May contain Caltech/JPL proprietary information and be subject to U.S. Government Export Laws; U.S. recipient is responsible for compliance with all applicable.

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Critical Design Review 2002 November 20,21,22 STEREO IMPACT 1 SEP Central, LET, and SEPT Flight Software Presenter: Andrew Davis
PALM-3000 P3K FPDP Carrier Board Review Dean Palmer Building 318, Room 125 November 10, :00 am – 12:00 pm.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
Asis AdvancedTCA Class What is a Backplane? A backplane is an electronic circuit board Sometimes called PCB (Printed Circuit Board) containing circuitry.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
National Aeronautics and Space Administration General ICD information for SDRs For consideration for EDS Development Sandra Johnson NASA Glenn.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
P. Earle p1 November 16, 2001Electrical SNAP Electrical Design Estimates November 16, 2001 C. Paul Earle Super Nova/Acceleration Probe.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Peter Walpole, UMd1 SUPRATHERMAL ION TELESCOPE SIT.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
ONE Concept. ONE Work area & lab setup ONE Goals Provide single network interface regardless of physical link Provide reliable, isochronous message transport.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ITAR Restricted Data THEMIS Power Subsystem CDR Peer Review 6/14/04 Probe and Probe Carrier Harness Dave Manges (301)
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 HET/SIT Flight Software and GSE Tycho von Rosenvinge )
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 Rick Cook1 LET Electronics.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
WBS 1.03 Readout Systems Scope, Cost and Schedule
ESA GSE.
Preliminary Design Review
Digital Sub-System Bob Goeke.
AQT90 FLEX Service Training
Systems Engineering Bob Goeke.
SLAC DOE Program Review
Command and Data Handling
Presentation transcript:

May contain Caltech/JPL proprietary information and be subject to U.S. Government Export Laws; U.S. recipient is responsible for compliance with all applicable U.S. export regulations. Electronics System Overview and Interfaces Rick Cook Electrical Systems Engineer

Theme Message (List 3 strengths ?) 2 FP&E CDR July 14/15, 2009 Electronics Configuration  Electronics  Provide regulated power to instrument  Control and readout the Focal Plane Modules (FPM)  Control of calibration source motor  Control and power for mast adjustor  Control, readout and power for laser metrology system  Control of instrument operational thermal heaters, thermistors  Control and readout PMD experiment  Single command/data interface with S/C through CEB  Operate off 30V power from S/C

Theme Message (List 3 strengths ?) 3 FP&E CDR July 14/15, 2009 Design Overview  Design/implementation emphasizes manufacturability, reliability and serviceability  Access to boards, detectors  Central Electronics Box (CEB) [4 boards plus backplane] has card cage design with heat-actuated connectors for easy removal/servicing  Minimize internal wiring and harnessing  Minimize electronics parts types and count  Rely where possible on familiar parts, connectors, processes  Use same parts types as STEREO, ACE where possible, same foundry for ASIC as HEFT  All lab detector test benches utilize same MISC processor architecture as flight instrument  Enables/requires early firmware/software development  Establishes data formats early

Theme Message (List 3 strengths ?) 4 FP&E CDR July 14/15, 2009 Electronics  Eleven distinct boards in FP&E subsystem  Excludes laser metrology boards (discussed yesterday) and mast adjustor

Theme Message (List 3 strengths ?) 5 FP&E CDR July 14/15, 2009 Design Overview  Detector carrier board, motherboard, FP MISC board, CEB logic board, OBEB boards designed and implemented by Caltech  PMT base board utilizes HVPS design from UCB (preliminary layout, breadboard by UCB) integrated onto Caltech board with remaining circuitry  LVPS, Post Reg, and CZT HVPS designed by Dean Aalami (Space Instruments-SI)  Long collaboration with SI on ACE/Stereo  Design, layout, EM test, reliability analyses by SI  parts procurement, flight board procurement, and fabrication by Caltech  Same successful model followed on ACE and STEREO

Theme Message (List 3 strengths ?) 6 FP&E CDR July 14/15, 2009 Design/test Flow Preliminary design and schematic R. Cook Detailed schematic J. Burnham V. Nguyen Layout J. Burnham V. Nguyen Parts identification EM and flight B. Kecman J. Valenzuela Formal parts stress analysis J. Burnham EM Fab Vendor L. Hernandez J. Olivares Parts Procurement, EM and Flight B. Kecman, J. Valenzuela, J. Olivares Test/rework/test R. Cook B. Kecman J. Burnham V. Nguyen Flight Board Fabrication Vendor L. Hernandez, JPL Layout Review C. Derksen (JPL) Flight Board Test R. Cook, B. Kecman, J. Burnham, V. Nguyen Staking, Conformal Coating JPL

Theme Message (List 3 strengths ?) 7 FP&E CDR July 14/15, 2009 Board Status BoardSchem- atics LayoutEM fabEM testFlt board layout Long lead flt parts procured Detector carrier100 Detector mother100 FPM MISC PMT Base100 CEB logic CEB LVPS CEB postreg CEB CZT HVPS CEB backplane OBEB adj/logic OBEB analog FP&E Board development status

Theme Message (List 3 strengths ?) 8 FP&E CDR July 14/15, 2009 Reliability Analyses  JPL review/requirements discussed in SMA presentation tomorrow  PSAs completed prior to flight board procurement, and typically before EM board procurement  CIT engineer (J. Burnham) performes analysis using JPL spreadsheet or annotated schematic  A separate CIT designer (R. Cook) reviews analysis  Select analyses reviewed by JPL  WCTA for FPGAs will be completed upon final flight part FPGA design/burn in  Flight ACTELs costly, not available until 8/09  To mitigate design risk, clock margin tests performed on EM parts  Two flight-quality parts received - clock margin tests will be performed on EM boards with these parts

Theme Message (List 3 strengths ?) 9 FP&E CDR July 14/15, 2009 Reliability Analyses BoardPSASEEAWCTA complCIT revcomplrevcomplrev Detector carrier  Detector mother  FP MISC  12/09C+30d PMT base  CEB logic  8/1  12/09C+30d CEB CZT HVPS7/24/09C+10d CEB LVPS7/24/09C+10d CEB LVPS reg7/24/09C+10d CEB backplane10/20/09C+7d OBEB logic/adj8/7/09C+7d  12/09C+30 OBEB analog8/7/09C+7d

Theme Message (List 3 strengths ?) 10 FP&E CDR July 14/15, 2009 Electronics Power BoardPower (W)Notes Detector motherboard w/ 4 Detectors 0.4 Measured from EM Focal plane MISC 0.8 Measured from EM PMT base 1.3 Measured from EM Central logic 0.75 From schematics CZT HVPS 0.36 From schematics LVPS 2.5 From schematics Post reg 0.15 From schematics OBEB boards (incl laser drive) 4.5 From schematics Total electronics power: XX W : FP&E power dominated by thermal

Theme Message (List 3 strengths ?) 11 FP&E CDR July 14/15, 2009 Grounding Approach  Describe the grounding philosophy/approach here with attention to sensitive signals, avoiding ground loops, ……..

Theme Message (List 3 strengths ?) 12 FP&E CDR July 14/15, 2009 Overall Grounding Diagram  Insert overall grounding diagram here

Theme Message (List 3 strengths ?) 13 FP&E CDR July 14/15, 2009 Bench Grounding Diagrams  Insert grounding diagrams for benches here

Theme Message (List 3 strengths ?) 14 FP&E CDR July 14/15, 2009 Instrument to S/C Electrical Interfaces  Interfaces with S/C controlled by EICD (JPL D )  signed and under configuration control  Command and data interfaces with S/C go through CEB  Command – 57.6 kbaud serial  Data – kbaud three wire serial (clock, data, gate)  Reset msec pulse  Frame Sync – 1 msec pulse, once per second  Other interfaces  Motor controller - managed by JPL, not covered in this review  Primary operational power: 30 V to CEB for distribution (fused or not - anything interesting to say?)  Survival heater power: 30 V  S/C monitored thermistors

Theme Message (List 3 strengths ?) 15 FP&E CDR July 14/15, 2009 MUC to Instrument  CEB interfaces to S/C Mission Unique Card (MUC)  RS422 interface for commands and data  Describe data enable, synch or anything else - is it synchronous, asynch, quasisynch……

Theme Message (List 3 strengths ?) 16 FP&E CDR July 14/15, 2009 Data Formats, Telemetry Protocols  Science, Metrology, HK, and Command responses are formatted into CCSDS packets by CEB MISC  Raw and packetized instrument data formats are defined in Instrument Telemetry Format Document  Packet headers, APIDs, packet sizes, transfer protocols, etc. have been negotiated with S/C team, and documented in Instrument/Spacecraft ICD (JPL D-41874), and are under configuration control Basic packet format

Theme Message (List 3 strengths ?) 17 FP&E CDR July 14/15, 2009 Data Transfer  Packet time stamps, checksums inserted by CEB  no requirement on S/C to examine/modify contents  Realtime packets contain HK, detector leakage currents, Cmd- responses, and subset of science and metrology data  4 pkts/s max  Recorder packets contain all science, metrology, PMD data  Throughput limited by S/C VR capacity and availability of downlink passes  Instrument maximum science data rate is commandable Basic data flow from instrument to S/C memory to ground

Theme Message (List 3 strengths ?) 18 FP&E CDR July 14/15, 2009 Command Format Command transfer format  S/C unpacks instrument telecommand packets, routes contents to CEB via instrument cmd serial interfaces per ICD protocols  Instrument command responses are encapsulated in CCSDS packets with an APID as defined in ICD

Theme Message (List 3 strengths ?) 19 FP&E CDR July 14/15, 2009 Summary  Design approach follows CIT/SRL methodology proven most recently on ACE (CRIS&SIS) and STEREO  Designs and schematics for all circuits completed  Early completion and test of FPM EM gives high confidence  Most critical circuits tested and working as a system: Flight ASIC PMT base FPM MISC Detector carrier board Detector motherboard