TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Nuria Catalan Lasheras, TE/MPE-EI REVIEW OF ELECTRICAL DRAWINGS FOR THE LHC SUPERCONDUCTING CIRCUITS.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
CRYOGENICS AND POWERING
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Communicating Visually with Visio Gini Courter Annette Marquis.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
P Dec-15 IEEE P1801 Working Group (Unified Power Format – UPF) Status Stephen Bailey Chair, P1801 Working Group.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI Status of the LHC Electrical Drawings. Progress over the last 3.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
TE-CRG Activities D. Delikaris, TE-CRG.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
First LHC Splice Review Introduction
CERN-ITER Workshop Magnet installation Some critical assembly and installation contracts Anders Unnervik 17 Jan 2017.
CERN Construction Planning and Scheduling (LHC installation)
Cold mass design, assembly plans and QA/QC at CERN
Beam Interlock System SPS CIBU Connection Review
Powering LHC magnets version 30/3/2007.
ELQA Electrical Quality Assurance
LHC Hardware Commissionning
Document Plan & Milestones WP7
Configuration Management and Layout Database ELENA Project
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
MPE main activities planned for LS2
Status of ELQA equipment and related software
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
The HL-LHC project: info day for industry
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
Brief report of the hardware commissioning activities
Hardware Commissioning
ECR on pole order of the HL-LHC IT circuit and resulting implications
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Nuria Catalan Lasheras, TE/MPE-EI REVIEW OF ELECTRICAL DRAWINGS FOR THE LHC SUPERCONDUCTING CIRCUITS N. Catalan Lasheras

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 2 Nuria Catalan Lasheras, TE/MPE-EI The task  We would like to have a set of drawings for the electrical circuits  Starting with the available drawings (LSD) –Because we have used them extensively  Produce schematic drawings of the LHC SC circuits adding missing information –the instrumentation, quench heaters, voltage taps,… –Interconnection details, location, splice type –mechanical relevant data, liras, cryogenic plugs –Non conformities –…

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 3 Nuria Catalan Lasheras, TE/MPE-EI Dos and Donts  One single continuous drawing by arc/sector/powering subsector  Not to-scale, not mechanical –But alignment and distribution should intuitively match reality –Cryo lines, cryostats, DFB chimneys etc.  Using layers –User can decide to see/print by circuit, by DFB, with/without instrumentation  Hyperlink to other information resources  Based in AutoCad, no circuit simulation capacity  No substitute for electrical drawings or mechanical drawings

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 4 Nuria Catalan Lasheras, TE/MPE-EI Schedule  Sector 1-2 first version available for July 2011  About one new sector every month ready for review  All sectors available in Dec 2011  First reviewed sector ready by Dec 2011  Approval of all sectors during 2012  Navigation tools developed in 2012  Insertion in CDD, EDMS of all sectors by Dec 2012  All drawings approved and ready to print from official sources before the next long technical shutdown (2013)

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 5 Nuria Catalan Lasheras, TE/MPE-EI Agenda  Review of electrical drawings for the LHC superconducting circuits 09: :15 Introduction Dr. Nuria Catalan Lasheras (CERN) 09: :15 Overview of the schematic electrical drawings for one sector Stephen Pemberton (CERN), Kevin Pereira (CERN) 10: :30 Coffee break 10: :45 How ElQA activities can profit from the schematics? Richard Mompo (CERN) 10: :15 Web Navigator. The example of the mechanical database Herve Prin (CERN) 11: :30 Future implementation. Plans for EDMS, CDD. Dr. Nuria Catalan Lasheras (CERN) 11: :50 A.O.B.

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 6 Nuria Catalan Lasheras, TE/MPE-EI What we want for you  To the best of your knowledge: –Verification of the sources used –Additional sources we may have forgotten  Project yourself in the tool –How would you use it? –What would you be missing –…we will do our best  Review process –Suggestions –We need vounteers!!

TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 7 Nuria Catalan Lasheras, TE/MPE-EI Thanks for your attention!!