Intraday Trading March 2011. RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Creating a Single Electricity Market Across Borders: Pitfalls, Constraints, and Opportunities Paul K Gorecki Economic & Social Research Institute & Trinity.
Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, am – 13:00 pm Conference call number: , pin:
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
FUI Electricity Regional Initiative Stakeholder Group Meeting Update on Single Electricity Market Michael G Tutty Commissioner, CER 4 July 2008.
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
SEM – One Year On Liam Ryan, Market Operations Manager.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
A Sustainable Future Powered by Electricity DS3 Workshop EAI Perspectives 14 th October 2013.
European Commission views on intra-day and balancing markets
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
THINK EFFICIENCY Administration Review Customer & Support Services Scrutiny Committee 24 th November 2008.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
SEM Regional Integration FUI Stakeholder Group November 2009.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Interconnector trading in SEM 7th June 2007
Presentation transcript:

Intraday Trading March 2011

RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications Committee established a Working Group, which has met on seven occasions, in addition to a number of conference calls. Widespread involvement from across the industry Agreement of working assumptions on all major design components The key output is the High Level Design Summary, which has been presented to and unanimously recommended for further development by the Modifications Committee and has been provided to the SEM Committee. Process

No major change to the market design The design process has been aware of wider considerations (including Day Ahead Market/Market Coupling, Scheduling and Dispatch, Review of CPM and Facilitation of Renewables). The SEM will continue to evolve. The process has sought to preserve flexibility in the design to accommodate future possible market changes. Assumptions

Proposed SEM Intra-Day Trading Design: Three Gate Windows / Trading Windows Start Overlap Opt’n Period Trading Day - 1Trading Day Gate Window Closure (GWC) EA1 Gate Window Opening (GWO) e.g. as per current GWC EA2 GWO GWC WD1 GWO GATE WINDOW 10:00 TD-29 to 09:30 TD-1 GATE WINDOW 09:30 TD-1 to 11:30 TD-1 GATE WINDOW 11:30 TD-1 to 08:00 TD EA1 Trading Window EA2 Trading Window WD1 Trading Window Ending Overlap Opt’n Period Ending Overlap Opt’n Period Ending Overlap Opt’n Period EA1 Interconnector Unit trades fixed EA1 and EA2 Interconnector Unit trades fixed OPTIMISATION TIME HORIZON

Enhanced trading opportunities, recognising the value of explicit capacity auctions: SEM Intra-Day Trading Design: Trading and Settlement Unused Interconnector capacity from EA1 Trading Window can be utilised in subsequent Trading Windows. Superposition will allow the physical capacity of Interconnectors to be observed, whilst enabling trading in excess of the capacity in each direction (import, export). This provides opportunities to arbitrage and deliver price efficiencies. Settlement will continue to be Ex-Post, based on Dispatch and Generator Unit performance against Dispatch. No changes are proposed to settlement payments or charges.

SEM Intra-Day Trading Design: Impacts SEM Intra-Day Trading will deliver compliance and regulatory intent: Implementation in line with SEM Committee Decision on Intra-Day Trading Compliance with EU Congestion Management Guidelines Opportunity for greater utilisation of infrastructure (Moyle and EWIC), closer to real time. Greater competition through increased trading opportunities (including superposition), with reduced trading risks (more opportunities to alter trading positions). Greater Generator Unit cost-reflective bidding (bringing market timelines closer to fuel purchase timelines). Agreed Credit Cover mechanisms, consistent with the original market principles, will be put in place.

TSO System Security Issues (1): Proposal TSOs requested that generator notice times be included in the market scheduler to allow for the production of a manageable Interconnector schedule Highlighted concerns over shorter timeframes for operation Participants requested modelling of impacts of notice times on SMP and constraints before agreeing to allow them to be included TSOs confirmed intra-day can progress without inclusion of notice times in the market schedule Requirement has been removed from the Intra-Day High Level Design TSOs propose that a test environment be developed to include notice times Test environment should be included in market design Not activated at intra-day go-live Study the effects of including notice times Cost is minimal but the value is very high