Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Exit Reform Review Transmission Workstream 07 January 2010.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Inventory Management. Inventory Inventory or stock are the materials and goods required to allow for the production of supply of products to the customer.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
An Overview of Our Regulatory Proposal
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
A study into the benefits which storage facilities may provide to the UK gas transmission system Nick Wye Presentation to NTS Charging Methodology Forum.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
NEC Network Emergency Exercise - Exercise Prelude.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Safety Monitor - Winter Reviews Transmission Workstream 5 th July 2007 Chris Logue.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Review Group -140 Thoughts on additional information requirements.
DRSEC Update Transmission Workstream 06 November 2008.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Winter 2006/07 so far Gas Forum 29 January Actual Weather  December was the 5th warmest on record on a Composite Weather Variable Basis.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Exercise Neptune Findings Gas Customer Forum 29 th January 2007 Jacky Carroll Network Manager Emergency Planning Gas National Control Centre.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 7th Dec 2006 Chris Logue
Review of System Alerts
Transmission Planning Code – Draft Document
Transmission Workgroup 7th July 2011
Transmission Workstream, 01 October 2009
SO Incentives from April 2010
DRSEC Update August 4th 2009.
Special MRC – Fuel Security
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Review Group 0175: DM Supply Point Emergency Arrangements
Effective Construction Safety Management
Presentation transcript:

2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006

Safety Monitors – background  Define levels of storage that must be maintained through the winter period  Introduced in 2004 to replace ‘Top-up’  ‘Top-up’ focused on maintaining security of supply: Safety Monitors focus is public safety  Requirement of National Grid Gas’ Safety Case that action is taken to ensure storage stocks do not fall below the Safety Monitor levels - these decay as the winter progress

Gas Safety (Management) Regulations 1996  Requires anyone conveying gas in a network to prepare a Safety Case and for the Safety Case to be accepted by the HSE  The Safety Case must contain particulars which describe arrangements for a number of items listed in Schedule 1  These are high level requirements which must be described in detail in the Safety Case – GS(M)R does not define how a specific requirement is to be met.  The relevant requirement in Schedule 1 is clause 16  16 - Particulars to demonstrate that the duty holder has established adequate arrangements to minimise the risk of a supply emergency, where a “supply emergency" means an emergency endangering persons and arising from a loss of pressure in a network or any part thereof

GS(M)R Safety Monitors  The GS(M)R Safety monitor arrangements form part of National Grid’s detailed demonstration that it has arrangements in place to minimise the risk of a supply emergency  They address the risk posed by the possibility of insufficient storage being available for a 1 in 50 duration winter  The arrangements have been accepted by the HSE as discharging our responsibility in this area and we have a legal obligation to follow those arrangements  Any change in arrangements would constitute a material change to the Safety Case and National Grid would have to present a case which demonstrated that the new arrangements were at least as safe as the current arrangements

Safety Monitors – methodology  Loads protected by Isolation  NTS Interruptibles  LDZ Interruptibles  NTS Power Firm  NTS Industrial Firm  DM (excluding priority customers)  Loads protected by Monitor  Priority Firm DM  Ireland Firm  All NDM  >5860 MWh NDM  MWh NDM  MWh NDM  MWh NDM  0-73 MWh NDM Concept – sufficient gas held in store to support those customers who can not be physically isolated from the network, requirements include isolation process of large loads All loads categorised into two groups:

Supplies – assumptions (1)  “Baseload” – non storage supplies that are not limited by ‘space’, includes:  Beach  Interconnector  Grain (LNG Imports)  10 mcm/d supply risk to cover for supply uncertainty, notably import assumptions Supply (mcm/d)MaximumSeptember Assumptions December Assumptions Comments Beach327303~ % max beach Grain1713~13 IC Imports4842~3075% new imports Supply Risk-10 Baseload Supplies ~3800 GWh/d

Supplies – assumptions (2)  Storage supplies  Long – Rough  Medium –  Includes Hornsea and Hatfield Moor deliverabilities only  Includes Hornsea, Hatfield Moor, Hole House Farm and Humbly Grove space (reduced at onset to reflect start-up uncertainty)  Short – 4 LNG storage sites  Total storage supply level ~ 110 mcm/d (~1200 GWh)  Total storage space ~ 4000 mcm (~ 43,200 GWh)

Supply / demand component – loads protected by monitor

1 in 50 Firm load Baseload supplies underpins storage requirements (96% of supply)

1 in 50 demands by load type

1 in 50 load protected by isolation Isolation ~1300 GWh (120 mcm/d) Monitor (Supply / Demand)

1 in 50 load protected by monitor

Supply / demand component  10 mcm/d supply risk included in September analysis to cover for supply uncertainty, notably import assumptions  Supply risk had to be identified at time due to UNC requirements  Supply risk located in Long not to unsettle markets & Long considered lowest risk of monitor breach (GWh)September Assumptions Sept with 10 mcm/d supply risk Sept with re- allocation of supply risk December Assumptions Long Medium Short Total

Non - supply / demand component – load protected by isolation

Safety Monitors – Protected by Isolation

Isolation Component  Supply risk has a lesser impact than in supply / demand  Isolation needs established from observed behaviour from winter exercises (Krakatoa, Moscow)  Improved industry response would reduce isolation needs  Support for Isolation process is up to 48 hours  All above isolation needs are similar (GWh)September Assumptions Sept with 10 mcm/d supply risk Sept with re- allocation of supply risk December Assumptions Long Medium440 Short Total

Total Requirement for December  Final requirement is lower than combined needs of Supply Demand & Isolation due to some reduction for “double counting” i.e. Supply Demand for Day 1 and Isolation for Day 1 (GWh)Supply Demand IsolationCombinedFinal Requirement Long % Medium % Short % Total %

Monitor profiles

Monitor Profile Methodology  Storage space and duration requirements are known for all storage types for protected by monitor and protected by isolation  Protected by monitor is a winter long requirement  Protected by isolation is a one off requirement  Need to develop 2 key relationships:  Demand days and temperatures (CWV’s)  Latest dates in a winter when such temperatures could occur Days on Load Curve Supply Demand Isolation Long2662 Medium611 Short24

Day Number / Temperature Relationship Long isolation Long supply / demand

Calculation of Profiles  Protected by isolation is a one off requirement  Need to identify latest date when isolation could occur  A different requirement is calculated for each “Day” i.e. the Day 1 requirement is much earlier in winter than say Day 62  Protected by monitor is a winter long requirement  Need to identify latest requirement  Need to identify earlier needs to establish within year profile – review all previous winters  Profiles are then combined

Latest occurrence of cold (isolation)

Long safety monitor profile Monitor Isolation