Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC

Slides:



Advertisements
Similar presentations
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Advertisements

November SLS RFM and RNG REPORT 18 November 2004.
CCSDS Navigation Working Group David Berry 10/01/2007.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
CSSM Meeting Summary Spring 2013 Meetings 15 – 18 April E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Bordeaux, France.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Status of Delta-DOR interoperability Berlin October 14 th, 2008 Mattia Mercolino ESA/ESOC,
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
CCSDS Navigation Working Group David Berry 04/20/2009.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
CCSDS Navigation Working Group David Berry 01/16/2007.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
CCSDS Navigation Working Group David Berry 10/13/2008.
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
Colorado Springs Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
CMC meeting, Nov., 2009 Page 1 JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
JAXA CCSDS Secretary Office
Space Communication Cross Support Architecture WG
Cross Support Architecture WG: Charter and Work Plan
CCSDS Navigation Working Group
Delta-DOR WG: Report of the Fall 2010 Meeting
SDLS Protocol Green Book initiation
Mattia Mercolino, ESA/ESOC
CCSDS Navigation Working Group
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
JAXA CCSDS Secretary Office
Review of Decision 2010/477/EU and MSFD Annex III
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Presentation transcript:

Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC

List of participants  Roberto Maddè, ESA/ESOC, chair  James Border, NASA/JPL, member  Hiroshi Takeuchi, Jaxa/ISAS, member  Mattia Mercolino, ESA/ESOC, member

Adoption of the agenda  Introduction of the DDOR SIG  Presentation of the SIG with plans, roles, responsibilities and milestones, to make it a WG  Open discussion  Presentation of JPL: Considerations on DOR tone frequency and structure  Presentation of JAXA on ongoing activities for cross- cooperation  Presentation of ESA on ongoing activities for cross-cooperation  Open discussion

1.1 Support to the proposed Working Group  ESA stated that such support is granted.  NASA/JPL stated that the support is in principle granted and will confirm what the necessary steps to get the formal approval are (if any), by Oct.19 th  Jaxa stated that the support is in principle granted and will confirm what the necessary steps to get the formal approval are (if any), by Oct. 19 th.

1.2 Adoption of a charter  The charter recently distributed has been discussed  Few changes have been implemented  The SIG considers that the current version is suitable for discussion and/or approval for the CESG and CMC.

2.1 Definition of roles and responsibilities (1)  ESA will be the Editor of the 2 foreseen books  Table of contents for the Magenta Book:  General introduction  Introductory chapter, derived from current ch. 2 of the WB (MM)  End-to-end description, based on current ch. 3 of the WB (MM)  Interfaces description and references to existing/to be updated Blue Books (RM)  Configuration of the Delta-DOR measurement (MM) Station and spacecraft parameters Orbit ephemeris parameters Scheduling Data transfer procedures Correlation process parameters Operational validation aspects  Interagency data exchange procedures (JB)  Interoperability validation process (JB-MM-HT)  Quasar catalogue implementation, validation and maintenance (HT-JB)

2.2 Definition of roles and responsibilities (2)  Draft table of contents of the Green Book:  Overview of the process  Theoretical background  System rationale and trade-offs  Description of existing systems  Achievable performance  Delta-DOR related techniques Phase referencing Same Beam Interferometry  The table of contents will be finalised in the Fall 2008 Meeting  Roles and responsibilities will be defined in the Fall 2008 Meeting

2. 3 Agreed milestones DateMilestone October 2007WG kick-off (if approved) April 2008 Draft “Delta-DOR recommended practice for cross support” Magenta Book for the CCSDS 2008 Spring meeting August 2008 Revised draft “Delta-DOR recommended practice for cross support” Magenta Book for Agency review Fall 2008 Second issue of “Delta-DOR recommended practice for cross support” after Agency review for CCSDS 2008 Fall Meeting Discussion on “Delta-DOR technical characteristics and performance” Green Book and work distribution December 2008 Finalised review and issue “Delta-DOR recommended practice for cross support” Magenta Book April 2009 Draft “Delta-DOR technical characteristics and performance” Green Book for CCSDS 2009 Spring meeting July 2009 Revised draft “Delta-DOR technical characteristics and performance” Green Book Fall 2009 Finalised review and issue “Delta-DOR technical characteristics and performance” Green Book for CCSDS 2009 Fall meeting

4. JPL presentation – conclusions (1)

4. JPL presentation – conclusions (2)  It was agreed that the material presented by JPL needs to be considered carefully in view of enhanced performance, to be proposed to future missions  Implication of flexibility on tone position and structure (i.e. the possibility of spreading the tones) to be:  First discussed within the WG, including feedback with transponder, Ground station and spectrum management specialists  Later, discussed with SLS-RNG

5. Jaxa presentation – conclusions  Jaxa presented their current activities  Jaxa will be able to provide raw data either in K5, Mk5 or VSR format  Jaxa proposed to introduce the description of other techniques in the coming Green Book; this proposal has been accepted and the draft table of contents is already updated.  Jaxa plans to use VLBI-related techniques on current and coming missions

6. ESA presentation  ESA presented the status of cross-cooperation with JPL and JAXA  The development of raw data translators is acknowledged to be right way to go, to insure interoperability, in the short time scale  The use of a Common Data Format (CDF) for the exchange of raw data can be the good solution, in the long term  The approach followed by ESA to validate their Delta-DOR interoperability concept with JPL can be taken as a guideline for the coming Magenta Book (chapter “Interoperability Validation process”)

Conclusions  The support of 3 agencies to the proposed WG has been assessed (NASA and JAXA have to formally state their support)  The Charter has been discussed and finalised  The TOC of the proposed Magenta and Green Books has been discussed and agreed  Roles and responsibilities for the Magenta Book have been agreed  The schedule and milestones for the books preparation have been agreed  Suggestions coming from NASA, JAXA and ESA presentations have been collected and will be inserted in the coming books, as required