NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER (INDUSTRY ADVISOR) DR. KENNEDY (CUSTOMER) DR. NUXOLL (CLASS ADVISOR) Stoplight Pizza Wind Belt Generator
Introduction Team Members Project Background Block Diagram Design Challenges Risks Milestones Conclusion
Team Members Nicole Feliciano (Team Lead) Home Town: Aiea, Hi Favorite Hobby: Puzzles Interesting Fact: Don’t have a middle name Noor Husain (Team Member) Home Town: Kuwait Favorite Hobby: Reading Interesting Fact: Fluent Arabic, Persian, English
Team Members (Cont.) Kyle Grotjohn (Team Member) Hometown: Riverside, CA Favorite Hobby: Messing with my bike Interesting Fact: I love cheesecake John Figueira (Team Member) Hometown: Kapolei, Hi Favorite Hobby: Building models Interesting Fact: I really like free things, especially food
Background Developing Countries More efficient and smaller wind power Remote applications Wind Belt Faraday’s Law Narrows Bridge
Block Diagram
Design Challenges Placement of Magnets & Coils Must be stable One end of design Membrane Tension Loss of power Tension adjustment at end Stator vs. Coils Cost vs. efficiency Coils for cost Creating Coils Particular design Many prototypes and sealant
Risks SeverityLikelihood Magnet strength too lowModerate Frame does not support tensionHighModerate The coils do not cause an adequate magnetic field High Moderate Rectifier/Battery burn out due to too much charge ModerateModerate/Low
Milestones NumberDescriptionCompletion Date 1Project Proposal8/31/2012 2Due: Functional Specification, first complete draft (ver 0.9)9/21/ September Program Reviews Due: Functional Specification, advisor-approved draft (ver 0.95) Complete website Submit part list for approval 9/28/ Due: Functional Specification, final draft (ver 1.0) Project Support from Craig Henry and Allen Hansen 10/05/2012 5Due: Project Business Assessment10/12/2012 7October Program Reviews10/26/2012 8First Prototype constructed10/31/2012 9Due: Design Document, first complete draft (ver 0.9)11/02/ Due: Design Document, advisor-approved draft (ver 0.95) Deadline: Team Meeting with Peter Rachor 11/09/ Due: Design Document, final draft (ver 1.0)Final Budget11/16/ November Program Reviews Due11/30/12
Conclusion Team Stoplight Pizza Importance/Background Design and Challenges Risks and Milestones