Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11, 2016 1.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Class 5 suggestions. Transmission Planning Class 5 supports implementation of a systematic, transparent process for developing and updating bus-level.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Energy Efficiency and Integrated Resource Planning at SMUD APPA Action Plan – EE and Planning May 8, 2008 Jim Tracy, CFO Jim Parks, EECR&D Manager Sacramento.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Western States Energy & Environment Symposium October 27, 2009.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
DNV GL © SAFER, SMARTER, GREENER DNV GL © Second Annual Utility of the Future Pulse Survey Key Findings 1 July 15, 2015 Presentation to C/CAG RMCP.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Thoughts on Order 1000 and Western Clean Energy Needs Doug Larson September 10, 2015.
ENVIRONMENTAL DATA IN TRANSMISSION PLANNING AUGUST 3, 2015 Carl Zichella DIRECTOR OF WESTERN TRANSMISSION.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SPSC Low Carbon Tool: Interim Status Report CREPC/SPSC meeting San Diego, CA October 5, 2012 Arne Olson.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT Thomas Carr Western Interstate Energy Board State-Provincial Steering Committee Update.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Overview Market Opportunities Market Challenges
RAC Implementation Status
TEPPC Review Task Force Meeting February 4-5, 2016
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Matthew Wittenstein Electricity Analyst, International Energy Agency
Reliability Assessment Committee Proposal TSS Meeting
Natural Gas Infrastructure Assessment
Reliability Assessment Committee
Scenario Scoping Process
Reliability Assessment Committee Reliability Workshop Priorities
Integration of Variable Generation Task Force (IVGTF): Status
WECC Staff Risk Prioritization
RAC Implementation Status
Context: Scenario Studies
Long Term Grid Assessment – Preparing for 2018 Studies
Context: Scenario Studies
Reliability Assessment Committee Reliability Workshop Priorities
Scenario Scoping Process
Use of EDWG Data by the LTPT
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
WECC Staff Risk Prioritization
Comments on New England Regional State Committee*
Presentation transcript:

Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,

Expectations in 5 Categories: – Committee Expectations – Product Expectations – Analysis Expectations – Model Expectations – Database Expectations 2

Committee Expectations – Inclusive: Participation of broad range of stakeholders that reflect diverse interests – Objective: Impartial and unbiased participation – Rigorous: Extremely thorough and accurate – Transparent: Visible and accessible information and business practices – Timely: Work finished quickly and in time to influence decision making 3

More Committee Expectations – Authoritative: Clear and concise conclusions and actionable recommendations – Efficient: Minimize wasted effort and expense – Funded: Money and staff for quality work 4

Product Expectations – Interconnection-wide Transmission Plans: Periodic independent assessments of future transmission needs (10-year and 20-year) – Reliability Reports: Periodic independent analysis of emerging reliability challenges – Policy Impact Reports: Timely independent analysis of the reliability implications of proposed regulations or public policies – Public Datasets: Common basis for consistent analysis by RPGs, utilities, and consultants 5

Analysis Expectations – Resource Adequacy Analysis: Evaluate interconnection-wide transmission and generation adequacy – Resource Alternatives: Consider wide-range of resource alternatives (e.g., EE, DR, etc.) – Sensitivity Analysis: Consider wide-range of forecast variables (e.g., loads, fuel prices, etc.) – “What-if” Scenarios: Consider wide-range of future economic and policy scenarios (e.g., high VER, high DER, etc.) 6

More Analysis Expectations – System Flexibility Analysis: Evaluate adequacy of power system ramping capability – System Stability Analysis: Evaluate interconnection-wide frequency response and voltage stability – Mitigation Analysis: Consider readily available mitigation options (e.g., synchronous condensers, smart inverters, etc.) 7

Model Expectations – Production Cost Modelling: To evaluate interconnection-wide generation and transmission adequacy and future trends in key variables (e.g. net load, CO 2 emissions, etc.) – Power Flow Modelling: To evaluate interconnection-wide frequency response and voltage stability – Round-Trip PCM-PFM Capability: Critical for internally consistent reliability analysis 8

Database Expectations – TEPPC is a User: Databases designed and developed for use by TEPPC and WECC – Public Users: Databases made available for public use by RPGs, researchers, and consultants – Rigorous: Thorough and accurate – Internally Consistent: Agreement between multiple assumptions across time and geography – Current: Updated in a timely fashion 9

Conclusion – Federal, state, and provincial policy-makers need an independent, objective, and transparent source of information and analysis to set energy policy goals and objectives in the Western Interconnection – In particular, policy-makers in the Western states and provinces place a high value on WECC’s interconnection-wide transmission planning because the process allows them to explore potential public policy options and test future “what-if” scenarios 10

Thank You Maury Galbraith Ext. 1 11