Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Radiation at accelerator laboratories Prompt radiation from the particle beam Beam induced radiation –Neutrons –Gammas –Synchrotron radiation Radiation.
Radiation Exposure, Dose and Relative Biological Effectiveness in Medicine Background Image:
Dose. Energy Gained Particles lose energy in matter. Eventually energy loss is due to ionization. An important measure is the amount of energy gained.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Radiation Environment at AWAKE Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
Higher Physics – Unit 3 3.5Dosimetry and Safety. Activity of Radiation The activity of a radioactive source is the average number of nuclei decaying per.
1 JASMIN Activation Experiments (T-972/993/994) Yoshimi Kasugai on behalf of JASMIN Activation team JASMIN Activation team Y. Kasugai, K. Oishi, H. Matsumura,
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
Study of a new high power spallation target concept
ELI-NP: the way ahead, March Anna Ferrari An overview of the shielding problems around high energy laser-accelerated beams Anna Ferrari Institute.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Radiation Protection during design, operation and dismantling of target areas Thomas Otto based on material from RP group.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Introduction From a neutron flux (> 20 MeV), with the Leaching model (Lessard) based on SBMS (Tables 1 and 2):
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Estimates of Radiation Levels in the Main Linac Tunnel and Beam Dump Caverns for the CLIC Design Study Sophie Mallows, Thomas Otto SATIF 10, S.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
210 Po Polonium 210 Alexander Litvinenko. Nuclear Radiation We will look at three types of nuclear radiation. RadiationSymbolRange alpha beta gamma α.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Update on radiation estimates for the CLIC Main and Drive beams Sophie Mallows, Thomas Otto CLIC OMPWG.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
CERN LEP3 MINI-WORKSHOP A brief recall of the LEP (radiation) history (out of my memory and published papers) Marco SILARI, DGS/RP.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
Dosimetry & Safety. Activity The term 'Activity' of a source describes the (in)stability of the atoms within a substance. One atom decaying per second.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
Radiation protection studies for the ESS Activation issues AD seminar Michał Jarosz , Lund.
1 SAFERIB EURISOL DS WP5 Progress Report CERN-RP: Mariano Menna, Jerôme Desarzens, Thomas Otto.
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Induced-activity experiment:
Radiation Protection Issues After 20 Years of LHC Operation
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
Studies on Energy Deposition and Radiation for the 4horn system
Radiation protection of Linac4 M. Silari Radiation Protection Group
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Preliminary Study – Radiation induced activity in a SB Target
CFS consideration on the Main Dump and around
T-489: Induced Activity and Residual Dose Rates
Radiation Safety Considerations
CEPC Radiation and Shielding
Presentation transcript:

Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported by the EC under Framework Programme 7 (sLHC-PP)

Beam specification PurposeBeam parameter (at E = 5GeV) Commissioning1.5 E14 protons pulse Hz 1 E20 protons over 5 months Annual Set-Up + Machine Development 2 weeks year hours week E14 protons pulse -1, 0.1 Hz 2.5 E19 protons year -1 Emergency abort1.5 E14 to 7.5 E15 protons s -1 for very short duration Thomas Otto SPL DumpSPL – ESS Workshop Lund, –

Dump Core: where the energy goes Originally developed for project X at Fermilab Layered graphite- tungsten core in a water-cooled aluminum-shell Power density (W cm -3 ) for 1.5 E13 protons s -1 Al CW air Thomas Otto SPL Dump3

Avg. Power density along beam axis (W cm -3 ) Assuming 1.5×10 14 protons/pulse and 1 pulse every 10s CORETUNGSTENIRON Thomas Otto SPL Dump4

Dump shield: containing the secondaries Tungsten shell Iron block External concrete layer Total size: L = 300 cm W = H = 200 cm W Fe Concrete Power density (W cm -3 ) for 1.5 E13 protons s -1 (different colour scale from last page)

Absorbed dose – does equipment survive ? Thomas Otto SPL DumpSPL – ESS Workshop Lund, – m upstream from dump, D ≈1 Gy h-1. Could be a problem for highly integrated electronics, semiconductor detrectors,...

And the public road ?? Dump location 17 Sv/h Dump Air Wall Earth Factor 10 m -1 7 m of earth will reduce H*(10) to 1.7  Sv h -1 Public area with low frequentation: H*(10) < 2.5  Sv h -1 required 7

Estimating activity and decay Monte-Carlo Radiation Transport + Nuclear Model Activation estimates Dose rate estimates (from decay of the radionuclides) Predictions depend critically on Quality of the nuclear model Representation of materials in the code The sensitivity of the predictions on these parameters is not always clear Take as a guideline, allow for safety factors Thomas Otto SPL Dump8SPL – ESS Workshop Lund, –

Maintenance in the tunnel Ambient dose equivalent rate H*(10) after the commissioning run (worst case) 2 m upstream from dump: H*(10) ≈ 100 mSv h -1 (1 day) ≈ 1 mSv h -1 (2 weeks) H*(10) (Sv h -1 ) After 1 day After 2 weeks Thomas Otto SPL Dump9SPL – ESS Workshop Lund, –

Tunnel wall and earth: protecting the environment Here, insertion in a 4.4 m wide tunnel 40 cm concrete wall Several metres of earth “Stars” (inelastic interactions), leading to activation of matter surrounding the dump Profile of activity concentration in earth: exponential decline 10

Soil activation Soluble radionuclides: H(100%) 22 Na (20%) Activation build-up and decay: In equilibrium: Production = Activity Conservative: equilibrium reached only after many years ! Thomas Otto SPL Dump

Conservative estimate of A eq Average proton intensity 2.5 E19 y -1 ≈ 8.13 E11 s -1 3 m “activation” layer around accelerator All activity diluted only in soil humidity (very conservative) Result for water sample: 3 H: 2.4 kBq l Na: 100 Bq l -1 Comparison with limits: Drinking water: 28 l exceed radioactivity limit Don’t source close to SPL Waste water: (ingress in tunnel) 3 H o.k. 22 Na: Factor 3 Covered by conservativism of model Thomas Otto SPL Dump12SPL – ESS Workshop Lund, –

Summary / Conclusions Dump for commissioning and set-up Dump core design “borrowed” from FNAL Absorbed dose and ambient dose rate from activation: avoid sensitive equipment a few metres upstream Critical operation: repair of dump cooling system Soil activation: Don’t source drinking water close to accelerator Water ingress (waste water o.k.) Public protected from stray radiation