P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.

Slides:



Advertisements
Similar presentations
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Advertisements

P14421:Smart PV Panel Team Leader: Bobby Jones Sean Kitko Alicia Oswald Danielle Howe Chris Torbitt.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
MSD-I Project Review Modular Motion Tracking Sensors 1.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Week3: The Project Management Process Groups 1 Prof. Ahmed Sameh Professor of Computer Sc. And Information Systems.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
May 21st, 2012 Component Environmental Test Chamber Team Members Advisors Peter AdamThong Vo Dr. Robert Daasch - PSU Jeff HughesPhong Ngo Justin Riel -
Business Analysis and Essential Competencies
Management & Development of Complex Projects Course Code - 706
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Maintenance and Support Week 15 CMIS570. User Training Need to consider the same 2 groups: End users Use the system to achieve the business purpose Creating,
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
KAITLIN PERANSKI: IE, PROJECT MANAGER JEREMY BERKE: EE, SCRIBE/LEAD SOFTWARE CHRIS CAPORALE: EE, LEAD HARDWARE SPENCER WASILEWSKI: ME, MODELING/MACHINIST.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
Develop Project Charter
Request for Proposal (RFP)
Quick Start Guide: Filters Learn about: 1.What filters Are & Their Functionality 2.How to Create A Filter.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Labcheck Next Generation Quick Start Guide Filters.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
MSD Total Supplier Performance and Inventory Control
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
Team-Based Development ISYS321 Managing the Information Systems Project.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
 Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding electrical components dependent on varying mechanical.
Motor Assisted Wheelchair Design Review 10/01/15.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Baja Hybrid Drivetrain Design P14224
Request for Proposal (RFP)
HEMODYNAMIC SIMULATOR II P09026
P15661 Reciprocating Friction Tester Base Subsystem
Tub Lift Rev. 2 Dom Group
P17452 Dresser-Rand System Health Monitor System Level Design Review
P16680: AATech Universal Oil and Bag System
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Systems Level Design Review
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Presentation transcript:

P16680: AATech Universal Oil and Bag System System Design Review 9/29/15

Team P16680 Philip Couturier - Controls Systems (EE) Samantha Orlando - Systems Design (ME) Jessica Reed - Purchasing (ME) Maria King - Project Lead (ISE) Nicole Anklam - Systems Integration (EE) Bryce Mowers - Manufacturing (ME) 2 P16680

System Design Review Objectives Confirm that all system goals are addressed in an acceptable manner Inform stakeholders of current project status Update engineering requirements if needed Review action items for team & customer 3 P16680

Agenda Use Scenario Engineering Requirements Constraints Functional Decomposition Systems Architecture Benchmarking Concept Generation & Selection Cost 4 P16680 Engineering Analysis Test Plan Risk Assessment Project Plan Lessons Learned Q & A Action Item Recap

Updated Use Scenario 5 P16680

Engineering Requirements 6 P16680

Constraints 7 P16680

Functional Decomposition 8 P16680

System Architecture 9 P16680

Benchmarking Pumps Sensors Barcode scanners Microcontrollers Drain apparatus Height of table Door handles Oil lines 10 P16680

Morphological Chart 11 P16680

Concept Generation Three Potential Concepts Manual Concept Automated Concept Feasible Automated Concept 12 P16680

Concept Selection Selection Criteria: Ease of use / Ease of troubleshooting Ergonomic Can be completed in two semesters Durable Fast cycle time Size (small preferred) Organized Automated Adaptable 13 P16680

Concept Selection - : Less likely to meet criteria + : More likely to meet criteria s : Equally likely to meet criteria 14 P16680

Final Concept Selection Combination of best components from each system concept Different fixture for each model PLC/HMI display with LED lights Manual Door Slide with electric door interlock Locate and secure nozzle using a yoke plate (previous MSD team) Manual input with a scanner Electric Centrifugal pump to circulate oil Internal reservoir to store oil Gravity flow to return oil to reservoir 15 P16680

Cost Budget: $10,000 Estimated costs of major components based on benchmarking: HMI/PLC - $800 Sensors - $250 Door Lock - $50 Pump - $500 Door handles - $10 Oil lines - $80 Total: $1, P16680

Engineering Analysis How many fixtures are needed/What parts need to change? Prototype different options How long will a changeover take? Prototype a fixture and time a mock changeover Will the pump provide appropriate pressure and duration? Benchmark Which type of door lock ensure safety and eliminate leaking? Benchmark Will all of the sensors be compatible with the PLC? Benchmark 17 P16680

Test Plan ● Pump--verify the pressure at different points ● Pneumatics--verify cylinder actuation and verify no bleed-off ● Pressure sensors--verify they meet specs ● Fixturing alignment--verify part fit-up with oil injector ● Cycle time--different parts and change-over ● Door lock--verify that the door will not open during operation ● Noise level--verify less than 50dB ● Scanner--verify communication with PLC and pulls up correct parameters ● LED and HMI--verify the systems output the correct data at the correct time ● User interface--verify intuitive controls ● System Control--verify system runs correct parameters and operates as planned 18 P16680

Risk Assessment 19 P16680

Project Plan Gantt Chart thru 9/29 Rest of Project Next 3 weeks 20 P16680

Lessons Learned Have a method to track risks at a high level Project schedule may vary from MSD schedule Have document owners Practice design review with your guide 21 P16680

Questions? 22 P16680

From previous review Receive oil requirements Receive copy of software/computer Receive previous MSD fixture New action items Add oil filter? Add emergency stop? 23 P16680 Action Item Recap