DISTRICT B PRESENTATION Thursday, April 7 th, 2011 Saint Anthony’s Church
District B Investments [2004-Present] Paved 7.7 miles over 34 Streets $2.5 million Stanton Street Bridge- $650,000 Major Sewer Repair- $227, Catch Basins repaired/replaced Sand bar/debris removal Bowman-Spring Run- $390,000 Poplar Street Wall Repairs- $200,000 Major sewer Upgrades- $1.4 million District B Total= $6 million
2011 Infrastructure Projects Paving: S Franklin from South to Market Metcalf Street Moyallen Street Ross Street Phase II- $2.8 million Upgrade of the existing sewer system
Iron Triangle Playground Build 10/7/2010 PastPresent
City Wide Investments 2004-Present Paved 39 miles over 162 Streets $12 million Bridge Repairs- 5 completed $10.4 million Catch Basins- 1,317= $2,628,000 Sewer Repair- $2.5 million Creek wall maintenance- $3.8 million 4 Streetscape Phases- $8.5 million 3 new playgrounds- $600,000 Golf course/athletic fields- $1.1 million
Public Safety Police Department 29 new police officers on the street 250 camera citywide surveillance system Reinstated K-9 and S.W.A.T. unit Replaced bullet-proof vests for entire dept. twice Purchased tasers and related equipment Purchased new police radio antenna Records Management system 18 new vehicles to the fleet
Public Safety Fire Department Invested over $3 million in WBFD Purchased: 1 ladder truck- 3 Fire Engines 3 Ambulances Asst. Chief’s Vehicle 85 sets of Bunker Gear 70 Helmets Built Hollenback Fire Station Response Time= 3:57 [below national average]
Demolitions Demolished 125 abandoned and blighted properties citywide
Rental Property Regulations Rental inspections valid for 2 years Re-inspection mandated if tenants change Property owners outside of 15 miles must have local property manager Required Real Estate license “3-Strikes” Ordinance Authorizes city to immediately close nuisance properties 3 disruptive conduct reports from police and/or serious health or code violations
Rental Inspections MonthRental Insp.Re-Insp.Complaints September October November December January February March Total
Health Department Statistics
Intermodal Center PastPresent
Intermodal Center
Coal Street Park PastPresent
Coal Street Park PastPresent
Coal Street Playground
Pine Ridge PastPresent
Murray-Courtright PastPresent
Downtown Past Present
Streetscape PastPresent
Lighting Downtown PastPresent
Mill Street Homes PastPresent
River Common
South Main Street PastPresent
Northampton Street PastPresent
Elevations Ribbon-Cutting