T3 Webinar September 2012 Performance Measures Edward J. Smaglik September 18 th, 2012.
Advertisements

Identifying Split Failures Due to Over Saturation (Demand> Capacity) Ed Smaglik, Darcy Bullock, Jim Sturdevant & Tom Urbanik.
1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
1 Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 10/18/11.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Introduction to Transport
PASSER II SOFTWARE.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Signalized Intersections
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
2015 Traffic Signals 101 Topic 7 Field Operations.
Transportation Engineering
Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
University of Maryland Department of Civil & Environmental Engineering By G.L. Chang, M.L. Franz, Y. Liu, Y. Lu & R. Tao BACKGROUND SYSTEM DESIGN DATA.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini.
ADAPTIVE SIGNAL CONTROL TECHNOLOGY MODEL SYSTEMS ENGINEERING DOCUMENTS 1 December 20, 2012.
Coordinated Operations, notes from the field Edward Fok Resource Center Operations Technical Service Team 2005 TRB Annual Meeting.
Chapter 20: Actuated Signal Control and Detection
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Coordination Matt Wiesenfeld Darcy Bullock Purdue University.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
Chris Pangilinan, USDOT Research and Innovative Technology Administration Applications for the Environment: Real- Time Information Synthesis (AERIS) State-of-the-Practice.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
Signalized Intersection Performance Measurement Vendor Perspectives Regarding INDOT/Purdue/Vendor Collaborative Project Eric Raamot Vice President, Engineering.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Performance Measurements Using MAC Addressable Technology TPB MOITS Traffic Signals and Operations Subcommittee November 12, 2008.
The Indiana Local Technical Assistance Program Local Agency Perspective Neal Carboneau, PE Research Manager.
Presented by Gary Duncan Traffic Signal Performance Measures.
1 Signalized Intersection Performance Measures West Lafayette, Indiana for SR 43 (River Road)
Mission Street Voyage Advanced Features Test Facility Mission street is a major arterial corridor that was re-timed 10 years prior to our project. Our.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Urban Traffic Management System OPTIMIZATION OF URBAN TRAFFIC CONTROL SYSTEM Riza Atiq Abdullah bin O.K. Rahmat.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Thinking Inside the Box

Outline Sensys SensMetrics Solution SensMetrics Performance Measures
MOVA Traffic Signal Control Trial
An ACSLite Case Study Riva Road in Annapolis, MD
* Topic 7 Field Operations
Signalized Intersections
FM 518 By-pass Traffic Review
Highway capacity and Level of Service Analysis
CE 3500 Transportation Engineering Saturation flow and signal LOS
School of Civil Engineering
Transportation Engineering Calculating Signal Delay February 23, 2011
Presentation transcript:

Leveraging Existing Traffic Signal Infrastructure to Produce Performance Measures for System Optimization and Construction Acceptance

Advisory Committee Study Advisory Committee – Indiana LTAP Neal Carboneau and John Habermann – Local Highway Departments and Engineering Firms Lafayette: Fred Koning Elkhart County: Jay Grossman BFS Engineering: Steve Hardesty BFS Engineering: Tom Vandenberg – Vendors Traffic Control Corp: Chip Lang Purdue University Researchers – Principal Investigator: Darcy Bullock – Research Assistants: Ross Haseman and Chris Day

Background 3 What are Traffic Signal Performance Measures? Using the new generation of signal controllers to monitor and record actual traffic data Analyzing the data to get a sense of how well the signal is performing, and plan changes Analyzing the data later to verify that changes worked as planned

Why Do We Care? 4 National Traffic Signal Report Card

Why Do We Care? BENEFITS OF EXCELLENCE IN TRAFFIC SIGNAL OPERATIONS If the nation supported its signals at an A grade level, quality of life and protection of the environment would benefit significantly, including: Reductions in traffic delay ranging from 15–40 percent; reductions in travel time up to 25 percent; and reductions in stops ranging from 10–40 percent. Reductions in fuel consumption of up to 10 percent. Reductions in harmful emissions (carbon monoxide, nitrogen oxides and volatile organic compounds) up to 22 percent. According to the Surface Transportation Policy Project, motor vehicles are the largest source of urban air pollution. Source: 2007 National Traffic Signal Report Card 5

I. Define Objectives, Assess and Prioritize activities by Time of Day and location II. Assembly relevant data to support timing and docu- mentation objectives III. Software Modeling IV. Timing Design and Docu- mentation V. Deployment VI. Assess Traffic Signal Timing Process Performance Measures Performance Measures

Current Practice Collect Model Deploy Observe and Adjust

Current Vendor Provided Performance Measures Not Enough for Real Optimization/Analysis Vendors will respond to specifications, but we need to know what to ask for

Issues Data Collected is Expensive and Sparse – 6 AM to 6 PM one work day every three years Analysis of Implemented Changes can be Subjective – ‘Watch’ traffic for 20 minutes – Phone calls from public

Performance Measure Evolution Procurement Specification

Six Recommended Performance Measures

Cycle Length

Equivalent Hourly Flow Rate

Green Time Plot

Volume to Capacity Ratio

Split Failures Per Half Hour

Purdue Coordination Diagram (PCD)

Percentage of Phases with Peds

Draft Specification

Indiana LTAP Research Project 20 Adapt previous research to local agency level Try performance measures with a wider array of equipment installations Develop base number of recommended performance measures Train agencies to implement tools

Elkhart County 21

CR17 at Missouri 22 Test of performance measures at isolated LPA intersection. Use of video detection with performance measures.

Sample Use of Performance Measures Purdue Progression Diagrams as Changes Were Implemented at CR17/Missouri

PCD Before Change, Phase 6, 02/17/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N Start of Green We want to shift platoon earlier Start of Yellow End of Cycle Double Cycle Triple Cycle T

Predicted PCD After Change, Phase 6 02/17/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N Calc Offset 35s+19s=54s We want to shift platoon earlier T

PCD After Change, Phase 6, 02/24/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N Time Change Was Implemented

PCD Phase 6, 02/25/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N Subsequently Fixed on 3/09/09 54s offset ok with 60s cycle 54s offset fails with 50s cycle

PCD Phase 6, 03/07/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N Not set back to TOD after correction, fixed 3/09

PCD Phase 6, 03/20/09 Φ1Φ1 Φ6Φ6 Φ5Φ5 Φ8Φ8 Φ3Φ3 Φ7Φ7 Φ4Φ4 Φ2Φ2 N

Future Work: CR17 Corridor 30 Apply performance measures to an LPA corridor Follow after similar study on Indiana SR37

: CR17 Corridor Signals Links I-80/90 Toll Road with US20 and US33 Volumes from 12,000 – 30,000 vpd Letting this spring for communications interconnect project Downloading of event logs from individual intersections to central database Tools for performance measures work on downloaded database files

CR350 – Lafayette, IN Performance Measures as a Construction Acceptance Tool 32

Multiscale: Intersection Details Where are my Opportunities for improvement 33

I. Define Objectives, Assess and Prioritize activities by Time of Day and location II. Assembly relevant data to support timing and docu- mentation objectives III. Software Modeling IV. Timing Design and Docu- mentation V. Deployment VI. Assess Role of Performance Measures Our Focus 34

How do we know if the signal system is functioning as intended when we turn it on after construction? 9 th St.18 th St.Regal ValleyOsborneConcord 35

Data Collection About 150,000 events occur every day at each intersection Current generation controllers can record these events to 0.1 second fidelity for analysis 36 9 th St.18 th St.Regal ValleyOsborneConcord

Abbreviated Performance Measure Based Checklist 1.Are the detectors detecting? 2.Are the counts reasonable? 3.Are all of the phases active? 4.Are the TOD plans working correctly? 5.Are our green time allocations reasonable? 6.Is our progression functioning? 37

1. Are the detectors detecting? NA NB NL EA EAc EL ELc SA SL Sac SLc WA WB WAcWBc WL WLc Detectors 1, 2, 3, 4, 5, and 7 (NA, NB, and NL) not reporting detections, as their conduit was crushed during construction. (9 th St.) 38

1. Corridor Overview 9 th St.18 th St.Regal ValleyOsborneConcord 3 Detectors Not Reporting Data 2 Detectors Not Reporting Data 0 Detectors Not Reporting Data 1 Detector Not Reporting Data 39

2. Are the counts reasonable? Count Detector for EB counting far too few vehicles (18 th St.) NA NB NAc NBc NL EA NLc EAc EB EL EBc ELc SA SAc SL SLc WB WL WBc WLc SA and SL have far too many detections (chatter) (18 th St.) 40

2. Corridor Overview 9 th St.18 th St.Regal ValleyOsborneConcord 0 Detectors Miscounting 3 Detectors Miscounting 0 Detectors Miscounting 0 Detector Miscounting 41

3. Are all phases receiving reasonable green time? Are min times as expected? 1 EL 2 W 3 NL 4 S 5 WL 6 E 7 SL 8 N WL Phase Not Active (Concord) 0:0024:0012:000:0024:0012:000:0024:0012:000:0024:0012:00 42

3. Corridor Overview 43 9 th St.18 th St.Regal ValleyOsborneConcord 0 Phases Not Active 1 Phase Not Active

4. Are the TOD plans working correctly? Only the 11:30 to 13:00 Timing Plan is Running, Intersection Free for the Rest of the Day (Concord) Coordinating 5 intersections is like trying to have 5 people record the same sequence of TV shows

4. Corridor Overview 9 th St.18 th St.Regal ValleyOsborneConcord 1 TOD Plan Not Correct 0 TOD Plans Not Correct 1 TOD Plan Not Correct 4 TOD Plans Not Correct

5. Are our green time allocations reasonable? Time of Day Volume to Capacity Ratio 0:0024:0012:00 100% 0 50% 0 0:0024:0012:00 0:0024:0012:00 0:0024:0012:00 100% 50% EL W NL S WL E SL N 46 Southbound Could Use Some More Green Time

Methodology: Build From Measurable Quantities Volume to Capacity Ratio Uniform Delay g = green time (s) C = cycle length (s) X = volume to capacity ratio v = flow rate (veh/h) s = saturation flow rate (veh/h) Measurable Quantities

Eastbound V/C Ratios Morning TOD Plan Should Start Earlier

Eastbound V/C Ratios Morning TOD Plan Should Start Earlier

6. Is our progression functioning? 9 th St.18 th St.Regal ValleyOsborneConcord B A

9 th St.18 th St.Regal ValleyOsborneConcord Improving Progression by Adjusting Offsets B A B A

Is the Progression Functioning Using the PCD 9 th St.18 th St.Regal ValleyOsborneConcord

18 th Street Most vehicles are arriving on red Most vehicles are now arriving on green

Abbreviated Performance Measure Based Checklist 1.Were the detectors detecting? – 7 were not 2.Were the counts reasonable? – 6 were not 3.Were all of the phases active? – 1 was not 4.Were the TOD plans working correctly? – 6 were not 5.Were our green time allocations reasonable? – 1 adjustment called for 6.Was our progression functioning? – Tweaking the weekday TOD plan offsets reduced travel time by 15% per vehicle. 54

We want to embrace “picture book based performance measures”

Contact Jay Grossman

Extras

Leveraging Existing Traffic Signal Infrastructure to Produce Performance Measures for Construction Turn-On and Scheduled Maintenance March 8 th, 2010 Purdue Road School

Advisory Committee Study Advisory Committee – Indiana LTAP Neal Carboneau and John Habermann – Local Highway Departments and Engineering Firms Lafayette: Fred Koning Elkhart County: Jay Grossman BFS Engineering: Steve Hardesty BFS Engineering: Tom Vandenberg – Vendors Traffic Control Corp: Chip Lang Purdue University Researchers – Principal Investigator: Darcy Bullock – Research Assistants: Ross Haseman and Chris Day

CR17 at Missouri 60 One study objective was to try performance measures on intersections with a variety of equipment, as would be found in a typical LPA

Signal System Timing Process I. Define Objectives, Assess and Prioritize activities by Time of Day and location II. Assembly relevant data to support timing and docu- mentation objectives III. Software Modeling IV. Timing Design and Docu- mentation V. Deployment VI. Assess Today’s Topic 61