TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra.

Slides:



Advertisements
Similar presentations
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Advertisements

ILC Power Coupler – Fabrication & Cost CPI Beverly Microwave Division November 12, 2013.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Coupler without copper coating S. Kazakov 11/13/2013.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
 1. When was the inventor born?  2. Where did he grow up? What did he do?  3. What/where was his first job?  4. What did he invent and what did it.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Structure of the task 12.2 Claire Antoine Eucard2 WP12 DESY
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
RF surface aspects at power couplers Wolf-Dietrich Möller Fundamental Power Coupler Workshop June 23 – 24, 2015, CERN, Geneva.
How to startpage 1. How to start How to specify the task How to get a good image.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Jörn Helbert Planetary Emissivity Laboratory Facing the heat – Obtaining near infrared real emissivity spectra at Venus surface temperatures.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
RRR and thickness measurements of Cu plating
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
John Saurwein February 6-7, 2001 Naval Research Laboratory, Washington IFE Target Process and Characterization Methods Development and Target Manufacturing.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Manufacturing process, validation and factory test
Topics for discussion WWFPC01, CERN, Geneva, June 2015.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
R&D for Fundamental Power Coupler in SRF Mass-Production
Strategy and Status of Reference Cavities for European XFEL
Hiroaki Umezawa CTO Tokyo Denkai Co., Ltd.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
T5.2: Harmonization - Material and Component Reference
Power coupler at DESY & for XFEL
World-Wide Fundamental Power Coupler meeting #3
LAL Status - based on inputs from W. Kaabi and A. Stocchi - cf
Manufacturing of the IFMIF series power couplers
FKPPL and FJPPL Joint Workshop
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
XFEL Collimation and Beam Switchyard Vacuum Issues
Nick Walker (DESY) EU GDE Meeting Oxford
Development of Large Grain Cavities at DESY
Retreatment of Superconducting Cavities for the European XFEL
Ceramic to metal connection.
Production process- your product processing cards, technology
Selection Criteria Properties Availability Cost
Presentation transcript:

TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra

1 Grands Instruments Couplers November 12th 2013 XFEL couplers

2 Grands Instruments General principles 1/3 Design: Design must be done with a complete collaboration of manufacturer(s) Each manufacturer could have his own process managed and could implement for fabrication without changing the final coupler. Sufficient mock ups must be realized with production tools before starting full production November 12th

3 Grands Instruments General principles 2/3 Manufacturing A maximum of task should be non-operator dependent and accept batches, example: Brazing versus welding Never forget that the final yield of production is the result of each individual sub-assemblies: if each sub-assemblies is realized with a 85% yield, for 4 individual sub-assemblies that mean a final yield of 52% (which means that ONE coupler is rejected for each coupler manufactured 2013 November 12th

4 Grands Instruments General principles 2/3 Controls How to avoid too much steps of controls without having lacks? How to implement measurable criteria on each inspection? Tests and RF conditioning How realistic is it to have a complete automatic conditioning of couplers without human control? 2013 November 12th

5 Grands Instruments Design optimisation questions Couplers November 12th 2013 Design questions: Capacitor implementation mandatory? Double window mandatory? Tunable coupler? Could bellows be on the warm parts of the coupler? Losses higher or other material than copper for coating ? TiN coating on ceramic : what could be the influence if ceramic is brased? Other material than TiN for coating ceramics: Ti, TiOx, Cr2o3…

6 Grands Instruments Fabrication issues and difficulties 1/2 Couplers November 12th 2013 Process difficulties Copper coating specification: RRR Thickness including bellows 10 or 30 µm ± 20% Controls: visual control difficulties Not “ real objective criteria” for : controls difficulties in conclusion of defects example:

7 Grands Instruments Fabrication issues and difficulties 2/2 2Couplers November 12th 2013 Process difficulties Cleanliness of individual pieces before coating not always obvious to obtain (contamination) example: Even with more than three hydrogen treatment in furnaces some pieces remain non coatable. Discrepancies between treatments example : US power in bath could have significant impacts picture of CR2O3 coating with various power (factor 2 max) copper coating and TiN coating adherences are also dependent on power

8 conclusion Grands Instruments Couplers November 12 th 2013 Mass production of coupler Is a tricky task At RI and TED we demonstrate that we are able of a production rate of 8 per week but: It is not an easy task It is not finished It is not yet stabilized

9 Grands Instruments Couplers November 12 th 2013 I want to thanks all people working on this project among them specially: C Lievin, E. Lavanchy, G. Garcin, C. Bourat any many other from TED M.Pekeler and M. Knaak from R.I W.Kaabi, A.Gallas from LAL W. D Moeller, D.Kostin, E Vogel and H.Weise from DESY For all the supports and exchanges we had and I hope we will have on the XFEL project