All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.

Slides:



Advertisements
Similar presentations
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Advertisements

FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt CalendarTime.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Lesson 4 Take it easy! 月 一月 - January 二月 - February 三月 - March 四月 - April 五月 - May 六月 - June 七月 - July 八月 - August 九月 - September 十月 - October 十一月.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Maintenance and Accelerator Support RHIC Start Up 12.
Maintenance and Accelerator Support RHIC StartUp10.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Maintenance and Accelerator Support RHIC Start Up 12.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Refurbished Booster RF John Reid October 24, 2012.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
MARS Taskforce RMS Update April 12, Initial Settlement As of April 5, 2011 Operating Date: March 29, 2011 AMC ESI ID Totals: 2,601,788 AMDG ESI.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
The Calendar.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PAC Meeting, December 12, Prebys 1 The Problem.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
CUB Outage Schedule April 21, 2006.
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel

Accelerator Operation Summary Calendar Week # 49 NuMI Weekly Integrated Intensity 7.75 E18 protons Beam Hours To NuMI hours BNB Weekly Integrated Intensity 4.34 E13 protons Beam Hours To BNB 0.7 hours NMuon Weekly Integrated Intensity 3.51 E16 protons Beam Hours To NMuon hours MTest Weekly Integrated Intensity 3.46 E14 protons Beam Hours To MTest 62.5 hours From : December 01, 2014 (0000 hours) To: December 08, 2014 (0000 hours)

Access Thursday – 8/21/14 Beam off at 0600 Keys available at 0700 Install Refurbished Booster RF Cavity Keys back at 1500 Other jobs that fit during cavity change Beam by beginning of evening shift

Fall Shutdown Intensity Reduction Plan Begins Saturday, August Main Injector will run $23 events instead of $2A events to NuMI (~80 KW reduction) Linac and Booster will meet program needs BNB should be unaffected SeaQuest will go down from 4 turns to 3 turns. Beam off Friday, September

2014 Shutdown Six full weeks into the shutdown – Linac and Booster Operational – Main Injector/Recycler startup today

2014 Shutdown NuMI Work – Beryllium vacuum window leak – Replace window – Horn Stripline maintenance – Work complete by Monday, October 27 th Switchyard Work – F1-F3 Vacuum recovery Once 46B work is done Impact MI for ~3 hours – Feeder 43 maintenance Scheduled for Saturday, October 25 th – G1 Stub Magnet Installation Magnet installed Leak check and final work – Feeder 46B work Prevents daytime operation of switchyard Expected to be complete by end of week Various Safety System Tests Meson Center Work – MC6D-3

Complex Status –Accelerators Monitoring systems during Kautz Road SubStation test Investigating issues, understanding, planning No plans to switch back to Master SubStation –Maybe in January 2015 –NuMI Making use of available beam –Switchyard Beam to experiments –SeaQuest Increased intensity and tuning –Meson Test Beam and tuning –Meson Center Safety System Tests MC6D polarity check Startup for checkout –BNB Performed more tests and analyzing data

Wilson Hall Outages Low Impact Tuesday, October 10 th – Power to Wilson Hall (Entire site except Main Injector, Muon Campus, and Village) – From – MSS off KRSS backfeed

Upcoming Issues In July 2015 we will need to power the entire site (except the village) off of Kautz Road SubStation (KRSS) for a year while operating –A new Master SubStation (MSS) will be built beside the old one –We have the capacity, but don’t know if we can run a Physics Program Possible noise on the lines Expect some problems with the Proton Source Planned on starting up from the shutdown with the site on KRSS to test Gives us some time to address problems –We don’t know what impact it may have on the rest of the Lab Will lights flicker? Will processes be sensitive to the Main Injector ramp?

When do we test? –Met with FESS and AD Departments to discuss possible test dates and impacts to schedules –Met with Division/Section power representatives to confirm test date –Locked in a test starting date – Tuesday, November 4 th –The duration of the test will depend on the results If we can operate, stay on KRSS for some time to allow the Lab to cycle through its normal power usage. Look for an agreeable time to switch back. If we cannot operate, switch back to using both substations after a few days, apply fixes, regroup, retest –Worked with FESS HV to put together a likely schedule for the rolling power outages across the lab while the power feeds are being configured

Rolling Outage Times (Estimated)

Wilson Hall Power Outages Saturday, October 18 th – Sunday, October 19 th – Power outage to Wilson Hall – 0700 – 1600 Sunday – Wilson Hall closed except authorized personnel – Remote Operations Center West (ROC West) available Saturday, November 8 st – Sunday, November 9 th – Rescheduled from Nov. 1 st & 2 nd – Power outage to Wilson Hall – 0700 – 1600 Sunday (Power back ~1300 Sunday) – Wilson Hall closed except authorized personnel – Remote Operations Center West (ROC West) available Friday, November 28 th – Saturday, November 29 th – Rescheduled from Oct. 20 th & 21 st – Power outage to Wilson Hall – 0700 – 1600 Saturday – Wilson Hall closed except authorized personnel – Remote Operations Center West (ROC West) available COMPLETED

Schedules and Links: Schedule can be accessed from the Operations Home Page – - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule – -