladder parallelism Parallelism for X trays ± 0.1mm Parallelism for Y trays ± 0.2mm except for layer Y2 (light tray 016, top side) with an anomalous parallelism of 0.45mm The general difference in parallelism between X and Y trays can be related with the tower jig. No explanation for the Y2 anomalous parallelism.

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez11 Coordiante shifts Z The software determination of the tray position in Z is poor as shown by the differential plot Z error ~±0.2mm

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez12 Tower B results

Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez13 Conclusions Good data! Good alignment and parallelism of the trays, typical values in the ±0.2mm range over the whole tower Very good mechanical stability: limited alignment loss after sidewalls assy no alignment loss after vibe, thermo-vacuum, a single sidewall dismounting and shipment to SLAC Tower B data are slightly better than tower A data