Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009.

Slides:



Advertisements
Similar presentations
Chapter 3 Properties of Random Variables
Advertisements

CLIC CDR Schedules & Value Estimates Philippe Lebrun on behalf of the CLIC Cost & Schedule WG LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
Hypothesis Testing Steps in Hypothesis Testing:
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Chapter 4 Discrete Random Variables and Probability Distributions
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Simple Linear Regression
BCOR 1020 Business Statistics Lecture 15 – March 6, 2008.
Quality Control Procedures put into place to monitor the performance of a laboratory test with regard to accuracy and precision.
1 Simple Linear Regression Chapter Introduction In this chapter we examine the relationship among interval variables via a mathematical equation.
Today Today: Chapter 8 Assignment: 5-R11, 5-R16, 6-3, 6-5, 8-2, 8-8 Recommended Questions: 6-1, 6-2, 6-4, , 8-3, 8-5, 8-7 Reading: –Sections 8.1,
Chapter 5 Continuous Random Variables and Probability Distributions
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Lecture 6: Descriptive Statistics: Probability, Distribution, Univariate Data.
Uncertainty in Engineering - Introduction Jake Blanchard Fall 2010 Uncertainty Analysis for Engineers1.
Lecture II-2: Probability Review
Lecture 28 Dr. MUMTAZ AHMED MTH 161: Introduction To Statistics.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Chapter 2 – Business Forecasting Takesh Luckho. What is Business Forecasting?  Forecasting is about predicting the future as accurately as possible,
B AD 6243: Applied Univariate Statistics Understanding Data and Data Distributions Professor Laku Chidambaram Price College of Business University of Oklahoma.
Ph. Lebrun Issues, methods and organization for costing the CLIC accelerator project Philippe Lebrun Meeting on costing of CLIC detector CERN,
CLIC CDR Schedules & Value Estimates Philippe Lebrun on behalf of the CLIC Cost & Schedule WG CLIC Workshop, CERN 28 January – 1 February 2013.
Error Analysis Accuracy Closeness to the true value Measurement Accuracy – determines the closeness of the measured value to the true value Instrument.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
On project probabilistic cost analysis from LHC tender data Ph. Lebrun CERN, Geneva, Switzerland TILC’09, Tsukuba, Japan April 2009.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CLIC-ILC Cost & Schedule Working Group Meeting TILC09 – Sunday, April 19, 2009 reported by Peter H. Garbincius CLIC_ILC_phg_21april09.ppt.
And, now take you into a WORLD of……………...
Size Standards Analysis: SBA Methodology Presented to: The Council on Federal Procurement of Architectural & Engineering Services (COFPAES) By: Khem R.
1 Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009 Peter’s notes: Thursday, 16july09 PHG - 16july09: added.
Doing business with CERN Anders Unnervik 3 November 2014.
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Since everything is a reflection of our minds, everything can be changed by our minds.
Finance 300 Financial Markets Lecture 3 Fall, 2001© Professor J. Petry
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
Basic Statistics Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Review of fundamental 1 Data mining in 1D: curve fitting by LLS Approximation-generalization tradeoff First homework assignment.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
Chapter 20 Classification and Estimation Classification – Feature selection Good feature have four characteristics: –Discrimination. Features.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
Issues, methods and organization for costing the CLIC accelerator project, with particular focus on BDS & MDI Philippe Lebrun Special BDS-MDI meeting CERN,
Monitoring of a condition of economic systems on the basis of the analysis of dynamics of entropy A.N. Tyrsin 1, O.V. Vorfolomeeva 2 1 – Science and Engineering.
CHAPTER 3 RISK AND RETURN. ©Correia, Flynn, Uliana & Wormald 2 Learning Objectives By the end of the chapter, you should be able to; n Distinguish between.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Lecture 7: Bivariate Statistics. 2 Properties of Standard Deviation Variance is just the square of the S.D. If a constant is added to all scores, it has.
IDR Costing Exercise My presentation today  Some general remarks  What needs to be done for the IDR costing?  What we can realistically expect for the.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Purchasing supplies at CERN
Purchasing supplies at CERN
Outline Introduction Signal, random variable, random process and spectra Analog modulation Analog to digital conversion Digital transmission through baseband.
Ways to industry participation in CLIC 24th October, 2017
FME461 Engineering Design II
Introduction to Instrumentation Engineering
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
CIS12-3 IT Project Management
Continuous distributions
Evaluation by Best Value for Money Methodology
Presentation transcript:

Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009

Progress since TILC’09 CLIC Study Costing Tool –Production version operational [G. Riddone] –Tested on preliminary (partial) cost estimate Analytical cost estimate –PBS of CLIC 500 GeV being established –Discussions with Domain Coordinators started –Establish list of cost drivers & possible alternatives Currency conversion & escalation –Reference currency CHF –Escalation based on two compound indices for industrial prices (≠ consumer prices) of Swiss Federal Statistical Office [input from A. Unnervik, CERN Purchasing] Cost risk analysis –Compromise between accuracy and simplicity –Variance due to industrial procurement: method based on LHC data refined [input from P. Garbincius] –Proposed plan for common CLIC-ILC document CLIC general schedule –Input commissioning and operation of phase 1 [K. Foraz]

Analytical basis is PBS Component level not yet defined List of systems standardized Contact experts per system Coordinators per domain/subdomain Identified for analytical costing based on level 5 description

Cost vs energy What are we comparing? Cost E cm 3 TeV in one phase (CLIC reference) 500 GeV as phase 1 of 3 TeV 500 GeV optimized (ILC comparison) 3 TeV in two phases

Industrial price indices (CH)

Cost variance factors (assumed statistically independent) Evolution of configuration –Maturity of design –Technology breakthroughs –Variation of applicable regulations Technical execution –Off-the-shelf or special product –Qualification & experience of vendors –State of completion of R&D, of industrialization –Series production, automation & learning curve –Rejection rate of production process Structure of market –Mono/oligopoly –Mono/oligopsone Commercial strategy of vendor –Market penetration –Competing productions Inflation and escalation –Raw materials –Industrial prices International procurement –Exchange rates –Taxes, custom duties Engineering judgement of project team Reflected in scatter of offers received from vendors (LHC experience) Tracked and compensated

Scatter of LHC offers as a measure of cost variance Available data: CERN purchasing rules impose to procure on the basis of lowest valid offer ⇒ offers ranked by price with reference to lowest for adjudication by FC Postulate: scatter of (valid) offers received for procurement of LHC components is a measure of their variance due to technical, manufacturing and commercial aspects Survey of 218 offers for LHC machine components (48 contracts) Prices normalized to that of lowest valid offer, i.e. value of contract Exponential PDF fitted to observed frequency distribution with same mean value

LHC tender prices for accelerator components Adjusted to mean (1.46) and total number (218) of sample

From distribution of offers to distribution of prices Consider two valid offers X1, X2 following same exponential distribution with P(Xi<x) = F(x) = 1 – exp[-a(x-b)] ⇒ m = b + 1/a and  = 1/a Price paid (lowest valid offer) is Y = min(X1, X2): what is the probability distribution of Y? Estimate P(Y<x) = P(X1<x or X2<x) = G(x) Combined probability theorem P(X1<x or X2<x) = P(X1<x) + P(X2<x) – P(X1<x and X2<x) If X1 and X2 uncorrelated, P(X1<x and X2<x) = P(X1<x) * P(X2<x) Hence, P(X1<x or X2<x) = P(X1<x) + P(X2<x) – P(X1<x) * P(X2<x) and G(x) = 2 F(x) – F(x) 2 = 1 – exp[-2a(x-b)] ⇒ Y follows exponential distribution with m = b + 1/2a and  = 1/2a By recurrence, if n uncorrelated valid offers X1, X2,…Xn are received, the price paid Y = min (X1, X2,…Xn) will follow an exponential distribution with m = b + 1/na and  = 1/na

Dispersion on prices due to procurement uncertainties For LHC accelerator components –48 contracts –218 offers, i.e offers per contract on average From exponential fit of statistical data on offers, m = 1.46,  = 0.46 We can therefore estimate the expected relative dispersion on paid prices  = 0.46/4.54 ≈ 0.1 ⇒ based on LHC experience, the relative standard deviation on component prices due to procurement uncertainties can be taken as 50/n %, where n is the expected number of valid offers

Towards a method for CLIC cost risk analysis Separate cost risk factors in three classes, assumed independent –Risk of evolution of configuration Judgement of « domain responsible » Rank in 3 levels, numerical values of  config tbd –Price uncertainty in industrial procurement Estimate n number of valid offers to be received Apply  industry = 50/n % –Economical & financial context Deterministic Track currency exchange rates and industrial indices Estimate r.m.s. sum of  config and  industry Compensate economical & financial effects

Proposed plan of CLIC-ILC document on cost risk analysis Introduction –Observed uncertainty on cost of projects –Why and how to cope with it Identification of cost variance factors –Following time line of project development, from conceptual studies and R&D to technical design, configuration management, industrial procurement –Question of correlated/uncorrelated variance factors Boundary conditions imposed by funding & governing bodies –Major differences (managing escalation) lead to different costing methods The CLIC method The ILC method Discussion & conclusion

CLIC Cost & Schedule WG Communication & reporting lines CLIC Cost & Schedule WG CLIC Steering Committee CLIC Technical Committee Other CLIC WG System group ILC GDE Cost Team Other CLIC WG System group reports to PBS, developments & alternatives Configuration Analytical costing Information, methodology Technical design

Statistical modeling of tender prices Heuristic considerations –things tend to cost more rather than less ⇒ statistical distributions of tender prices X i are strongly skew –PDFs f i (x i ) are equal to zero for x i below threshold values b i equal to the lowest market prices available –commercial competition tends to crowd prices close to lowest ⇒ PDFs f i (x i ) are likely to be monotonously decreasing above threshold values b i The exponential PDF is a simple mathematical law satisfying these conditions f(x) = 0 for x < b f(x) = a exp[-a(x-b)] for x ≥ b Characteristics of the exponential law –only two parameters a and b –thresholdb –mean value m = 1/a + b –standard deviation  = 1/a = m – b –« mean value = threshold + one standard deviation »

Exponential vs Gaussian PDFs

LHC cost structure (material) Total 2.2 BEuro

LHC procurement 90 main contracts in advanced technology

DOE cost risk assessment method