NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Using delay lines on a test station for the Muon Chambers Design considerations (A. F. Barbosa, Jul/2003)
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
NA62 straw tracker readout status Georgios Konstantinou
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system Introduction to NA62 NA62 layout Straw detector Requirements for straw detector electronics.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
TPC FEE status and more TUM Physics Department E18 I.Konorov.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Peter LICHARD CERN (for NA62) 1 NA62 Straw detector read-out system NA62 layout Straw detector Requirements for straw detector electronics Readout electronics.
L. Benussi On Behalf of LNF crew
Status of NA62 straw readout
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
A General Purpose Charge Readout Chip for TPC Applications
NA62 Straw tracker electronics
Analog FE circuitry simulation
A Fast Binary Front - End using a Novel Current-Mode Technique
Test of Link and Control Boards with LHC like beam, CERN, May 2003
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
Characterization of Wired-OR prototype board
Presentation transcript:

NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected activities till December 2010 and for the next year

Characterization and qualification of the frontend electronics Situation – Good quality on time measurement for both leading and trailing edges is crucial for event building, analysis and eventual trigger/veto – CARIOCA Ongoing characterization of the chip From lab and test beam measurements, 1 -7 pulses on single particle depending on gas Waiting for analysis from test beam Frontend board (cover) with 1 bug (reverted output polarity on one chip) – Not serious for test beam – Will be fixed in the next version At the moment all indicates good quality of system design, if decided to go this way we need only small modifications – GASII Ongoing characterization of the chip Not yet connected to straw Test bench measurements show good performance Slightly longer shaping can help with multiple pulses Characterization and test with straws must be finished before December Production plan not yet fixed

Characterization and qualification of the frontend electronics – Discrete electronics Reason – Possibility to tune shaping (avoid multiple pulses on single particle, optimize performance) – Possibility to use constant-fraction discri if needed – Differential input to improve S/N and suppress crosstalk status – Design and simulation finished – 4 channel functional and dimensional demonstrator – 1 channel needs ~10mm strip – PCB designed and going to production – Crucial components already delivered

Characterization and qualification of the frontend electronics

Time jitter What parameters for time measurements? – If only noise from electronics, optimum peaking time is ~8*t0 for point-like ionization – Due to noise from the detector and components around, and due to electron arrival time fluctuation, the good compromise is considered ~(4-6)*t0 – T0 for Ar:CO2 is ~2.3ns, BUT, close to wire (firsts 10nth of ns) it is rather 2-3 times higher due to ion non-linear mobility – T0 which matters for timing (2-3)*2.3ns ~ 5ns – So, peaking time should be (4-6)*5ns = 20ns-30ns (CARIOCA ~12ns, GASII ~17ns, discrete tunable) Jitter of FE alone – CARIOCA done (Johan) – GASII done (Johan) – Discrete when produced ‘real’ time jitter is entirely determined by – Noise from the detector – System noise – Signal formation in the straw

Time jitter CARIOCA and GASII tested with – Delta charge (step voltage over 1.8pF capacitor) – Simulated point-like ionization for t0 = 1ns, 2.5ns, 5ns – Signal to noise ratio = 10

Time jitter CARIOCA Results – Delta 49 ps leading edge 61 ps trailing edge – T0 = 1 ns 61 ps leading edge 170 ps trailing edge – T0 = 2.5 ns 63 ps leading edge 267 pstrailing edge – T0 = 5 ns 66 ps leading edge 417 ps trailing edge

Time jitter GASII Results – Delta 158 ps leading edge 257 ps trailing edge – T0 = 1 ns 218 ps leading edge 402 ps trailing edge – T0 = 2.5 ns 221 ps leading edge 365 ps trailing edge – T0 = 5 ns 241 ps leading edge 405 ps trailing edge

Detector and interface to frontend Web circuit – Big sensitivity observed Placement Distance from straw pin – length Crosstalk – Waiting for test beam results – Test in lab with injected signals and cosmics Noise and sensitivity – Waiting for test beam results – Tests in lab (characterization) of chips – Tests with cosmics and Fe55

Small readout system Design started – 6U VME board Serving 4 SCSI cables with present covers Serving 4 ethernet cables with new frontend (TDC on cover) Readout and control over VME backplane Design service at CERN prepared to do the layout and production ASAP Technical student expected to take a significant role in design, testing and debugging

Plans For the readout of the first chamber next year and common testbeam we have to – Finish characterization and tests of various frontend electronics in December – Finish characterization and tests of detector interface and grounding and shielding in December – Take decision in Dec/Jan on frontend and detector – Develop and construct small readout system (demonstrator) in 2010 – For the testbeam 2011 we can maybe use small readout Study of readout (backend) boards including TELL1 can continue in 2011 (Wo)man power – Myself 70% – Borrowed technician from ESE/ME group till …? – Technical student from

Expected activities till December 2010 Frontend – Characterization of CARIOCA and GASII – Discrete frontend – Results from testbeam Detector interface – Web circuit – Crosstalk – Noise Prototype of readout system – Readout for 4 covers (fe boards) for different versions – Qualification of the connectivity (SCSI or ethernet) – Ordering of cables (depends on previous) – Last two can happen in january 2011 as also depends on final backend

Expected activities in 2011 Frontend – Decision on the analog (CARIOCA,PENN, DISCRETE) – Design and test of preproduction version – Design (if needed) and production of final version for 1 chamber – Develop procedure and electronics for testing and debugging for serial production Define required tests and procedures Injector board and readout Software Backend – Design and production of preproduction readout (SRB or TELL1) – Design (if needed) and production of final readout for 1 chamber – Develop procedure and electronics for testing and debugging for serial production Test beam with one chamber with final electronics