Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.

Slides:



Advertisements
Similar presentations
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Advertisements

Fluid Mechanics 07.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
MOM Report Galina Vankova RAL, MICE Video Conference.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
LHCb-light Meeting –June, 18th 2002 Frédéric MACHEFERT 1 Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Effect of M1-thickness LHCb-light.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
WELCOME Project Electric Power Plant. Electric Power Plant Electric Power Plant.This is the age of Technology. In this age there is no place where we.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
V. Bobillier1 Cable installation status.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Cabling for LHCb Upgrade
Rack Design Proposal as of 01/03/2013
Construction Area Activity Quantity HSD Oil StorageTanks Mechanical works Sand blasting of bottom plates Primer coating of bottom plates Welding of plates.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
CMS Area Working Group Meeting
Radiation-safe area for electronics, or laser or
February 12 – 19, 2018.
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Question & Suggestions March 17th
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
مديريت موثر جلسات Running a Meeting that Works
Represented By:. “Provides Professional Services in Power Supply & Air Conditioning Business” PRESENT AGENDA.
Needed for Team A on -End
Presentation transcript:

Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire

February 20th, 2015Frédéric Machefert - Upgrade infrastructure workshop 2 Cooling of the crates The calorimeter racks are kept Wish to keep on using the cooling system of the « standard » crates (turbines) Maraton power supplies require water cooling

HCAL calibration and hydraulic system Cs source for calibration Source is propelled by an hydraulic system Garage door opening mechanism requires compressed air Pipes running in the cable chain of HCAL Control crate Shares the rack with the 2 front-end crates Source garage At the top corners of the HCAL Hydraulic system (on the HCAL chariot columns) February 20th, 2015Frédéric Machefert - Upgrade infrastructure workshop 3