Ceiling Fan Testing Facility Guidance Manual Rebecca Miller ICF Consulting E NERGY S TAR ® for Ceiling Fans

Slides:



Advertisements
Similar presentations
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Advertisements

PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
Session 321 An Implementation Strategy: Identifies who is responsible for which actions Identifies what funding mechanisms and other resources are available.
IAPD – The Maryland Experience. Involve FNS from the start – Guidance – Knowledge – Updates Communicate Often Approvals.
How to Release a RFP/RFQ AT FIRST 5 LA February 2, 2010.
Current Status of Public Participation in the EIA Process in China Seoul Korea, June 2007 By Zhao Xinfeng Appraisal Center for Environment and Engineering,
The A, B, C’s of Developing A Successful Program Delta Nu Chapter Retreat October 29, 2005 Presented by Dwayne J. Scott.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Software Project Transition Planning
CPA is a UKAS company Decision making process 2014 Seminars.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Product Ratings and Performance Certifications Presented by: Tom Gustafson, Hartzell Fan, Inc. AMCA International Technical Seminar 2009.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
1 ESFRI and the European Roadmap for Research Infrastructures Elena Righi European Commission OPTICON, Edinburgh, June 2006.
U.S. Department of the Interior U.S. Geological Survey USGS Survey Manual Policy Development and Status on Policy of Interest to the CDI Briefing to the.
Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September , 2002.
SPED Certification Program September 17, 2003 Houston, TX.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003.
Recordkeeping Forum - Wellington - 05/09/2007 Setting the Standard for Storage Patrick Power Government Recordkeeping Progamme Archives New Zealand.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Role of the Radionuclide Metrology Laboratory in organization of the interlaboratory comparisons for the measurement of activity (Becquerel) Maria Sahagia,
Document Retention: the Essentials John Lowe 2 June 2015.
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
ASSESSING PUBLIC PARTICIPATION IN FISCAL POLICY PROPOSED INDICATOR.
Certification and Validation Process NPIVP Workshop - March 03, 2006.
February 21, 2001TR CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
2010 Draft Transmission Expansion Plan (Local Planning Projects)
SAP QM Online Training by SAP QM Professional Trainers in India | UK | USA Online | classroom| Corporate Training | certifications | placements| support.
The Aarhus Convention Reporting Mechanism National Implementation Reports 2011 Experience and lessons learned Aphrodite Smagadi, Aarhus Convention secretariat.
The CED’s & DED’s role in the Tenure & Promotion of Agents
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
DCP Standard Operating Procedures / Procurement Overview
Session 2. revision of Handbooks, manuals and guidelines
Flooding Walkdown Guidance
QTI 2.1 Overview Pierre Gorissen,
IPPC first consultation 1 July to 30 September 2018
All Wales Safeguarding Procedures Review Project
CDRL E003 CFAT REPORT TEMPLATE
ETS Working Group, 5-6th June 2012
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
ISO Task Group Update Wayne Mabry.
Marine Environment and Water Industry Unit
Chapter 1: Introduction
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Draft note on Joint Action Plans
ISCED 2011 joint operational manual: Update
Standards Break Out Session
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
William J Wright ,co-chair TT-IP
Preparation of COM Decision SCG & Committee meeting February 9th, 2017
Status report from UNECE Task Force on Cyber Security &
UPDATE: Physical Security Guideline
Reaccreditation and Illinois
Accreditation Questionnaire Timeline
Why a „test phase“? Overview
Report on JDemetra+ documentation
Review plan of the nature reporting – update 6
Incremental Entry Capacity Release Methodology Statement
Region 4 Air Directors Spring Meeting May 20, 2015
EU Water Framework Directive
Accreditation: Working towards the self-study
Development of determination and verification manual (DVM)
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Final Version (after MS revision)
Presentation transcript:

Ceiling Fan Testing Facility Guidance Manual Rebecca Miller ICF Consulting E NERGY S TAR ® for Ceiling Fans

Reasons for the Manual Protects integrity of the test procedure Help interested parties build a testing facility (if necessary) Hunter Fan, ITS, and UL provided guidance and contents of manual Fluid document: new versions as specifications change Possible accreditation for lab and/or test?

Contents of Manual Chapters: –One: Introduction –Two: List of equipment & vendors –Three: Air delivery Room Construction and Preparation –Four: Equipment Set-Up and Test Procedure –Five: Calibration Approval and Reporting Test Results Lab pictures and blueprints Program documents and required reporting forms

Comments and Timeline Draft 1 available for download at: Deadline to comment is July 26, 2002 Send comments to: –Rebecca Miller, ICF Consulting Timeline for Version 1.0: –Draft 1 released: June 24, 2002 –Comment period: June 24-July 26, 2002 –Final: Fall 2002