1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
PER
PER Update & Compliance Lessons Learned
FRCC Fall Compliance Workshop October , 2013
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
CIP Spot Check Process Gary Campbell Manager of Compliance Audits ReliabilityFirst Corporation August, 2009.
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
Gcpud1 CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
BS Information Systems – University of Redlands BS Information Systems – University of Redlands AS Electronic Technology AS Electronic Technology Project.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Notice of Compliance Audit
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Reliability Standards Update
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
City of Leesburg Electric Department Internal Compliance Program (ICP)
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
SPP.org 1. EMS Users Group – CIP Standards The Compliance Audits Are Coming… Are You Ready?
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Status Report for Critical Infrastructure Protection Advisory Group
“NERC Hot Topics” Marc Butts May 9, 2008 Marc Butts May 9, 2008.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Texas Regional Entity Report Mark Henry June 6, 2008.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
1 Audit Preparation. 2 September 8 – 11, 2008 ERCOT will be audited as the Reliability Coordinator (RC) Transmission Operator ( TOP) Balancing Authority.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
NERC Reliability Readiness The Next Steps
MOPC Meeting Oct , 2016 Little Rock, AR
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
CIIMS Proposal for TOP-003 Approach
NERC Reliability Standard EOP 001
ERCOT Technical Advisory Committee June 2, 2005
Phil O’Donnell, Manager Operations and Planning Audits
CEO/Co-founder, SOS Intl
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Mandatory Reliability Standards
Phil O’Donnell, Manager Operations and Planning Audits
Presentation transcript:

1 Power System Restoration

2 Not Active

3

4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007

5 NERC Compliance Enforcement Program Works to ensure compliance with NERC and regional reliability standards Each region has the responsibility to implement their own regional compliance enforcement program NERC oversees each region’s compliance review and enforcement process

6 NERC Compliance Enforcement Program Compliance efforts comprise two key activities  Compliance reviews  Compliance enforcement

7 Reliability Standards The NERC Reliability Standards define the reliability requirements for planning and operating the North American bulk power system.  All Approved Reliability Standards are subject to audit (based on entity registration)  NERC is/has registered entities: BA, TO, TOP, GO, GOP, RC, LSE, PSE, DP, TSP, PA, TPL, RP, RRO, RSG

8 Reliability Standards 83 of the NERC Reliability Standards have been approved by FERC and are subject to fines 24 of the NERC Reliability Standards remain pending before FERC Many of these 24 standards are the “fill-in-the-blank” standards NERC expects registered entities to be in full compliance with all the NERC approved standards

9 Reliability Standards In 2006, there were 17 Monitored standards in a Compliance Audit This year there are 43 Monitored standards in a Compliance Audit

10 Before The Audit Logistics for Audit Team of documentation  Lodging Information  Possibly Transportation  On site Meals, Snacks, Beverages  Badges  2-3 Conferences Rooms  Projectors  Staff Support

11 Before The Audit Pre-Audit Questionnaire  Request Information on all “monitored” standards  To assist the audit team in preparation  Documentation is normally sent electronically

Monitored Standards Standard #StandardReq.Who BAL Real Power Balancing Control Performance AllBA BAL Disturbance Control Performance AllBA, RSG, RRO BAL Frequency Response and Bias AllBA CIP-001-1Sabotage ReportingAll RC, BA, TOP, GOP, LSE CIP thru CIP Critical Infrastructure Protection Standards All BA, GO, GOP, IA, LSE, NERC, RC, RRO, TO, TOP, TSP

13 Monitored Standards Standard #StandardReq.Who COM-001-1TelecommunicationsR2, R5 TO, BA, RC, NERCNet User Organizations EOP Emergency Operations Planning AllBA, TOP EOP-003-1Load Shedding PlansAllBA, TOP EOP System Restoration Plans AllBA, TOP EOP Reliability Coordination – System Restoration AllRC

Monitored Standards Standard #StandardReq.Who EOP Plans for Loss of Control Center AllBA, RC, TOP EOP Documentation of Blackstart Generating Unit Test Results AllGO, GOP FAC Vegetation Management AllRRO, TO FAC Facility Ratings Methodology AllGO, TO FAC Establish and Communicate Facility Ratings AllGO, TO

Monitored Standards Standard #StandardReq.Who IRO Reliability Coordination – Responsibilities and Authorities All BA, GOP, LSE, PSE, RC, RRO, TOP, TSP IRO Reliability Coordination – Operations Planning All BA, GO, GOP, LSE, RC, TO, TOP, TSP IRO Procedures, Processes, or Plans to Support Coordination AllRC IRO Notifications and Information Exchange Between RCs AllRC IRO Coordination of Real-time Activities Between RCs AllRC

Monitored Standards Standard #StandardReq.Who PER Operating Personnel Training AllBA, TOP PER Operating Personnel Credentials AllBA, RC, TOP PER Reliability Coordination – Staffing AllRC PRC Protection System Misoperations AllDP, GO, TO PRC Protection System Maintenance and Testing AllDP, GO, TO

Monitored Standards Standard #StandardReq.Who PRC UFLS Equipment Maintenance Program AllDP, TO PRC-010-0UVLS ProgramAllDP, LSE, TO, TOP PRC UVLS System Maintenance and Testing AllDP, TO PRC-016-0SPS MisoperationsAllDP, GO, TO PRC SPS Maintenance and Testing AllDP, GO, TO

Monitored Standards Standard #StandardReq.Who PRC-021-1UVLS Program DataAllDP, TO TOP Planned Outage Coordination AllBA, GOP, RC, TOP TOP Transmission Operations R6TOP TOP Operational Reliability Information AllBA, PSE, RC, TOP TOP Reporting SOL and Interconnection Reliability AllRC, TOP

Monitored Standards Standard #StandardReq.Who TPL System Performance Under Normal Conditions AllPA, TPL TPL System Performance Following Loss of Single Element AllPA, TPL TPL System Performance Following Loss of Two or More Elements AllPA, TPL TPL System Performance Following Extreme Events AllPA, TPL VAR Voltage and Reactive Control AllPSE, TOP

20 Pre-Audit Questionnaire

21 On-Site Audit The audit team is lead by a member of the Regional Reliability Organization  Members may include: NERC Staff, FERC Staff, Volunteer Auditors, RRO Staff The team typically breaks up into 2 groups  The 2 groups are assigned separate tracks to audit simultaneously

22 On-Site Audit Track 1 may include  Review of documentation  Review of Training and Certifications  Review data (CPS1, CPS2) Track 2 may include  System Operator Interviews  Review Operator Tools  Stand-by Control Center Operations and Procedures (may include site visit)

23 On-Site Audit On Site Documentation  All Documentation supplied with questionnaire  Sensitive Data: CIP Information, Nuclear Agreements, Site Security  Training Records  Large Documents: Emergency Plans, Disaster Plans, etc.

24 On-Site Audit Audit team conducts an exit briefing summarizing team’s preliminary conclusions including:  Items of non-compliance with supporting information  Any added information required, and  Expected timeline for review and issuance of audit report

25 After the Audit Audit team prepares audit report  Items of non-compliance are identified  Entity has 5 business days to review report before release to public  “Critical Infrastructure Sensitive” information is removed from report prior to release to the public

26 Audit Process – Where It’s Going? Audit Team Composition  Previously comprised of volunteers  Moving toward “Paid Staff”

27

28 Reliability Standard Format A.Introduction - Title, Number, Purpose, Applicability, & Effective Date B.Requirements (R1, R2, etc.) C.Measures (M1, M2, etc.) D.Compliance - Compliance Monitoring Process & Levels of Non-Compliance E.Regional Differences F.Version History

29 Reliability Standard Format TOP Eight Requirements - Seven Measures

30 Compliance Documentation

31 Compliance Documentation

32 Wrap-Up and Review