½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening.

Slides:



Advertisements
Similar presentations
Suspension Systems - 1 Topics covered in this presentation:
Advertisements

Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Module 5 Milling Machines Dr. Salah Gasim Ahmed MET 103
Pipe Supports and Hangers
Honda 450 Installation Manual.
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
How to Tram a Mill Head ME 410 Kaizen Project Summer 2005.
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
Mech assemblymay MuTrFEE Assembly Procedure Mechanical.
ArcelorMittal Technotron s.r.o. Expanded Metal – Fliers and Framings November 2008.
How to Identify a Bolt. The parts of a Bolt A Scale (or Ruler) is used to determine the dimensions of a bolt.
Manufacturing Rounded Shapes ManufacturingProcesses.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Handy Store Fixtures Gondola Dolly Assembly Instructions
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Structural drawing Instructor: M.Yaqub
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Senior Design: Validation of Design December 15, 2008.
General idea of a couple of check rod system and adjustments
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
Pneumatic Clamp Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Plans for Pan-type Bed Shapers
Grimsby Secondary School TCJ3C
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
A PRESENTATION on “ SUSPENSION SYSTEM ”
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
Fundamentals of Structural Detailing
1 Lower Brg Detail Inner cap Bearing Lock Washer 8 = Insulating Tube/ sleeve (slide 6_ * Outer Cap Steel Spacer (slide 4,5) Insulating Spacer (Slide 4,5)
 To point the camera up or down  To turn the camera horizontally.
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Engineering Division 1 HHMI 8.2.X Endstation Modification Review Allan DeMello 12/13/2006.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
BORING MACHINE ENROLLENMENT NO:588,589,590,591,592,593
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Justin Cacciatore, Rebecca Clayman, Bret Olson, Katie Pollock Department of Biomedical Engineering Advisor: Wally Block Client: Lori Hayes, MS R.N. Stereotactic.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
electrical connection (cover to cover)
Plan for the installation of the TAMU screen
Present status of the flux return yoke design
MACH 118: Lathe & Mill 1 Lathe Workholding.
Step IV PRY Preparation - Contents
ME Contest Structure Plan View dia. orange circle
Obj: SWBAT differentiate between different parts of a light
Horizontal Milling Machines and Accessories
How to Identify a Bolt.
SHMS Q2 with Beam Line Shield Pipe
Manufacturing Rounded Shapes
זכויות סוציאליות.
كار همراه با آسودگي و امنيت
Mechanical System P09045: Membrane Characterization Test Stand
SUPPORT FRAME ASSEMBLIES, 4 REQUIRED
STEEL PLATES.
Civil engineering drawing
XY Scanner Mount.
Valve stem “gag” mechanism
Laser Mount.
First prototype module released from the assembling platform
Suspension Systems - 1 Topics covered in this presentation:
Goodman Acquisition Camera
Presentation transcript:

½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening plates 39 ” Tilt adjustment (currently disabled by spacers epoxied between plates) Laser head holder (collets not shown) We could do away with the geophone platforms to reduce weight, if the fixture can be characterized using laser system. Bolts (1/2-13) to attach to clamp

Laser Holder: Critical Dimensions CQS Magnet Laser Head Holder CQS Test Stand

Laser Holder Attachment to the CQS stand Clamp 1/2-13 Bolts 3 on each side Laser holder base is bolted to a clamp, which in turn is attached to the test stand.

Laser Head Holder on the CQS stand